X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-127-25643"

m
m
Line 11: Line 11:
 
| County: [[Perry_County,_Ohio|Perry]]
 
| County: [[Perry_County,_Ohio|Perry]]
 
|-
 
|-
| Municipality: [[Thorn_Township,_Perry_County,_Ohio|Thorn Township]]
+
| Municipality: [[Thorn Township,_Perry_County,_Ohio|Thorn Township]]
 
|-
 
|-
 
| Operator Name: [[NGO DEVELOPMENT CORP.]]
 
| Operator Name: [[NGO DEVELOPMENT CORP.]]

Revision as of 19:42, 14 August 2019

Well Details

Well ID: 34-127-25643
Loading map...
Country: United States
State: Ohio
County: Perry
Municipality: Thorn Township
Operator Name: NGO DEVELOPMENT CORP.
Well Pad ID:
Farm/Lease Name: KING
License Status: Final Restoration
License Date: 1990-04-05
Spud Date: 1982-05-06
Spud Drilling Contractor: H & S DRLG
Final Drill Date: 1982-06-02
Well Total Depth: 2822 ft
Configuration: Vertical
Latitude: 39.856071861
Longitude: -82.38719465

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1982-05-03 424 NATIONAL PRODUCTION CORP GeoDate 5/3/82
Oil and Gas 1982-05-03 Issued Date 5/3/82 Expired Date 11/2/82 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 02822 Proposed Drill Depth 02822
Original Spud 1982-05-06
Completed 1982-06-02
Reached Total Depth 1982-06-02
Completion Report Received 1984-08-22
CO 1990-04-05 424 NATIONAL PRODUCTION CORP GeoDate 4/5/90
GAS WELL 1990-04-05 Issued Date 4/5/90 Expired Date 4/5/91 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date 7/23/90
Plugged/Abandoned 1990-07-23
Construction Permit Expires 1991-04-05
Change of Owner 2004-04-02 Operator changed from 424, NATIONAL PRODUCTION CORP to 98, NGO DEVELOPMENT CORP.
Record Last Modified 2013-03-14

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 0 0
2006-09-11 2732 2786 11

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 4500 Bbl 30000 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1984 NATIONAL PRODUCTION CORP 26008 142 0
1985 NATIONAL PRODUCTION CORP 17710 0 329
1986 NATIONAL PRODUCTION CORP 16102 156 351
1987 NATIONAL PRODUCTION CORP 6743 42 359
1989 NATIONAL PRODUCTION CORP 752 11 358
1990 NATIONAL PRODUCTION CORP 451 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1984 NATIONAL PRODUCTION CORP Brine 0 0
1985 NATIONAL PRODUCTION CORP Brine 257 329
1986 NATIONAL PRODUCTION CORP Brine 243 351
1987 NATIONAL PRODUCTION CORP Brine 5 359
1989 NATIONAL PRODUCTION CORP Brine 164 358
1990 NATIONAL PRODUCTION CORP Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000009884 Final Restoration No Violations PASSED Y WITNESSED 8/8/95 INSPECTOR GERALD YOUNG DATE 08/0819/95 DATA FROM OLD VAX INFO
0000009885 Final Restoration No Violations PASSED WITNESSED INSPECTOR DATE 00/0019/00 DATA FROM OLD VAX INFO

For data sources see[9]

References