X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-055-21593"

m
m
Line 11: Line 11:
 
| County: [[Geauga_County,_Ohio|Geauga]]
 
| County: [[Geauga_County,_Ohio|Geauga]]
 
|-
 
|-
| Municipality: [[Troy_Township,_Geauga_County,_Ohio|Troy Township]]
+
| Municipality: [[Troy Township,_Geauga_County,_Ohio|Troy Township]]
 
|-
 
|-
 
| Operator Name: [[P & S ENERGY INC]]
 
| Operator Name: [[P & S ENERGY INC]]
Line 33: Line 33:
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 41.361638156
+
| Latitude: <Latitude>
 
|-
 
|-
 
| Longitude: -81.12223327
 
| Longitude: -81.12223327

Revision as of 02:41, 15 August 2019

Well Details

Well ID: 34-055-21593
Loading map...
Country: United States
State: Ohio
County: Geauga
Municipality: Troy Township
Operator Name: P & S ENERGY INC
Well Pad ID:
Farm/Lease Name: BARCIKOSKI UNIT
License Status: Final Restoration
License Date: 1991-07-09
Spud Date: 1989-05-17
Spud Drilling Contractor: [[EPC [EASTERN PETROLEUM]]]
Final Drill Date: 1989-06-01
Well Total Depth: 4285 ft
Configuration: Vertical
Latitude: <Latitude>
Longitude: -81.12223327

For data sources see[1]

Well History

Well Status Well Status Date Comment
CO 1989-04-24 2816 P & S ENERGY INC GeoDate 4/24/89
Oil and Gas 1989-04-24 Issued Date 4/24/89 Expired Date 4/24/90 Acres 0040000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 04285 Proposed Drill Depth 04285
Original Spud 1989-05-17
Completed 1989-06-01
Reached Total Depth 1989-06-01
Completion Report Received 1989-06-13
CO 1991-07-09 2816 P & S ENERGY INC GeoDate 7/9/91
COMBINATION WELL 1991-07-09 Issued Date 7/9/91 Expired Date 7/8/92 Proposed Purpose OG Was Plug Supervised Y Who Superivsed KOHL, E.Plug and Abandon Date 7/24/91
Plugged/Abandoned 1991-07-24
Construction Permit Expires 1992-07-08
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 4092 4150 19

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 65460 Gal 50000 FRAC:SAND/WATER/N2 ASSIST
N2 0 230 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1989 P & S ENERGY INC 0 0 365
1990 P & S ENERGY INC 0 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1989 P & S ENERGY INC Brine 2314 365
1990 P & S ENERGY INC Brine 18 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
iDIAN00604 2001-04-30 Final Restoration No Violations

For data sources see[9]

References