X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-153-22794"

m
m
Line 11: Line 11:
 
| County: [[Summit_County,_Ohio|Summit]]
 
| County: [[Summit_County,_Ohio|Summit]]
 
|-
 
|-
| Municipality: [[Coventry_Township,_Summit_County,_Ohio|Coventry Township]]
+
| Municipality: [[Akron City,_Summit_County,_Ohio|Akron City]]
 
|-
 
|-
 
| Operator Name: [[CARGILL INC]]
 
| Operator Name: [[CARGILL INC]]

Revision as of 06:12, 14 August 2019

Well Details

Well ID: 34-153-22794
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Akron City
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON
License Status: Active Injection
License Date: 1994-08-24
Spud Date: 1994-11-19
Spud Drilling Contractor: IPSCO
Final Drill Date: 1995-01-31
Well Total Depth: 4450 ft
Configuration: Horizontal
Latitude: 41.019942019
Longitude: -81.56626819

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1994-08-24 1053 AKZO NOBEL SALT INC GeoDate 8/24/94
Solution Mining 1994-08-24 Issued Date 8/24/94 Expired Date 8/24/95 Acres 0120000 Tool Type RTF Proposed Formation SALINA Proposed Depth 03360 Proposed Drill Depth 03360
Original Spud 1994-11-19 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Plugged Back 1994-12-22 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Annulus Pressure Monitoring Approved 1995-01-13 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Completed 1995-01-31 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Reached Total Depth 1995-01-31 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Completion Report Received 1995-02-23 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Construction Permit Expires 1995-08-24 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Record Last Modified 2017-10-19 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3
Last Compliance Report 2019-12-05 CORR FTG/Y COORD 12-14-96, DF=973.3, KB=974.3

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1999-09-02 3120 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 0 NONE

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0126146176 2003-09-08 Solution Mining Project No Violations Status check inspection - no violations at this time.
0698038514 2016-08-16 Solution Mining Project No Violations There were no violations at the time of inspection.
0751618686 2009-12-11 Solution Mining Project No Violations This inspection was for the five year Water-Brine Interface mechanical integrity test on the 9-5/8 production casing. The reference well for this test was the production tubing in this well. On 12/10, a MIT was attempted on this well. However, on the next to last reading, the meter on the reference well started to fail. Even though the pressure differentials up to that point indicated that the well was passing the test, the decision was made to replace the meters and start the test over on 12/11. On 12/11 the initial pressure difference between the casing and the tubing was 468.063 psi. The final pressure difference was 468.180 psi, a change of 0.117 psi over eight hours for an average of 0.015 psi/hour. The allowable average is 0.05 psi/hour. The well PASSED the test.
1069717039 2009-06-18 Solution Mining Project No Violations Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
1467366250 2004-12-22 Solution Mining Project No Violations Successfully completed the 5 year MIT.

Time Test Well Pressure Reference Well Pressure Difference 08:00 585.726 130.511 455.215 09:00 585.776 130.579 455.197 10:00 585.803 130.609 455.194 11:00 585.819 130.628 455.191 12:00 585.821 130.635 455.186 13:00 585.840 130.652 455.188 14:00 585.851 130.669 455.182 15:00 585.860 130.682 455.178 16:00 585.860 130.689 455.171 The net pressure change was 0.044 psi over 8 hours for an average of 0.0055 psi/hour

1531157447 2018-07-09 Solution Mining Project No Violations I found the wellhead secure with a locked chain link fence. There is an identification sign posted. I observed no leaks or spills.
1665133199 2010-08-03 Solution Mining Project No Violations Annual inspection of this solution mining well found no violations at this time. Preliminary restoration also approved.
1866522569 2014-12-05 Solution Mining Project No Violations A water-brine interface mechanical integrity test was performed on the well. Calculations indicated a net pressure change of less than 0.05 psi./hour, between the well and the reference. The well passed the test.
2028917371 2004-10-26 Solution Mining Project No Violations Status check inspection - no violations at this time.

For data sources see[5]

References