If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Portage_County,_Ohio|Portage]] | | County: [[Portage_County,_Ohio|Portage]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Hiram Township,_Portage_County,_Ohio|Hiram Township]] |
|- | |- | ||
| Operator Name: [[KILBOURN EVELYN]] | | Operator Name: [[KILBOURN EVELYN]] |
Well ID: 34-133-20555 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.291879454,"lon":-81.17792122,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Hiram Township | |
Operator Name: KILBOURN EVELYN | |
Well Pad ID: | |
Farm/Lease Name: KILBOURN-POCHEDLY UNIT | |
License Status: Domestic Well | |
License Date: 1974-02-19 | |
Spud Date: 1975-08-08 | |
Spud Drilling Contractor: | |
Final Drill Date: 1975-08-15 | |
Well Total Depth: 4320 ft | |
Configuration: Vertical | |
Latitude: 41.291879454 | |
Longitude: -81.17792122 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1974-02-19 | 9 EDC GeoDate 2/19/74 |
Original Spud | 1975-08-08 | RE-ISSUE 7-9-75 |
Completed | 1975-08-15 | RE-ISSUE 7-9-75 |
Reached Total Depth | 1975-08-15 | RE-ISSUE 7-9-75 |
CO | 1993-12-10 | 4711 KILBOURN EVELYN GeoDate 2/19/74 |
Record Last Modified | 2009-12-11 | RE-ISSUE 7-9-75 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4197 | 4227 | 61 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 45000 Gal | 60000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | POWER GAS MARKETING & TRANS | 1378 | 286 | 0 |
1985 | POWER GAS MARKETING & TRANS | 1305 | 288 | 365 |
1987 | POWER GAS MARKETING & TRANS | 907 | 278 | 365 |
1988 | POWER GAS MARKETING & TRANS | 638 | 279 | 365 |
1989 | POWER GAS MARKETING & TRANS | 705 | 279 | 365 |
1990 | POWER GAS MARKETING & TRANS | 699 | 182 | 365 |
1991 | POWER GAS MARKETING & TRANS | 581 | 187 | 365 |
1992 | POWER GAS MARKETING & TRANS | 616 | 286 | 365 |
1993 | POWER GAS MARKETING & TRANS | 235 | 276 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1984 | POWER GAS MARKETING & TRANS | Brine | 166 | 0 |
1985 | POWER GAS MARKETING & TRANS | Brine | 163 | 365 |
1987 | POWER GAS MARKETING & TRANS | Brine | 259 | 365 |
1988 | POWER GAS MARKETING & TRANS | Brine | 259 | 365 |
1989 | POWER GAS MARKETING & TRANS | Brine | 141 | 365 |
1990 | POWER GAS MARKETING & TRANS | Brine | 115 | 365 |
1991 | POWER GAS MARKETING & TRANS | Brine | 121 | 365 |
1992 | POWER GAS MARKETING & TRANS | Brine | 309 | 365 |
1993 | POWER GAS MARKETING & TRANS | Brine | 271 | 365 |