If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Geauga_County,_Ohio|Geauga]] | | County: [[Geauga_County,_Ohio|Geauga]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Troy Township,_Geauga_County,_Ohio|Troy Township]] |
|- | |- | ||
| Operator Name: [[P & S ENERGY INC]] | | Operator Name: [[P & S ENERGY INC]] | ||
Line 33: | Line 33: | ||
| Configuration: Vertical | | Configuration: Vertical | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: <Latitude> |
|- | |- | ||
| Longitude: -81.13016733 | | Longitude: -81.13016733 |
Well ID: 34-055-21595 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.3567914,"lon":-81.13016733,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Geauga | |
Municipality: Troy Township | |
Operator Name: P & S ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: PERZESKY UNIT | |
License Status: Final Restoration | |
License Date: 1989-04-24 | |
Spud Date: 1989-07-19 | |
Spud Drilling Contractor: [[EPC [EASTERN PETROLEUM]]] | |
Final Drill Date: 1989-07-24 | |
Well Total Depth: 4266 ft | |
Configuration: Vertical | |
Latitude: <Latitude> | |
Longitude: -81.13016733 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Original Spud | 1988-07-19 | I.P. DRY HOLE. |
CO | 1989-04-24 | 2816 P & S ENERGY INC GeoDate 4/24/89 |
Oil and Gas | 1989-04-24 | Issued Date 4/24/89 Expired Date 4/24/90 Acres 0051533 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04266 Proposed Drill Depth 04266 |
Completed | 1989-07-24 | I.P. DRY HOLE. |
Reached Total Depth | 1989-07-24 | I.P. DRY HOLE. |
Plugged/Abandoned | 1989-07-25 | I.P. DRY HOLE. |
Completion Report Received | 1989-07-28 | I.P. DRY HOLE. |
Construction Permit Expires | 1990-04-24 | I.P. DRY HOLE. |
Record Last Modified | 2017-02-15 | I.P. DRY HOLE. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 4036 | 4150 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | DRY HOLE-NOT TREATED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | P & S ENERGY INC | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1989 | P & S ENERGY INC | Brine | 840 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000DP2251 | Final Restoration | No Violations | Final Restoration done information from Data Point |
For data sources see[9]