X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22793"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
+
| Municipality: [[Akron City,_Summit_County,_Ohio|Akron City]]
 
|-
 
|-
 
| Operator Name: [[CARGILL INC]]
 
| Operator Name: [[CARGILL INC]]

Revision as of 06:12, 14 August 2019

Well Details

Well ID: 34-153-22793
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Akron City
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON SMP #33
License Status: Active Injection
License Date: 1994-08-24
Spud Date: 1994-11-05
Spud Drilling Contractor: IPSCO
Final Drill Date: 1994-11-17
Well Total Depth: 3128 ft
Configuration: Vertical
Latitude: 41.020859920
Longitude: -81.56100010

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1994-08-24 1053 AKZO NOBEL SALT INC GeoDate 8/24/94
Solution Mining 1994-08-24 Issued Date 8/24/94 Expired Date 8/24/95 Acres 0120000 Tool Type RTF Proposed Formation SALINA Proposed Depth 03128 Proposed Drill Depth 03128
Original Spud 1994-11-04 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Completed 1994-11-17 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Reached Total Depth 1994-11-17 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Completion Report Received 1994-12-30 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Construction Permit Expires 1995-08-24 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Last Compliance Report 2014-12-05 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41
Record Last Modified 2017-10-19 CORR FTG/XY 12-14-96, DF-973.4, KB-974.41

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-09-02 3060 3120 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 NONE

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0015333265 2009-12-10 Solution Mining Project No Violations This inspection was for the five year Water-Brine Interface mechanical integrity test on the 9-5/8 production casing. The reference well for this test was the production tubing in this well. The initial pressure difference between the casing and the tubing was 424.121 psi. The final pressure difference was 424.039 psi, a change of 0.082 psi over eight readings for an average of 0.01 psi/hour. The allowable average is 0.05 psi/hour. The well PASSED the test.
0276770450 2017-12-01 Solution Mining Project No Violations I was on location to inspect the injection well. A locked chain link fence with barb wire surrounds the well. I observed no leaks or spills. An identification sign is posted. The access road gate was locked with an identification sign. There are no issues at this time.
0316077240 2009-06-18 Solution Mining Project No Violations Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
0566349061 2018-01-31 Solution Mining Project No Violations I was on location to inspect the UIC well. I found no spill or leaks. There is a locked chain link fence around the well. An identification sign is posted on the fence. There are no violations at this time.
0755335926 2004-10-26 Solution Mining Project No Violations Status check inspection - no violations at this time.
1104240210 2004-12-07 Solution Mining Project No Violations The 5 year MIT results are below. The reference point was tubing in the well.
    Time                  Test Pressure             Reference Pressure             Difference
    08:00                     541.300                               125.888                          415.412
    09:00                     538.863                               123.496                          415.367
    10:00                     537.633                               122.288                          415.345
    11:00                     536.406                               121.104                          415.302
    12:00                     535.054                               119.797                          415.257
    13:00                     534.143                               118.924                          415.219
    14:00                     533.267                               118.122                          415.145
    15:00                     532.640                               117.523                          415.117
    16:00                     532.065                               116.995                          415.070

The net pressure change was 0.342 psi over 8 hours for an average of 0.043 psi/hour.

1281474864 2010-08-03 Solution Mining Project No Violations Annual inspection of this solution mining well found no violations at this time. Preliminary restoration also approved.
1373215331 2013-06-24 Solution Mining Project No Violations The well was properly identified. My inspection was accompanied by Andrew Adgate.
1476708300 2016-08-16 Solution Mining Project No Violations There were no violations at the time of inspection.
1863107560 2014-12-05 Solution Mining Project No Violations A water-brine interface mechanical integrity test was performed on the well. Calculations indicated a net pressure change of less than 0.05 psi./hour, between the well and the reference. The well passed the test.
2111959003 2003-09-08 Solution Mining Project No Violations Status check inspection - no violations at this time.

For data sources see[5]

References