If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Ellsworth Township,_Mahoning_County,_Ohio|Ellsworth Township]] |
|- | |- | ||
| Operator Name: [[BOBCAT WELL & PIPELINE LLC]] | | Operator Name: [[BOBCAT WELL & PIPELINE LLC]] |
Well ID: 34-099-22593 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.033315178,"lon":-80.83072538,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Ellsworth Township | |
Operator Name: BOBCAT WELL & PIPELINE LLC | |
Well Pad ID: | |
Farm/Lease Name: MUNHOLAND UNIT | |
License Status: Producing | |
License Date: 1993-11-01 | |
Spud Date: 1993-12-11 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1993-12-16 | |
Well Total Depth: 5298 ft | |
Configuration: Vertical | |
Latitude: 41.033315178 | |
Longitude: -80.83072538 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1993-11-01 | 2651 D & L ENERGY INC GeoDate 11/1/93 |
Oil and Gas | 1993-11-01 | Issued Date 11/1/93 Expired Date 11/1/94 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 05298 Proposed Drill Depth 05298 |
Original Spud | 1993-12-11 | |
Completed | 1993-12-16 | |
Reached Total Depth | 1993-12-16 | |
Completion Report Received | 1994-02-14 | |
Construction Permit Expires | 1994-11-01 | |
Change of Owner | 2015-01-27 | Operator changed from 2651, D & L ENERGY INC to 9426, BOBCATE WELL AND PIPELINE LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 5042 | 5186 | 0 |
2006-09-11 | 5064 | 5184 | 33 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 0 | 186 Mscf | 0 | BREAK 1379, AVG RATE 37 BBL; | ||
H2O | 0 | 120000 Gal | 80000 | |||
ACID | 15 | 500 Gal | 0 | FRAC W/120M GAL H20,80M#SAND & 186 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | 11591 | 269 | 312 |
1995 | D & L ENERGY INC | 14212 | 92 | 365 |
1996 | D & L ENERGY INC | 12240 | 67 | 365 |
1997 | D & L ENERGY INC | 10582 | 52 | 365 |
1998 | D & L ENERGY INC | 9862 | 45 | 365 |
1999 | D & L ENERGY INC | 7954 | 0 | 365 |
2000 | D & L ENERGY INC | 7419 | 64 | 365 |
2001 | D & L ENERGY INC | 7251 | 0 | 365 |
2002 | D & L ENERGY INC | 7039 | 0 | 365 |
2003 | D & L ENERGY INC | 6020 | 0 | 365 |
2004 | D & L ENERGY INC | 7928 | 57 | 365 |
2005 | D & L ENERGY INC | 6531 | 38 | 365 |
2006 | D & L ENERGY INC | 6347 | 0 | 365 |
2007 | D & L ENERGY INC | 5385 | 0 | 365 |
2008 | D & L ENERGY INC | 5420 | 0 | 366 |
2009 | D & L ENERGY INC | 4866 | 0 | 365 |
2010 | D & L ENERGY INC | 6093 | 0 | 365 |
2011 | D & L ENERGY INC | 6633 | 0 | 0 |
2012 | D & L ENERGY INC | 5518 | 54 | 365 |
2013 | D & L ENERGY INC | 3133 | 0 | 194 |
2014 | D & L ENERGY INC | 0 | 0 | 0 |
2015 | BOBCAT WELL & PIPELINE LLC | 0 | 0 | 0 |
2016 | BOBCAT WELL & PIPELINE LLC | 0 | 0 | 0 |
2017 | BOBCAT WELL & PIPELINE LLC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1994 | D & L ENERGY INC | Brine | 189 | 312 |
1995 | D & L ENERGY INC | Brine | 55 | 365 |
1996 | D & L ENERGY INC | Brine | 0 | 365 |
1997 | D & L ENERGY INC | Brine | 0 | 365 |
1998 | D & L ENERGY INC | Brine | 0 | 365 |
1999 | D & L ENERGY INC | Brine | 0 | 365 |
2000 | D & L ENERGY INC | Brine | 45 | 365 |
2001 | D & L ENERGY INC | Brine | 0 | 365 |
2002 | D & L ENERGY INC | Brine | 0 | 365 |
2003 | D & L ENERGY INC | Brine | 0 | 365 |
2004 | D & L ENERGY INC | Brine | 73 | 365 |
2005 | D & L ENERGY INC | Brine | 8 | 365 |
2006 | D & L ENERGY INC | Brine | 0 | 365 |
2007 | D & L ENERGY INC | Brine | 0 | 365 |
2008 | D & L ENERGY INC | Brine | 0 | 366 |
2009 | D & L ENERGY INC | Brine | 32 | 365 |
2010 | D & L ENERGY INC | Brine | 18 | 365 |
2011 | D & L ENERGY INC | Brine | 0 | |
2012 | D & L ENERGY INC | Brine | 8 | 365 |
2013 | D & L ENERGY INC | Brine | 0 | 194 |
2014 | D & L ENERGY INC | Brine | 0 | 0 |
2015 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | |
2016 | BOBCAT WELL & PIPELINE LLC | Brine | 0 | 0 |
2017 | BOBCAT WELL & PIPELINE LLC | Brine | 11 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0092777647 | 2002-09-13 | Preliminary Restoration | No Violations | Meets requirements. |
1300216941 | 2011-03-15 | Production Wells | No Violations | Conducted random field inspection. Within compliance at this time. |
1530098367 | 2018-06-19 | Production Wells | No Violations | The purpose of my inspection was to conduct a status check on well #2-2593. RBDMS indicated the last reported production was in 2013. Access to the well and tank battery remained drivable and stable. The 8.625 well head was above grade and open to atmosphere. The 4.5 production casing was equipped with a plunger lift assembly. Production valves were in the closed position. No leaks were observed. An earthen dike that was worn on the East side was present around the production equipment. Equipment on location consisted of one (1) horizontal separator and two (2) 100 bbl production tanks. The separator remained in good repair. The production chart was expired. The tanks remained in good repair. Correct identification was present. Valves were closed and plugged. |
For data sources see[9]