If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Noble_County,_Ohio|Noble]] | | County: [[Noble_County,_Ohio|Noble]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Seneca Township,_Noble_County,_Ohio|Seneca Township]] |
|- | |- | ||
| Operator Name: [[ANTERO RESOURCES CORPORATION]] | | Operator Name: [[ANTERO RESOURCES CORPORATION]] |
Well ID: 34-121-24423 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.882468085,"lon":-81.42294664,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Noble | |
Municipality: Seneca Township | |
Operator Name: ANTERO RESOURCES CORPORATION | |
Well Pad ID: US-OH-000730 | |
Farm/Lease Name: VORHIES UNIT | |
License Status: Producing | |
License Date: 2013-05-23 | |
Spud Date: 2013-09-23 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-02-03 | |
Well Total Depth: 18481 ft | |
Configuration: Horizontal | |
Latitude: 39.882468085 | |
Longitude: -81.42294664 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2013-05-23 | Proposed Formations:POINT PLEASANT, Issued Date:5/23/2013, Expired Date:5/23/2015 12:00:00 PM, Drilling unit acres:732.3, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-02-03 | |
Correction to Well | 2014-03-07 | CORRECTION TO PROPOSED TOTAL DEPTH, TARGET AND TAKE-POINT INFORMATION (FOOTAGE AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Completion Report Received | 2015-02-12 | |
Construction Permit Expires | 2015-05-23 | |
Record Last Modified | 2017-10-23 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-02-13 | 8092 | 17898 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 04/13/2014 | 05/30/2014 | 7560 | 14,596,900.0 | 675302 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | AI-300 | U.S. Well Services, LLC | Acid Corrosion Inhibitor | Isopropyl Alcohol | 67-63-0 | 3 | 0.00001000 | 18.9662 |
Ethylene Glycol | 107-21-1 | 31 | 0.0004 | 548.605 | ||||
Triethyl Phosphate | 78-40-0 | 3 | 0.00002000 | 23.8816 | ||||
2-Butoxyethanol | 111-76-2 | 7 | 0.0001 | 129.622 | ||||
N,N-Dimethylformamide | 68-12-2 | 15 | 0.00013 | 169.569 | ||||
Water | 7732-18-5 | 20 | 0.00004000 | 50.3528 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 5 | 0.00003000 | 39.8027 | ||||
Cinnamaldehyde | 104-55-2 | 5 | 0.00011 | 148.756 | ||||
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 13 | 0.00011 | 146.742 | ||||
Sand | U.S. Well Services, LLC | Proppant | Crystalline Silica, quartz | 14808-60-7 | 100 | 9.83016 | 13,326,800.0 | |
SI-1000 | U.S. Well Services, LLC | Scale Inhibitor | Water | 7732-18-5 | 30 | 0.00341 | 4616.68 | |
Ethylene Glycol | 107-21-1 | 20 | 0.00408 | 5536.14 | ||||
Anionic Copolymer | Proprietary | 0 | 0.00452 | 6124.6 | ||||
Water | Antero Resources | Base Fluid | Water | 7732-18-5 | 100 | 89.7975 | 121,738,000.0 | |
HCL Acid (12.6%-18.0%) | U.S. Well Services, LLC | Bulk Acid | Hydrogen Chloride | 7641-01-1 | 18 | 0.03693 | 50065 | |
Water | 7732-18-5 | 87.5 | 0.1546 | 209593 | ||||
WFRA-405 | U.S. Well Services, LLC | Friction Reducer | Crystalline Salt | 12125-02-9 | 5 | 0.00338 | 4577.83 | |
Ethoxylated alcohol blend | Proprietary | 5 | 0.00338 | 4577.83 | ||||
Petroleum Distillates | 64742-47-8 | 22 | 0.02175 | 29481.2 | ||||
Anionic Polyacrylamide | Proprietary | 0 | 0.02701 | 36622.6 | ||||
Water | 7732-18-5 | 40 | 0.02701 | 36622.6 | ||||
LGC-15 | U.S. Well Services, LLC | Gelling Agents | Petroleum Distillates | 64742-47-8 | 60 | 0.03302 | 44761.6 | |
Surfactant | 68439-51-0 | 3 | 0.00209 | 2835.83 | ||||
Guar Gum | 9000-30-0 | 50 | 0.03486 | 47263.8 | ||||
Suspending agent (solid) | 14808-60-7 | 3 | 0.00533 | 7228.58 | ||||
K-BAC 1020 | U.S. Well Services, LLC | Anti-Bacterial Agent | 2,2-dibromo-3-nitrilopropionamide | 10222-01-2 | 20 | 0.00554 | 7510.15 | |
Deionized Water | 7732-18-5 | 28 | 0.00316 | 4289.76 | ||||
AP One | U.S. Well Services, LLC | Gel Breakers | Ammonium Persulfate | 7727-54-0 | 100 | 0.00136 | 1840 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-05-30 | H2O | 15 | 5908 Bbl | 247440 | US Well Services Inc | STAGE 56/56
60 SHOTS |
2014-04-13 | H2O | 15 | 7347 Bbl | 233900 | US Well Services Inc | STAGE 1/56
60 SHOTS STAGES 2-55 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | 824488 | 52632 | 164 |
2015 | ANTERO RESOURCES CORPORATION | 1020839 | 40432 | 365 |
2016 | ANTERO RESOURCES CORPORATION | 539868 | 14679 | 359 |
2017 | ANTERO RESOURCES CORPORATION | 390086 | 9136 | 365 |
