If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 113: | Line 113: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 118: | Line 119: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Produced Fluid (in Barrels) RWC 802 |
− | | | + | | style="text-align: right;" | 18.33 Bbl |
− | | | + | | RESIDUAL WASTE PROCESSING FACILITY |
+ | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 100.40 Tons |
| LANDFILL | | LANDFILL | ||
| 100663 | | 100663 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 76.67 Bbl |
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Other Oil & Gas Wastes (in Barrels) RWC 899 | | Other Oil & Gas Wastes (in Barrels) RWC 899 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 75.00 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Tons) RWC 899 |
− | | | + | | style="text-align: right;" | 1.01 Tons |
− | | | + | | LANDFILL |
+ | | 100277 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 82.23 Tons |
| LANDFILL | | LANDFILL | ||
| 100172 | | 100172 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
| style="text-align: right;" | 182.80 Bbl | | style="text-align: right;" | 182.80 Bbl | ||
Line 166: | Line 168: | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
− | + | | [[RICE DRILLING B LLC]] | |
− | | | + | | Synthetic Liner Materials (in Tons) RWC 806 |
− | + | | style="text-align: right;" | 0.93 Tons | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align: right;" | | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 18.33 Bbl | | style="text-align: right;" | 18.33 Bbl | ||
Line 190: | Line 182: | ||
| WMGR123NW009 | | WMGR123NW009 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[RICE DRILLING B LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 17.43 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW019 |
|- | |- | ||
− | | | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Drilling Fluid Waste (in Barrels) RWC 803 |
− | | | + | | style="text-align: right;" | 650.00 Bbl |
− | | | + | | REUSE (AT WELL PAD) |
+ | | | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 596.65 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100419 |
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Synthetic Liner Materials (in Tons) RWC 806 |
+ | | style="text-align: right;" | 5.72 Tons | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100172 |
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Barrels) RWC 899 |
+ | | style="text-align: right;" | 53.33 Bbl | ||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | + | | [[RICE DRILLING B LLC]] | |
− | | | + | | Drill Cuttings (in Tons) RWC 810 |
− | + | | style="text-align: right;" | 540.95 Tons | |
− | |||
− | |||
− | |||
− | | | ||
− | | style="text-align: right;" | | ||
| LANDFILL | | LANDFILL | ||
| 100172 | | 100172 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Tons) RWC 899 |
+ | | style="text-align: right;" | 20.72 Tons | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100172 |
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 299.78 Tons |
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Other Oil & Gas Wastes (in Tons) RWC 899 |
+ | | style="text-align: right;" | 3.52 Tons | ||
| LANDFILL | | LANDFILL | ||
| 100419 | | 100419 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
| style="text-align: right;" | 260.00 Bbl | | style="text-align: right;" | 260.00 Bbl | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Synthetic Liner Materials (in Tons) RWC 806 |
+ | | style="text-align: right;" | 25.75 Tons | ||
| LANDFILL | | LANDFILL | ||
− | | | + | | 100663 |
+ | |- | ||
+ | | 2019 | ||
+ | | [[RICE DRILLING B LLC]] | ||
+ | | Other Oil & Gas Wastes (in Barrels) RWC 899 | ||
+ | | style="text-align: right;" | 130.00 Bbl | ||
+ | | REUSE (AT WELL PAD) | ||
+ | | | ||
|- | |- | ||
− | | | + | | 2019 |
− | | | + | | [[RICE DRILLING B LLC]] |
− | | style="text-align: right;" | | + | | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 |
− | | | + | | style="text-align: right;" | 0.13 Tons |
− | | | + | | REUSE (AT WELL PAD) |
+ | | | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drill Cuttings (in Tons) RWC 810 | | Drill Cuttings (in Tons) RWC 810 | ||
| style="text-align: right;" | 84.85 Tons | | style="text-align: right;" | 84.85 Tons | ||
Line 280: | Line 280: | ||
| 100419 | | 100419 | ||
|- | |- | ||
− | | 2019 | + | | 2019 |
+ | | [[RICE DRILLING B LLC]] | ||
| Drilling Fluid Waste (in Barrels) RWC 803 | | Drilling Fluid Waste (in Barrels) RWC 803 | ||
| style="text-align: right;" | 110.00 Bbl | | style="text-align: right;" | 110.00 Bbl | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| REUSE (AT WELL PAD) | | REUSE (AT WELL PAD) | ||
