X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-059-25283"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[EQT PROD CO]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 194: Line 194:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 199: Line 200:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-A01
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 0.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
|
 
|-
 
| 2010-S01
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 0.00 Bbl
 
| IDENTIFY METHOD IN COMMENTS
 
|
 
|-
 
| 2010-S02
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 5.00 Bbl
 
| style="text-align: right;" | 5.00 Bbl
Line 217: Line 207:
 
| 34-167-28466
 
| 34-167-28466
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 283.00 Bbl
 
| style="text-align: right;" | 283.00 Bbl
Line 223: Line 214:
 
| 34-121-24037
 
| 34-121-24037
 
|-
 
|-
| 2010-S02
+
| 2010
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 333.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| 34-167-28466
 
|-
 
| 2010-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 2,505.00 Bbl
 
| style="text-align: right;" | 2,505.00 Bbl
Line 235: Line 221:
 
| 34-167-29359
 
| 34-167-29359
 
|-
 
|-
| 2011-S01
+
| 2010
| Drilling Fluid Waste (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 238.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 333.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW001
+
| 34-167-28466
 
|-
 
|-
| 2011-S01
+
| 2010
| Fracing Fluid Waste (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 17,976.00 Bbl
+
| Drilling Fluid Waste (in Barrels)
| REUSE OTHER THAN ROAD SPREADING
+
| style="text-align: right;" | 0.00 Bbl
 +
| IDENTIFY METHOD IN COMMENTS
 
|  
 
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 229.00 Bbl
+
| style="text-align: right;" | 959.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 110.00 Bbl
+
| style="text-align: right;" | 233.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 301353
+
| 34-121-24037
 
|-
 
|-
| 2011-S01
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 112.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 7,800.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-059-24067
+
| WMGR123SW001
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 233.00 Bbl
+
| style="text-align: right;" | 1,046.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-121-24037
+
| 34-167-28466
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 233.00 Bbl
+
| style="text-align: right;" | 110.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-167-28466
+
| 301353
 
|-
 
|-
| 2011-S01
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 299.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2011-S02
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
| style="text-align: right;" | 303.00 Bbl
+
| style="text-align: right;" | 238.00 Bbl
| INJECTION DISPOSAL WELL
+
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-009-21899
+
| WMGR123SW001
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[EQT PROD CO]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 113.00 Bbl
 
| style="text-align: right;" | 113.00 Bbl
Line 295: Line 284:
 
| 34-059-24067
 
| 34-059-24067
 
|-
 
|-
| 2011-S02
+
| 2011
| Fracing Fluid Waste (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 7,800.00 Bbl
+
| Produced Fluid (in Barrels)
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| style="text-align: right;" | 486.00 Bbl
| WMGR123SW001
+
| INJECTION DISPOSAL WELL
 +
| 34-117-23388
 +
|-
 +
| 2011
 +
| [[EQT PROD CO]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 100.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-083-24137
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 112.00 Bbl
+
| style="text-align: right;" | 341.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
|  
 
|  
 
|-
 
|-
| 2011-S02
+
| 2011
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 813.00 Bbl
+
| style="text-align: right;" | 112.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| 34-167-28466
+
| 34-059-24067
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 100.00 Bbl
+
| Drilling Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 303.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-083-24137
+
| 34-009-21899
 
|-
 
|-
| 2011-S02
+
| 2011
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 486.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
| INJECTION DISPOSAL WELL
+
| style="text-align: right;" | 17,976.00 Bbl
| 34-117-23388
 
|-
 
| 2011-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 660.00 Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 114.00 Bbl
 
| style="text-align: right;" | 114.00 Bbl
Line 337: Line 333:
 
| 2D0855151
 
| 2D0855151
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[EQT PROD CO]]
 +
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 114.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-167-28462
 +
|-
 +
| 2012
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 542.00 Bbl
 