2018 | ANTERO RESOURCES CORPORATION | 271215 | 5380 | 358 |
2019 | ANTERO RESOURCES CORPORATION | 60169 | 786 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2014 | ANTERO RESOURCES CORPORATION | Brine | 9234 | 164 |
2015 | ANTERO RESOURCES CORPORATION | Brine | 6728 | 365 |
2016 | ANTERO RESOURCES CORPORATION | Brine | 2595 | 359 |
2017 | ANTERO RESOURCES CORPORATION | Brine | 1838 | 365 |
2018 | ANTERO RESOURCES CORPORATION | Brine | 2140 | 358 |
2019 | ANTERO RESOURCES CORPORATION | Brine | 251 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0192634511 | 2014-01-27 | Drill / Deepen / Reopen | No Violations | My inspection today finds the rig is drilling 8.5 hole at a depth of 17287. |
0506968124 | 2018-11-26 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with 5.5-inch diameter production casing and 2.875-inch diameter tubing equipped with a plunger lift system. At the time of my inspection annular pressure monitoring was in place, and the 13.375-inch diameter casing had 0 pounds per square inch, the 9.625-inch diameter casing had 0 pounds per square inch. Production equipment included a Gas Processing Unit, as well as 8- 400-barrel steel production fluid tanks, and 2 combustors that were shared with the other producing wells on the pad. There was secondary containment around the production fluid tanks, and the Gas Processing Units. The well pad was contained within an earthen dike, there were multiple Emergency Shutoff Devices on location. There was a midstream valve site near located to the south of the pad. Identification tags were present, and production was up to date. |
0685864706 | 2016-05-18 | Production Wells | No Violations | My inspection today finds the well is equipped in a manner consistent with being capable of production. The production valves are open. The tank battery consists of eight 400 barrel tanks set in a plastic lined steel containment system. Antero personnel Zac Cornish and Josh Horn are on location. I am accompanied by a number of division staff. |
1012498975 | 2013-09-30 | Drill / Deepen / Reopen | No Violations | My inspection today finds the rig is drilling 17.5 hole at 1503. |
1157932356 | 2014-11-05 | Preliminary Restoration | No Violations | My inspection today finds the well is equipped with tubing and is produced by open flow through a choke. The tank battery is comprised of eight 400 barrel tanks located in a steel framed and plastic lined containment. The well site meets preliminary restoration requirements. |
1380040473 | 2013-09-24 | Production Wells | No Violations | My inspection today finds Express Drilling drilled a 32 inch hole to a depth of 111. 26 casing was ran to 109. Allied cemented the casing in place with 336 sks of class A cement. I witnessed 10 bbl of cement returns to surface. Twenty bbl of cement is still in the casing due to the job being stopped because of rising pressures. |
1473677442 | 2013-09-27 | Casing String Witnessed | No Violations | My inspection today finds the rig crew ran 335 of casing. Allied cemented the casing in place with class A cement. I witnessed 80 bbl cement returns to surface. |
1489154345 | 2017-03-10 | Production Wells | No Violations | The purpose of my inspection was a status check. During my inspection the well was equipped with a production tree style wellhead with valves in the open position. The production equipment consisted of three gas production units, eight 400 barrel tanks, two compressors, and two combustors. Identification was present and production records were current. |
1514416990 | 2017-12-27 | Production Wells | No Violations | The purpose of my inspection was a status check on a production well. The well was equipped with a production tree style wellhead with a plunger lift system. Production valves were in the open position. Pressure monitoring was present. The production equipment consisted of eight 400 barrel tanks within steel line containment, three gas production units, one vapor recovery tower, two compressors, one vent scrubber, and two combustors. The identification was located at the wellhead. |
1712140707 | 2013-10-03 | Drill / Deepen / Reopen | No Violations | My inspection today finds the 13.625 casing is parted at 286. The drilling superintendent is attempting to locate a casing patch. Once the patch is in place they will grout the backside of the casing. |
For data sources see[10]