X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-099-23117"

m
m
Line 21: Line 21:
 
| License Status: Producing
 
| License Status: Producing
 
|-
 
|-
| License Date: 2011-04-22
+
| License Date: 2010-04-13
 
|-
 
|-
 
| Spud Date: 2010-11-09
 
| Spud Date: 2010-11-09

Revision as of 06:55, 30 July 2019

Well Details

Well ID: 34-099-23117
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Boardman Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: COLEMAN UNIT
License Status: Producing
License Date: 2010-04-13
Spud Date: 2010-11-09
Spud Drilling Contractor: WILDCAT DRILLING
Final Drill Date: 2010-11-18
Well Total Depth: 6060 ft
Configuration: Directional
Latitude: 41.045715932
Longitude: -80.64194430

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2009-06-26 Proposed Formations:CLINTON, Issued Date:6/26/2009, Expired Date:6/26/2010 6:00:00 AM, Drilling unit acres:51.22, Proposed Well Type:OG, Proposed Well Class:POOL
APP 2010-04-13 Proposed Formations:CLINTON, Issued Date:4/13/2010, Expired Date:4/13/2011 6:00:00 AM, Drilling unit acres:51.22, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-11-18
Completion Report Received 2010-12-27
Correction to Well 2011-02-07 CORRECTION TO TARGET INFORMATION (AS DRILLED SURVEY): FOOTAGE= 995'SL & 2675'EL OF LOT 19, 4TH DIVISION; X= 2,511, 650 AND Y= 509,060.
Construction Permit Expires 2011-04-13
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-04-22 5738 5808 106