| style="text-align: right;" | 542.00 Bbl
Line 343: Line 347:
 
| 34-083-24137
 
| 34-083-24137
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[EQT PROD CO]]
 +
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 1,900.00 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2012
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 172.00 Bbl
 
| style="text-align: right;" | 172.00 Bbl
Line 349: Line 361:
 
| 34-117-23388
 
| 34-117-23388
 
|-
 
|-
| 2012-S01
+
| 2012
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 219.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-167-28466
 
|-
 
| 2012-S01
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,071.00 Bbl
+
| style="text-align: right;" | 2,024.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2012-S02
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 1,900.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2012-S02
 
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 114.00 Bbl
+
| style="text-align: right;" | 332.00 Bbl
| INJECTION DISPOSAL WELL
 
| 34-167-28462
 
|-
 
| 2012-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 113.00 Bbl
 
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-167-28466
 
| 34-167-28466
 
|-
 
|-
| 2012-S02
+
| 2013
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 953.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2013-S01
 
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 1,300.00 Bbl
 
| style="text-align: right;" | 1,300.00 Bbl
Line 391: Line 382:
 
|  
 
|  
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 9,345.00 Bbl
+
| style="text-align: right;" | 9,985.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2014
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 640.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,007.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
 
| Fracturing Fluid Waste (in Tons)
 
| Fracturing Fluid Waste (in Tons)
 
| style="text-align: right;" | 22.00 Tons
 
| style="text-align: right;" | 22.00 Tons
Line 415: Line 396:
 
| SWF 1032-WV0109
 
| SWF 1032-WV0109
 
|-
 
|-
| 2014-S02
+
| 2014
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 3,020.00 Bbl
+
| style="text-align: right;" | 4,027.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[EQT PROD CO]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 217.00 Bbl
 
| style="text-align: right;" | 217.00 Bbl
Line 427: Line 410:
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2015
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 4,104.00 Bbl
+
| style="text-align: right;" | 4,277.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[EQT PROD CO]]
| style="text-align: right;" | 173.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 953.00 Bbl
+
| style="text-align: right;" | 1,441.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016-S02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 488.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2017-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 36.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 34.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 330.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 211.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M07
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 10.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 10.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 110.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 29.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 55.45 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M12
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 12.47 Bbl
 
| style="text-align: right;" | 12.47 Bbl
Line 517: Line 431:
 
| 34-157-25511
 
| 34-157-25511
 
|-
 
|-
| 2017-M12
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 16.13 Bbl
+
| Other Oil & Gas Wastes (in Barrels) RWC 899
 +
| style="text-align: right;" | 10.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2017
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 24.18 Bbl
+
| style="text-align: right;" | 911.58 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M02
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 16.90 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 26.56 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 5.51 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 2.75 Bbl
 
| style="text-align: right;" | 2.75 Bbl
Line 559: Line 452:
 
|  
 
|  
 
|-
 
|-
| 2018-M04
+
| 2018
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 6.16 Bbl
+
| style="text-align: right;" | 150.27 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M05
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 8.14 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 13.04 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 15.71 Bbl
+
| style="text-align: right;" | 47.13 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M07
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 22.50 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 8.13 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 15.71 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 7.54 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M10
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 9.17 Bbl
+
| style="text-align: right;" | 37.44 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M10
+
| 2019
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 9.17 Bbl
+
| style="text-align: right;" | 15.27 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M11
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 15.71 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 4.24 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 5.86 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M12
+
| 2019
 +
| [[EQT PROD CO]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 18.11 Bbl
+
| style="text-align: right;" | 53.54 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2019-M01
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 23.12 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| style="text-align: right;" | 18.57 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 15.69 Bbl
 
| style="text-align: right;" | 15.69 Bbl
Line 661: Line 494:
 
| 34-009-23823
 
| 34-009-23823
 
|-
 
|-
| 2019-M02
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[EQT PROD CO]]
| style="text-align: right;" | 15.27 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 5.09 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
 
| Other Oil & Gas Wastes (in Barrels) RWC 899
| style="text-align: right;" | 18.57 Bbl
+
| style="text-align: right;" | 37.14 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.33 Bbl
 
