If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Harrison_County,_Ohio|Harrison]] | | County: [[Harrison_County,_Ohio|Harrison]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Stock Township,_Harrison_County,_Ohio|Stock Township]] |
|- | |- | ||
| Operator Name: [[CHESAPEAKE EXPLORATION LLC]] | | Operator Name: [[CHESAPEAKE EXPLORATION LLC]] |
Well ID: 34-067-21068 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.351526867,"lon":-81.13129773,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000335 | |
Farm/Lease Name: HENDERSON SOUTH 10-12-6 | |
License Status: Producing | |
License Date: 2012-03-19 | |
Spud Date: 2012-11-04 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2012-11-19 | |
Well Total Depth: 13867 ft | |
Configuration: Horizontal | |
Latitude: 40.351526867 | |
Longitude: -81.13129773 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-03-19 | Proposed Formations:POINT PLEASANT, Issued Date:3/19/2012, Expired Date:3/19/2014 12:00:00 PM, Drilling unit acres:153.24, Proposed Well Type:OG, Proposed Well Class:EDPW |
Correction to Well | 2012-03-23 | CORRECTION TO TARGET X COORDINATE. |
Reached Total Depth | 2012-11-19 | |
Correction to Well | 2013-04-12 | CORRECTION TO TARGET INFORMATION: FOOTAGE & X,Y COORDINATES FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 140.99 ACRES. |
Completion Report Received | 2013-09-25 | |
Construction Permit Expires | 2014-03-19 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2013-09-30 | 8417 | 13667 | 504 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 01/13/2013 | 01/13/2013 | 7934.00 | 3,861,396.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 77.67 | ||
Recycled Produced Water | Carrier/Base Fluid | Water | 7732-18-5 | 100.00 | 4.87 | |||
Acid, Hydrochloric 15pct, A264
B244, B317, J218, J475, J580 J609, J610, L058, L071, S001 W054, 100 Mesh Sand, Northern White Sand |
Schlumberger | Acid, Anti-Bacterial Agent, Breaker, Corrosion Inhibitor, Cross Linker, Friction Reducer, Gelling Agent, Iron Control Agent, KCl Substitute, Non-Emulsifier, Scale Inhibitor, Proppant - Natural | Alkenes, C>10 .alpha.- | 64743-02-8 | 0.00034000 | 0.00006000 | ||
Calcium chloride | 10043-52-4 | 0.03 | 0.00574000 | |||||
Talc | 14807-96-6 | 0.00008000 | 0.00001000 | |||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0.00001000 | 0.00001000 | |||||
Guar gum | 9000-30-0 | 0.41 | 0.07 | |||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0.00161000 | 0.00028000 | |||||
Ammonium sulfate | 7783-20-2 | 0.04 | 0.00836000 | |||||
Thiourea polymer | 68527-49-1 | 0.00167000 | 0.00028000 | |||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0.00001000 | 0.00001000 | |||||
Ethylenediaminetetraacetic acid tetrasodium salt hydrate | 64-02-8 | 0.00011000 | 0.00002000 | |||||
Peroxydisulfuric acid, diammonium salt | 7727-54-0 | 0.01 | 0.00310000 | |||||
Silica, amorphous | 7631-86-9 | 0.00163000 | 0.00028000 | |||||
Dimethyl polysiloxane | 63148-62-9 | 0.00005000 | 0.00001000 | |||||
Quartz | 14808-60-7 | 97.60 | 16.66 | |||||
Boric acid, dipotassium salt | 1332-77-0 | 0.06 | 0.01 | |||||
Oxyalkylated nonyl phenolic resin | 30846-35-6 | 0.02 | 0.00510000 | |||||
Sodium chloride | 7647-14-5 | 0.00060000 | 0.00010000 | |||||
2-Propenoic acid, 2-methyl-, polymer with sodium 2-methyl-2-((1-oxo-2-
propen-1-yl)amino)-1-propanesulfonate (1:1) |
136793-29-8 | 0.00555000 | 0.00095000 | |||||
Acrylamide-sodium-2-acrylamido-2-methlypropane sulfonate copolymer | 38193-60-1 | 0.05 | 0.00885000 | |||||
Solvent naphtha, petroleum, heavy arom. | 64742-94-5 | 0.02 | 0.00345000 | |||||
Alcohols, C7-9-iso-, C8-rich, ethoxylated | 78330-19-5 | 0.04 | 0.00683000 | |||||
Propargyl alcohol | 107-19-7 | 0.00052000 | 0.00009000 | |||||
Glutaraldehyde | 111-30-8 | 0.03 | 0.00548000 | |||||
Water | 7732-18-5 | 2.19 | 0.38 | |||||
Hydrochloric acid | 7647-01-0 | 0.88 | 0.15 | |||||
Potassium hydroxide | 1310-58-3 | 0.02 | 0.00387000 | |||||
Ethoxylated C14-15 alcohols | 68951-67-7 | 0.00077000 | 0.00013000 | |||||
Methanol | 67-56-1 | 0.22 | 0.03 | |||||
Decamethylcyclopentasiloxane | 541-02-6 | 0.00001000 | 0.00001000 | |||||
Urea | 57-13-6 | 0.00341000 | 0.00058000 | |||||
Alcohols, C11-14-iso-, C13-rich, ethoxylated | 78330-21-9 | 0.01 | 0.00338000 | |||||
