If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Muskingum_County,_Ohio|Muskingum]] | | County: [[Muskingum_County,_Ohio|Muskingum]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Springfield Township,_Muskingum_County,_Ohio|Springfield Township]] |
|- | |- | ||
| Operator Name: [[CAMERON BROTHERS]] | | Operator Name: [[CAMERON BROTHERS]] |
Well ID: 34-119-27402 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.940883255,"lon":-82.04886824,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Springfield Township | |
Operator Name: CAMERON BROTHERS | |
Well Pad ID: | |
Farm/Lease Name: REHL D | |
License Status: Final Restoration | |
License Date: 1989-03-14 | |
Spud Date: 1986-08-21 | |
Spud Drilling Contractor: UNGER DRILLING | |
Final Drill Date: 1986-08-26 | |
Well Total Depth: 3693 ft | |
Configuration: Vertical | |
Latitude: 39.940883255 | |
Longitude: -82.04886824 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1986-08-13 | Issued Date 8/13/86 Expired Date 8/13/87 Acres 0000000 Tool Type CRA Proposed Formation Proposed Depth 03693 Proposed Drill Depth 03693 |
Original Spud | 1986-08-21 | |
Completed | 1986-08-26 | |
Reached Total Depth | 1986-08-26 | |
CO | 1986-09-18 | 81 CAMERON BROTHERS GeoDate 8/13/86 |
Completion Report Received | 1986-09-24 | |
CO | 1989-03-14 | 81 CAMERON BROTHERS GeoDate 3/14/89 |
Unknown | 1989-03-14 | Issued Date 3/14/89 Expired Date 3/14/90 Proposed Purpose OG Was Plug Supervised Who Superivsed Plug and Abandon Date |
Construction Permit Expires | 1990-03-14 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3478 | 3526 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 50000 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | CAMERON BROTHERS | 1680 | 53 | 365 |
1987 | CAMERON BROTHERS | 4419 | 75 | 365 |
1988 | CAMERON BROTHERS | 1072 | 68 | 365 |
1989 | CAMERON BROTHERS | 343 | 53 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | CAMERON BROTHERS | Brine | 530 | 365 |
1987 | CAMERON BROTHERS | Brine | 1025 | 365 |
1988 | CAMERON BROTHERS | Brine | 1085 | 365 |
1989 | CAMERON BROTHERS | Brine | 385 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL7975 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0125519058 | 2006-10-24 | Final Restoration | No Violations | No sign of well in field. |
For data sources see[9]