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  

Revision as of 11:54, 19 August 2019

Well Details

Well ID: 37-059-25283
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Morgan Township
Operator Name: EQT PROD CO
Well Pad ID: 151352
Farm/Lease Name: HILDEBRAND 590219
License Status: Active
Spud Date: 2009-12-26
Permit Date: 2009-08-07
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.978582
Longitude: -80.093881

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 EQT PROD CO 0.00 0 0.00 0 0.00 0
2010 EQT PROD CO 845,871.00 157 0.00 157 0.00 0
2011 EQT PROD CO 1,086,485.00 365 0.00 181 0.00 181
2012 EQT PROD CO 808,337.00 366 0.00 0 0.00 0
2013 EQT PROD CO 605,332.00 365 0.00 0 0.00 0
2014 EQT PROD CO 434,030.00 365 0.00 0 0.00 0
2015 EQT PROD CO 430,933.00 357 0.00 0 0.00 0
2016 EQT PROD CO 320,895.00 364 0.00 0 0.00 0
2017 EQT PROD CO 262,789.00 365 0.00 0 0.00 0
2018 EQT PROD CO 211,230.00 344 0.00 0 0.00 0
2019 EQT PROD CO 41,463.00 87 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 EQT PROD CO Fracing Fluid Waste (in Barrels) 5.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2010 EQT PROD CO Produced Fluid (in Barrels) 283.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2010 EQT PROD CO Produced Fluid (in Barrels) 2,505.00 Bbl IDENTIFY METHOD IN COMMENTS 34-167-29359
2010 EQT PROD CO Produced Fluid (in Barrels) 333.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2010 EQT PROD CO Drilling Fluid Waste (in Barrels) 0.00 Bbl IDENTIFY METHOD IN COMMENTS
2011 EQT PROD CO Produced Fluid (in Barrels) 959.00 Bbl REUSE OTHER THAN ROAD SPREADING
2011 EQT PROD CO Produced Fluid (in Barrels) 233.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-121-24037
2011 EQT PROD CO Fracing Fluid Waste (in Barrels) 7,800.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 EQT PROD CO Produced Fluid (in Barrels) 1,046.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-167-28466
2011 EQT PROD CO Produced Fluid (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 EQT PROD CO Drilling Fluid Waste (in Barrels) 238.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2011 EQT PROD CO Drilling Fluid Waste (in Barrels) 113.00 Bbl INJECTION DISPOSAL WELL 34-059-24067
2011 EQT PROD CO Produced Fluid (in Barrels) 486.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2011 EQT PROD CO Produced Fluid (in Barrels) 100.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2011 EQT PROD CO Produced Fluid (in Barrels) 341.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE
2011 EQT PROD CO Produced Fluid (in Barrels) 112.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-059-24067
2011 EQT PROD CO Drilling Fluid Waste (in Barrels) 303.00 Bbl INJECTION DISPOSAL WELL 34-009-21899
2011 EQT PROD CO Fracing Fluid Waste (in Barrels) 17,976.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid (in Barrels) 114.00 Bbl INJECTION DISPOSAL WELL 2D0855151
2012 EQT PROD CO Produced Fluid (in Barrels) 114.00 Bbl INJECTION DISPOSAL WELL 34-167-28462
2012 EQT PROD CO Produced Fluid (in Barrels) 542.00 Bbl INJECTION DISPOSAL WELL 34-083-24137
2012 EQT PROD CO Fracing Fluid Waste (in Barrels) 1,900.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid (in Barrels) 172.00 Bbl INJECTION DISPOSAL WELL 34-117-23388
2012 EQT PROD CO Produced Fluid (in Barrels) 2,024.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012 EQT PROD CO Produced Fluid (in Barrels) 332.00 Bbl INJECTION DISPOSAL WELL 34-167-28466