Alcohols, C9-11-iso-, C10-rich, ethoxylated | 78330-20-8 | 0.04 | 0.00683000 | |||||
Sodium erythorbate | 6381-77-7 | 0.00399000 | 0.00068000 | |||||
Sodium sulfate | 7757-82-6 | 0.02 | 0.00361000 | |||||
Quaternary ammonium compounds, benzyl-C10-16- | 68989-00-4 | 0.01 | 0.00338000 | |||||
Silica, amorphous precipitated | 67762-90-7 | 0.00001000 | 0.00001000 | |||||
Trisodium phosphate | 7601-54-9 | 0.00386000 | 0.00066000 | |||||
Potassium chloride | 7447-40-7 | 0.00198000 | 0.00034000 | |||||
Choline chloride | 67-48-1 | 0.39 | 0.06 | |||||
Sodium hydroxide | 1310-73-2 | 0.00001000 | 0.00001000 | |||||
Polyethylene glycol | 25322-68-3 | 0.00889000 | 0.00152000 | |||||
Ethylene glycol | 107-21-1 | 0.00110000 | 0.00019000 | |||||
Naphthalene | 91-20-3 | 0.00404000 | 0.00069000 | |||||
Fatty acids, tall-oil | 61790-12-3 | 0.00202000 | 0.00035000 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-01-19 | H2O | 15 | 6382 Bbl | 452901 | Schlumberger | stage 14, 36 shots |
2013-01-14 | H2O | 15 | 5841 Bbl | 451220 | Schlumberger | stage 3, 36 shots |
2013-01-17 | H2O | 15 | 7644 Bbl | 447681 | Schlumberger | stage 8, 36 shots |
2013-01-14 | H2O | 15 | 5924 Bbl | 451693 | Schlumberger | stage 2, 36 shots |
2013-01-19 | H2O | 15 | 6017 Bbl | 457681 | Schlumberger | stage 13, 36 shots |
2013-01-18 | H2O | 15 | 5494 Bbl | 449301 | Schlumberger | stage 12, 36 shots |
2013-01-17 | H2O | 15 | 6202 Bbl | 447681 | Schlumberger | stage 9, 36 shots |
2013-01-18 | H2O | 15 | 5082 Bbl | 445861 | Schlumberger | stage 11, 36 shots |
2013-01-15 | H2O | 15 | 6224 Bbl | 456590 | Schlumberger | stage 5, 36 shots |
2013-01-17 | H2O | 15 | 6256 Bbl | 452941 | Schlumberger | stage 10, 36 shots |
2013-01-13 | H2O | 15 | 6624 Bbl | 454559 | Schlumberger | stage 1, 36 shots |
2013-01-16 | H2O | 15 | 5835 Bbl | 457120 | Schlumberger | stage 7, 36 shots |
2013-01-14 | H2O | 15 | 6042 Bbl | 451001 | Schlumberger | stage 4, 36 shots |
2013-01-16 | H2O | 15 | 5645 Bbl | 452000 | Schlumberger | stage 6, 36 shots |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 214413 | 38609 | 187 |
2014 | CHESAPEAKE EXPLORATION LLC | 159723 | 23683 | 277 |
2015 | CHESAPEAKE EXPLORATION LLC | 122162 | 16560 | 344 |
2016 | CHESAPEAKE EXPLORATION LLC | 93878 | 11271 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | 74864 | 7940 | 333 |
2018 | CHESAPEAKE EXPLORATION LLC | 71379 | 7635 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | 24608 | 1541 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 9733 | 187 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 3192 | 277 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2249 | 344 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 2893 | 366 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 1779 | 333 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1327 | 365 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 416 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0780628708 | 2017-10-12 | Production Wells | No Violations | On the day of my inspection I found the pad to contain two plunger lift wells. Production equipment includes eight 400 barrel production tanks, two vertical seperators, two GPUs, one combustor, one compressor and a vapor recovery system. . |
1068370986 | 2013-09-26 | Preliminary Restoration | No Violations | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. |
1352147766 | 2012-11-05 | Drill / Deepen / Reopen | No Violations | I am on site today to witness the running and cementing of the 13 3/8 surface casing string. Nomac Rig # 39 ran 592 ft of casing in a 17.5 inch well. Halliburton is on site to cement the casing. Halliburton circulated 30 barrels of good cement returns back to surface and into the 1/2 tanks. |
1858048456 | 2016-02-22 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted are utilizing a plunger lift system. RBDMS production records indicate that the wells are in production.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 2 Producing wells 2 Sand separators 2 Horizontal heater-treaters 1 combustor 1 compressor 1 Low pressure separator tower/Vapor recovery system unit. The site passed preliminary restoration in accordance with ORC 1509.072 A. |
For data sources see[10]