If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Mahoning_County,_Ohio|Mahoning]] | | County: [[Mahoning_County,_Ohio|Mahoning]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Goshen Township,_Mahoning_County,_Ohio|Goshen Township]] |
|- | |- | ||
| Operator Name: [[DORFMAN PRODUCTION COMPANY]] | | Operator Name: [[DORFMAN PRODUCTION COMPANY]] |
Well ID: 34-099-23178 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.940597103,"lon":-80.95304025,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Mahoning | |
Municipality: Goshen Township | |
Operator Name: DORFMAN PRODUCTION COMPANY | |
Well Pad ID: | |
Farm/Lease Name: LONGOCIU | |
License Status: Producing | |
License Date: 2012-05-15 | |
Spud Date: 2012-05-29 | |
Spud Drilling Contractor: ADVENT DRLG | |
Final Drill Date: 2012-06-03 | |
Well Total Depth: 5487 ft | |
Configuration: Vertical | |
Latitude: 40.940597103 | |
Longitude: -80.95304025 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-05-15 | Proposed Formations:CLINTON, Issued Date:5/15/2012, Expired Date:5/15/2014 12:00:00 PM, Drilling unit acres:164.1, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2012-06-03 | |
Completion Report Received | 2012-07-23 | |
Construction Permit Expires | 2014-05-15 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-07-26 | 5324 | 5330 | 7 |
2012-07-26 | 5300 | 5322 | 23 |
2012-07-26 | 5362 | 5377 | 16 |
2012-07-26 | 5351 | 5358 | 8 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-06-14 | H2O | 15 | 198830 Gal | 130000 | Superior Well Services | |
2012-06-14 | H2O | 0 | 198883 Gal | 34368 | Superior Well Services | Slickwater System, No annulus pressure noticed during frac job.No spills or accidents. |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | DORFMAN PRODUCTION COMPANY | 2550 | 1486 | 189 |
2013 | DORFMAN PRODUCTION COMPANY | 1054 | 318 | 365 |
2014 | DORFMAN PRODUCTION COMPANY | 1276 | 288 | 365 |
2015 | DORFMAN PRODUCTION COMPANY | 1254 | 232 | 365 |
2016 | DORFMAN PRODUCTION COMPANY | 1245 | 192 | 365 |
2017 | DORFMAN PRODUCTION COMPANY | 1220 | 210 | 365 |
2018 | DORFMAN PRODUCTION COMPANY | 1308 | 182 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | DORFMAN PRODUCTION COMPANY | Brine | 4715 | 189 |
2013 | DORFMAN PRODUCTION COMPANY | Brine | 210 | 365 |
2014 | DORFMAN PRODUCTION COMPANY | Brine | 193 | 365 |
2015 | DORFMAN PRODUCTION COMPANY | Brine | 140 | 365 |
2016 | DORFMAN PRODUCTION COMPANY | Brine | 135 | 365 |
2017 | DORFMAN PRODUCTION COMPANY | Brine | 142 | 365 |
2018 | DORFMAN PRODUCTION COMPANY | Brine | 100 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0834244036 | 2012-06-14 | Drill / Deepen / Reopen | No Violations | On 614/2012, Superior Well Service moved on location and connected to 4 1/2 casing and started pumping, the fracs average treating pressure was 2445 psi, average 40.7 barrels per minute flow rate, 34368 pounds of sand and 198830 gallons of fresh water, this was a slick water frac. Instance shut in pressure was 998 psi. The job went good no issues at this time. |
1067620809 | 2012-07-06 | Drill / Deepen / Reopen | No Violations | Pits are closed and the location graded but not seeded. This is a multi-well tank battery (Longociu 1 thru 4). The tank battery contains one 210 barrel tank, one 100 barrel brine tank and one horizontal separator (with meter). No violations at this time. |
1118194187 | 2012-05-30 | Drill / Deepen / Reopen | No Violations | On 5/30/2013, the rig set 785 of 8 5/8 20# range 3 casing pipe, broke circulation and cemented with 255 sack of class A cement with 3% CaCl, with good cement returns. Plug down at 8:10 pm. |
1145963666 | 2012-06-14 | Drill / Deepen / Reopen | No Violations | On 6/14/2012, I was on location to witness the frac job by Superior Well Service. There were no significant pressure changes throughout job. No circulation observed from annulus, no leaks or spills. No violations. See stimulation report for details. |
1339503218 | 2012-05-29 | Drill / Deepen / Reopen | No Violations | On 5/29/2013, Advent Drilling moved in and started drilling. I GPS well head location and lease road. I also inspected drill site and the pits and liners, no vialation at this time. |
1346953207 | 2012-09-06 | Preliminary Restoration | No Violations | On 9/06/2012, I performed a status check on the above well site. The tank battery is equipped with one 210 barrel tank and one 100 barrel brine tank and one horizontal separator, there is a pumping unit with an electric motor. Identification signs are posted. No violation were noted at this time. Preliminary Restoration is PASSED. |
1451170320 | 2012-06-03 | Drill / Deepen / Reopen | No Violations | On location 6/3/2012, ran 5485 of 4.5 production casing, cementing with 250 sacks of Class A cement with 2% CaCl. Job completed at 2:10 AM. |
2121399486 | 2012-05-29 | Drill / Deepen / Reopen | No Violations | On 5/20/2012, Advent Drilling moved in and started drilling. I took GPS coordinates of the well head and lease road. I also inspected drill site, the pits and liners. No violations at this time. |
For data sources see[9]