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-12-01 H2O 7 3050 Bbl 80000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2011 EVERFLOW EASTERN PTNS L P 28403 0 362
2012 EVERFLOW EASTERN PTNS L P 27246 0 246
2013 EVERFLOW EASTERN PTNS L P 16608 0 365
2014 EVERFLOW EASTERN PTNS L P 20567 0 260
2015 EVERFLOW EASTERN PTNS L P 54 0 365
2016 EVERFLOW EASTERN PTNS L P 189 0 365
2017 EVERFLOW EASTERN PTNS L P 11637 0 365
2018 EVERFLOW EASTERN PTNS L P 8292 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2011 EVERFLOW EASTERN PTNS L P Brine 238 362
2012 EVERFLOW EASTERN PTNS L P Brine 47 246
2013 EVERFLOW EASTERN PTNS L P Brine 0 365
2014 EVERFLOW EASTERN PTNS L P Brine 0 260
2015 EVERFLOW EASTERN PTNS L P Brine 9 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0114448614 2010-12-02 UrbanPreliminary Restoration No Violations I performed a Urban preliminary restoration status check. I inspected the Cranberry Ct and found no mud or debris. The frac tanks have been removed. The area has been cleaned up and the ground bladed off . I called George Strawn about the frac tanks. He had hauled all 6 frac tanks out yesterday. He was done by 5:30PM, 12/1/10
0500041660 2011-09-06 Preliminary Restoration No Violations Locked board on board fence around well head and locked chain link fence around tank battery with ID sign posted on both. Top soil graded out and seeded. Vegetation established, grass growing. Passes Preliminary Restoration. No violations at this time.
0578876656 2017-12-13 Production Wells No Violations The purpose of my inspection was to conduct a status check on well #2-3117. Inspector John Fleming was present during the inspection. A review of RBDMS indicated production reporting was current. Access to the well was through a residential lot. The well head was enclosed by a locked board fence enclosure. Correct identification was present. The 8.625 well head was above grade and open to atmosphere. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the open position. No leaks were observed. All production equipment was within a locked chain-link fence enclosure. The location was shared with #2-2260. Correct identification was present. A worn earthen dike that was free of fluid was present around the equipment. Equipment within the dike consisted of one (1) vertical separator and one (1) 100 bbl production tank. The separator remained in good repair and contained a current 7 day production chart. The production tank remained in good repair. Valves were closed, locked and plugged. A lightening arrestor was present. While on location Inspector Fleming called and spoke with lease operator George Strawn. Mr. Strawn reported the two wells made minimal amounts of fluid. At the time of inspection, Mr. Strawn reported the tank held 3 feet and 1 inch of fluid. The condition of the dike did not present a clear and present hazard. No improvements to the dike would be necessary at this time. No violations were observed during this inspection.
0604993404 2010-12-01 UrbanPreliminary Restoration No Violations I received a phone call from April Bott(Bott Law Group LLC 614-832-2627) about coming into the drilling location from another way. Ms. Bott was concerned about the traffic on Cranberry Ct. Everflow contacted me about changing the access for the frac only to come off of Cranberry Court and not Indianola road. I approved of this move due to the traffic and school buses that travel this road. This property is owned by Colemans. Everflow had received approval from them about the access change. Ms. Bott wanted the frac to stop and the frac tanks moved away from her brothers property which is the last house on Cranberry Ct, south side. I told her to contact Jay Cheslock about the matter. I requested from Everflow a letter stating that Everflow request a change in access from Indianola road to Cranberry Ct. and a letter from the Boardman Township that shows they approve of this change. I revised the pre-site on this well to show the temporary change in the access to this well. At 9:00AM I emailed Ms. Bott about the revised pre-site showing the temporary access. At 1:57PM I emailed Ms. Bott 2 letters, one from Everflow requesting the change and one from Boardman Township approving of the change. The Boardman statement was With regards to the township, we agree with this request and feel it is in the best interests of our residents due to the inclement weather conditions and for traffic and safety considerations due to the school bus traffic. Ms. Continued to ask for more information. She wanted the cover letter or fax cover letter to these 2 letters. I told her in an email that there were no cover letters. Ms. Bott wanted to know how I received the letters. I answered by saying the letters were hand delivered to me at the location. I have received no further correspondence. This complaint is resolved.
0652022328 2011-04-06 UrbanPreliminary Restoration No Violations The board on board fence and the ID sign were posted. There is still a large top soil pile on the north side of the wellhead. There were no violations at this time
0657073898 2011-06-09 UrbanPreliminary Restoration No Violations The drillig area was rough graded in. The direct area around the wellhead was still wet. The ID sign and board on board fence were up. There were no violations at this time.
1170907922 2011-01-28 UrbanPreliminary Restoration No Violations The top soil pile is still on the drilling location. The board on board fence and ID sign were installed. There were no violations at this time.
1258093834 2010-11-08 Drill / Deepen / Reopen No Violations I received a call from Mrs. Bonnie Dulton of 761 Indianola road. Mrs Dulton wanted to know why she wasnt told about the rig coming in. She was not in the unit. I made a copy of the unit boundary to show her. She still didnt like it but she said she couldnt do anything about it and thanked me for coming out. This complaint is resolved.
1289564558 2010-11-10 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 5/8 casing. There were no violations at this time.
1289565337 2010-11-10 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig 1. The crew were runing in the hole with 8 5/8 casing. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1290167633 2010-11-18 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The crew had just finished making a bit trip. The drilling depth was 5893. Drilling on fluid. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1291058934 2010-11-29 UrbanPreliminary Restoration No Violations The drilling pits are closed. Everflow was logging this well. The company was Hot Well Services INC. Tom Wood was on location. There were no violations at this time.
1291290479 2010-12-01 UrbanPreliminary Restoration No Violations I witnessed the fracing of the Clinton zone by Universal Well Service and Tom Wood, the Everflow consultant. There were no violations at this time.
1311187959 2011-07-20 UrbanPreliminary Restoration No Violations The final grade is complete around the wellhead. The area is still muddy. There were no violations at this time.
1312999943 2011-08-10 Preliminary Restoration No Violations Board on board fencing installed around well head. ID sign posted. Top soil graded out, area seeded and straw put down. Not much grass growth. Some bare spots remain. Still wet in some places. Does not pass preliminary restoration at this time
1390123684 2010-11-16 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drilling depth was 5361, drilling on fluid and still in the directional. This inspection satisfies 1501:9-9-03. There were no violations at this time.
1569722738 2010-11-16 Drill / Deepen / Reopen No Violations I received a call from Ms. Renee Centrello of 1230 Thalia Ave, Boardman about her water well. Her residence is some 1/4 mile north of the drilling location. Her concern was that the well may have done something to her water well and would like the water well checked. She stated that back in 1988 Everflow drilled a well and messed up her water well for sometime. I told her I would call Kyle Tharp, the Geologist for the state. I called Kyle about this well. He would call her to set up a time next week to test her water well. I called Ms. Centrello back to tell her about next week. She had called Everflow about this well. Everflow told her that this well is almost drilled. She did not believe them. I told her the drilling depth was 5361. She was amazed that she did not see the rig until yesterday. I told her that we had set surface on this well last week. Kyle will test well next week. The complaint number is 2912. This case continues.
1919079782 2010-11-23 UrbanPreliminary Restoration No Violations The drilling pits were getting solidified. There were no violations at this time.
1954933237 2011-01-11 UrbanPreliminary Restoration No Violations The top soil is still piled up at the drilling site. The board on board fence with ID sign is around the wellhead. The existing tank battery is already fenced in.
2114825949 2010-11-17 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The rig was 5752 drilling on fluid. This inspection satisfies 1501:9-9-03. There were no violations at this time.
2134578920 2010-11-15 Drill / Deepen / Reopen No Violations I performed a rig inspection on Wildcat rig #1. The drillling depth was 4897 and in the directional hole. This inspection satisfies 1501:9-9-03. There were no violations at this time.

For data sources see[9]

References