| | | |
Well ID: 37-059-27343 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.792283,"lon":-80.502889,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Aleppo Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 152573 | |
Farm/Lease Name: PISTON HONDA 8 | |
License Status: Active | |
Spud Date: 2017-09-19 | |
Permit Date: 2017-08-28 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.792283 | |
Longitude: -80.502889 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 100.40 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 76.67 Bbl | REUSE (AT WELL PAD) | |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 75.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Tons) RWC 899 | 1.01 Tons | LANDFILL | 100277 |
2017 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 82.23 Tons | LANDFILL | 100172 |
2017 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 182.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | RICE DRILLING B LLC | Synthetic Liner Materials (in Tons) RWC 806 | 0.93 Tons | LANDFILL | 100663 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 18.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017 | RICE DRILLING B LLC | Produced Fluid (in Barrels) RWC 802 | 17.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 650.00 Bbl | REUSE (AT WELL PAD) | |
2018 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 596.65 Tons | LANDFILL | 100419 |
2018 | RICE DRILLING B LLC | Synthetic Liner Materials (in Tons) RWC 806 | 5.72 Tons | LANDFILL | 100172 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 53.33 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 540.95 Tons | LANDFILL | 100172 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Tons) RWC 899 | 20.72 Tons | LANDFILL | 100172 |
2018 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 299.78 Tons | LANDFILL | 100663 |
2018 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Tons) RWC 899 | 3.52 Tons | LANDFILL | 100419 |
2018 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 260.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | RICE DRILLING B LLC | Synthetic Liner Materials (in Tons) RWC 806 | 25.75 Tons | LANDFILL | 100663 |
2019 | RICE DRILLING B LLC | Other Oil & Gas Wastes (in Barrels) RWC 899 | 130.00 Bbl | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.13 Tons | REUSE (AT WELL PAD) | |
2019 | RICE DRILLING B LLC | Drill Cuttings (in Tons) RWC 810 | 84.85 Tons | LANDFILL | 100419 |
2019 | RICE DRILLING B LLC | Drilling Fluid Waste (in Barrels) RWC 803 | 110.00 Bbl | REUSE (AT WELL PAD) |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2639910 | Primary Facility | 2017-09-20 | Drilling/Alteration | No Violations Noted | The well has been spud. The well was spud on 9/19/17. The operator drilled a 36 inch hole to 50 feet and set and cemented a 50 foot x 26 inch conductor pipe in place. A cylindrical well cellar has been installed around conductor pipe. |
2640706 | Primary Facility | 2017-09-20 | Routine/Complete Inspection | No Violations Noted | On September 20, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. Present at time of inspection was Joel Keller (DEP) and Jamie Davis (Rice). The site is located in Aleppo Twp., Greene Co. The inspection was related to setting of conductor on the wells to be drilled on site.
The operator is constructing the PCSM structures on the site and stabilizing the site. The operator has begun to set conductors on the 6 permitted wells on the site. |
2664937 | Primary Facility | 2017-11-08 | Routine/Complete Inspection | No Violations Noted | On November 8, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection during drilling operations on site.
The operator has completed construction of the PCSM structures on the site and is stabilizing the site. A slide has developed in the PCSM structure at the well pad which extends to the base of the well pad fill slope. The operator will need to stabilize the slope and repair the PCSM structure. The operator has set conductors on 6 wells on the site and has begun drilling the vertical sections on these 6 wells. |
2682727 | Primary Facility | 2018-01-05 | Drilling/Alteration | No Violations Noted | Operator reports 2832' of 9 5/8" csg set with 29 bbls of cmt returned to surface. NOVIO |
2830079 | Primary Facility | 2019-01-18 | Drilling/Alteration | No Violations Noted | The well has been drilled and cased to total depth. The operator set and cemented 5 1/2" production casing at 19,258' TMD / 7,406' TVD. Est TOC 5,000'. The operator is currently on site drilling well 059-27342. |
For data sources see[6]