X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-089-26179"

m
m
Line 11: Line 11:
 
| County: [[Licking_County,_Ohio|Licking]]
 
| County: [[Licking_County,_Ohio|Licking]]
 
|-
 
|-
| Municipality: [[Licking_Township,_Licking_County,_Ohio|Licking Township]]
+
| Municipality: [[Licking Township,_Licking_County,_Ohio|Licking Township]]
 
|-
 
|-
 
| Operator Name: [[ARTEX OIL COMPANY]]
 
| Operator Name: [[ARTEX OIL COMPANY]]

Revision as of 01:48, 14 August 2019

Well Details

Well ID: 34-089-26179
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: Licking Township
Operator Name: ARTEX OIL COMPANY
Well Pad ID:
Farm/Lease Name: BARTON-TEAGUE UNIT
License Status: Producing
License Date: 2016-08-08
Spud Date: 2016-08-30
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2016-09-13
Well Total Depth: 4325 ft
Configuration: Vertical
Latitude: 39.968548625
Longitude: -82.47110905

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2016-08-08 Proposed Formations:KNOX, Issued Date:8/8/2016, Expired Date:8/8/2018 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2016-09-13
Completion Report Received 2017-01-30
Record Last Modified 2017-11-16
Construction Permit Expires 2018-08-08

For data sources see[2]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ARTEX OIL COMPANY 0 0 365
2017 ARTEX OIL COMPANY 3722 2689 365
2018 ARTEX OIL COMPANY 12328 1387 365

For data sources see[3] [4]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ARTEX OIL COMPANY Brine 2066 365
2017 ARTEX OIL COMPANY Brine 2875 365
2018 ARTEX OIL COMPANY Brine 1341 365

For data sources see[5] [6]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0282802611 2016-09-06 Casing String Witnessed No Violations I witnessed the cementing of the 8 diameter surface casing on Kilbarger rig #5. Refer to casing ticket report for details. Time of inspection: 1:30 PM.
0438302326 2016-09-07 Drill / Deepen / Reopen No Violations Site visit with Central Office personnel. Kilbarger rig #5 drilling during inspection. Time of inspection: 10:00 AM.
1324598532 2016-08-29 Drill / Deepen / Reopen No Violations Inspect well site. The drilling location has been built. The blow pit was dug and lined. Awaiting for rig to arrive. Artex company man Heath Halstead on location. Time of inspection: 3:00 PM.
1480963279 2016-12-05 Production Wells No Violations Inspect location as a status check. The well was equipped with a pumping unit and motor. It was pumping during inspection. The well was pumping into a 300 barrel frac tank situated inside an earthen dike. A horizontal separator was observed approximately 50 feet from the well. The well location has been graded and seeded. The restoration will be passed when vegetation is established. Time of inspection: 1:40 PM.
1492783226 2017-04-21 Preliminary Restoration No Violations Inspect location as part of a preliminary restoration status check. The well was equipped with a pumping unit and motor. It was pumping during inspection. The tank battery consists of (2) 210 barrel tanks inside an earthen dike and a horizontal separator outside of the dike. A 300 barrel frac tank was observed inside an earthen dike. Drilling equipment has been removed and pits are closed. The well location has been restored and vegetation established. The pumper arrived during the inspection. I advised him that identification needs to be posted. Inspection meets ORC 1509.072 requirements. Time of inspection: 9:30 AM. Weather: 54*F, Partly cloudy
1839945740 2016-10-14 Production Wells No Violations Inspect location. The well has been completed. The well was equipped with a rabbit wellhead and was shut-in. A 2 inch diameter flow line was hooked up at the well and was connected to a frac tank near the well. The air pit has been closed. The mud pit was still open. No violations. Time of inspection: 3:45 PM.

For data sources see[7]

References