2013 EQT PROD CO Drilling Fluid Waste (in Barrels) 1,300.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EQT PROD CO Produced Fluid (in Barrels) 9,985.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 EQT PROD CO Fracturing Fluid Waste (in Tons) 22.00 Tons LANDFILL SWF 1032-WV0109
2014 EQT PROD CO Produced Fluid (in Barrels) 4,027.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Fracing Fluid Waste (in Barrels) 217.00 Bbl REUSE OTHER THAN ROAD SPREADING
2015 EQT PROD CO Produced Fluid (in Barrels) 4,277.00 Bbl REUSE OTHER THAN ROAD SPREADING
2016 EQT PROD CO Produced Fluid (in Barrels) RWC 802 1,441.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EQT PROD CO Produced Fluid (in Barrels) RWC 802 12.47 Bbl INJECTION DISPOSAL WELL 34-157-25511
2017 EQT PROD CO Other Oil & Gas Wastes (in Barrels) RWC 899 10.00 Bbl REUSE (AT WELL PAD)
2017 EQT PROD CO Produced Fluid (in Barrels) RWC 802 911.58 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid (in Barrels) RWC 802 2.75 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2018 EQT PROD CO Produced Fluid (in Barrels) RWC 802 150.27 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Other Oil & Gas Wastes (in Barrels) RWC 899 47.13 Bbl REUSE (AT WELL PAD)
2018 EQT PROD CO Produced Fluid (in Barrels) RWC 802 37.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid (in Barrels) RWC 802 15.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019 EQT PROD CO Produced Fluid (in Barrels) RWC 802 53.54 Bbl REUSE (AT WELL PAD)
2019 EQT PROD CO Produced Fluid (in Barrels) RWC 802 15.69 Bbl INJECTION DISPOSAL WELL 34-009-23823
2019 EQT PROD CO Other Oil & Gas Wastes (in Barrels) RWC 899 37.14 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1840882 Primary Facility 2009-10-29 Routine/Complete Inspection No Violations Noted
1850970 Primary Facility 2009-11-24 Routine/Complete Inspection No Violations Noted
1866811 Primary Facility 2010-02-24 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
1877854 Primary Facility 2010-04-06 Follow-up Inspection No Violations Noted HORIZONTAL MARCELLUS
1878379 Primary Facility 2010-01-29 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2083845 Primary Facility 2012-07-12 Complaint Inspection No Violations Noted
2120292 Primary Facility 2012-11-06 Routine/Complete Inspection No Violations Noted Sampled Hildebrand's Spring. Soil Pile from sediment trap still covered and on site. Impoundment still on site with liner that appeared to have been patched.
2123055 Primary Facility 2012-06-18 Complaint Inspection No Violations Noted Water Well Complaint - No Land Owners at residence. Water well is connected to water to fresh water tank and could not sanmple
2152268 Primary Facility 2013-03-14 Complaint Inspection No Violations Noted The Department was at the above referenced Marcellus Wells to conduct a follow-up Complaint Inspection. The Department sampled the spring in the cattle field next to the access road. The sample results have not all been reported at this point. Sample results will be provided to all parties involved. The soil pile from the sediment trap is still on site and covered with plastic.
2595653 Primary Facility 2017-04-05 Follow-up Inspection No Violations Noted On 04/05/17 at approximately 1200 hours I along with WQSS John Carson and Environmental Engineer Donna Davis conducted a follow up inspection of the Hildebrand site in response to an NOV issued on 03/07/17.

The leak around the riser structure in the rain garden had been repaired. The rain garden appears to contain sediment from poorly stabilized adjacent slopes. The slopes appeared to be failing, depositing sediment into the rain garden and causing a loss of volume. Additionally, erosion was occurring along the southwestern rip rap channel into the rain garden. It is recommended that this be repaired to prevent further erosion and volume loss. It is requested that EQT contact Donna Davis to discuss maintenance of the BMP. It is requested that EQT contact Donna Davis regarding the cross drain causing erosion into the pond on UNT to Castile Run.

The silt socks that were previously undercut or overtopped had been maintained to prevent undercutting, but sediment was still close to or at the top of the silt soc

2613960 Primary Facility 2017-06-27 Follow-up Inspection No Violations Noted A follow up inspection was conducted, since previously cited violations are still outstanding. An excavator was present on the site making repairs to the rain garden. The erosion that had occurred in the area of the removed sediment trap appeared to have been repaired, but erosion was still occurring in the area. Silt socks had been reconfigured to prevent further erosion. Portions of the area upslope of the removed sediment trap had increased vegetative cover since the last NOV was issued. The access road appeared to be washing out on the bend in the access road. The slide in the well pad slope was still present. Additional repairs on the site appeared to be occurring at the time of inspection.
2638128 Primary Facility 2017-09-20 Site Restoration No Violations Noted A site inspection was conducted in response to EQT requesting a meeting to discuss site vegetation and silt sock removal. The Act 9 sign was in place and all required documents were present at the site. The site overall was well vegetated. The erosion channel from near the access road to the location of the removed sediment trap was vegetated. It is recommended that the erosion channel be repaired to original grade, seeded, and mulched. The rain garden appeared to be in good condition. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection.
2692678 Primary Facility 2018-01-29 Site Restoration No Violations Noted The Act 9 sign was in place and all required documents were present at the site. The site entrance exhibited signs of access road erosion (see photographs). It appeared water was overflowing the culvert and removing material from the access road near the Act 9 sign.

The site did not exhibit uniform 70% vegetative cover. Areas of poor or no vegetative cover were observed. Erosion was occurring along the access road below the check dams in the location of the removed sediment trap (see photographs).

The site does not meet the requirements for permit termination. The NOT is denied.

2760132 Primary Facility 2018-07-19 Site Restoration No Violations Noted A site restoration inspection was conducted in response to an NOT submittal from EQT Production Co. The Act 9 sign was in place and all required documents were present.

Erosion of the access road was observed at the site entrance. Metal grates were in place over a large channel in the access road (see photographs). The channel continued off the site parallel to Bowser Road heading South. Erosion of the access road along the right side was also observed (see photographs). Erosion was observed adjacent to the left side of the access road below a neighboring pond, exposing a black pipe.

Poorly vegetated soil and accelerated erosion were observed where silt sock was removed in the area of the restored sediment trap. Multiple small erosion rills were observed in the vegetated area upslope. It appeared the rills existed and were not repaired prior to the vegetation grew and covered the rills. It is recommended the accelerated erosion is repaired.

The site does not meet the requirements for permit terminatio

2798836 Primary Facility 2018-11-06 Routine/Complete Inspection No Violations Noted
2809657 Primary Facility 2018-11-14 Site Restoration No Violations Noted A meeting was requested by EQT to evaluate the site for NOT criteria. The Act 9 sign was in place and all required documents were present at the site. PCSM was installed and appeared to be functioning. Site vegetation met the requirement of 70% uniform vegetative cover. The site meets the requirements for permit termination. The NOT is approved.
2849624 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted On 02/25/19 at approximately 1220 hours I conducted an inspection of the site. It appeared recent heavy rains had caused the pit collecting water for the culvert to overflow at the site entrance, causing wash out of the access road. Ice was present on Bowser road and appeared to have been caused by water leaving the well site.

Water from the adjacent private pond was eroding through the pond bank along the pipe leading to the culvert inlet. The inlet from the pond was clogged with debris, causing water to divert around the pipe and erode alongside it.

The culvert appeared to be functioning at the time of inspection.

For data sources see[6]

References