X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-059-24381"

m
m
Line 11: Line 11:
 
| County: [[Guernsey_County,_Ohio|Guernsey]]
 
| County: [[Guernsey_County,_Ohio|Guernsey]]
 
|-
 
|-
| Municipality: [[Oxford_Township,_Guernsey_County,_Ohio|Oxford Township]]
+
| Municipality: [[Oxford Township,_Guernsey_County,_Ohio|Oxford Township]]
 
|-
 
|-
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
 
| Operator Name: [[ECLIPSE RESOURCES I LP]]
Line 33: Line 33:
 
| Configuration: Horizontal
 
| Configuration: Horizontal
 
|-
 
|-
| Latitude: 40.053297843
+
| Latitude: <Latitude>
 
|-
 
|-
 
| Longitude: -81.27875306
 
| Longitude: -81.27875306

Revision as of 12:27, 15 August 2019

Well Details

Well ID: 34-059-24381
Loading map...
Country: United States
State: Ohio
County: Guernsey
Municipality: Oxford Township
Operator Name: ECLIPSE RESOURCES I LP
Well Pad ID: US-OH-001003
Farm/Lease Name: BORTON C UNIT
License Status: Producing
License Date: 2014-07-24
Spud Date: 2014-06-21
Spud Drilling Contractor: PRECISION DRILLING
Final Drill Date: 2014-10-28
Well Total Depth: 16069 ft
Configuration: Horizontal
Latitude: <Latitude>
Longitude: -81.27875306

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-05-23 Proposed Formations:TRENTON, Issued Date:5/23/2014, Expired Date:5/22/2016 12:00:00 PM, Drilling unit acres:363.936, Proposed Well Type:ST, Proposed Well Class:STRT
Plugged Back 2014-10-10
Reached Total Depth 2014-10-28
Correction to Well 2014-12-05 CHANGE IN PERMIT TYPE AND PERMIT NUMBER PER INSPECTOR.
Construction Permit Expires 2016-07-23
Completion Report Received 2016-12-27
Record Last Modified 2017-10-23

For data sources see[2]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 06/09/2016 06/19/2016 8061 13,678,000.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hazardous and Non-Hazardous Ingredients Methanol 67-56-1 60 0.000666598 854
Reaction product of acetophenone, formaldehyde, thiourea and oleic acid in dimethyl formamide 68527-49-1 30 0.000333299 427
Propargyl alcohol 107-19-7 10 0.0001111 143
Oxyalkylated phenolic resin Confidential 30 0.000450996 579
Alcohols, C14-C15, ethoxylated 68951-67-7 30 0.000333299 427
Crystalline silica, quartz 14808-60-7 100 10.2415 13,115,100.0
Naphthalene 91-20-3 5 0.00005637 73
Water 7732-18-5 100 0.670944 859198
1,2,4 Trimethylbenzene 95-63-6 1 0.00001127 15
Acetic acid 64-19-7 60 0.00322414 4129
Hydrochloric acid 7647-01-0 15 0.10064 128880
Poly(oxy-1,2-ethanediyl), alpha-(4-nonylphenyl)-omega-hydroxy-, branched 127087-87-0 5 0.00005637 73
Olefins Confidential 5 0.00013332 174
Fatty acids, tall oil Confidential 30 0.000333299 427
Acetic anhydride 108-24-7 100 0.00537357 6882
Heavy aromatic petroleum naphtha 64742-94-5 30 0.000338247 434
Ethanol 64-17-5 60 0.000676494 867
Fresh Water Operator Base Fluid Fresh Water 7732-18-5 100 89.0799 114,074,000.0
FE-1A ACIDIZING COMPOSITION, HAI-OS ACID INHIBITOR
LOSURF-300D
SAND-COMMON WHITE-100 MESH
SSA-2, BULK (100003676), SAND-PREMIUM WHITE-40/70, BULK
Halliburton Additive, Corrosion Inhibitor, Non-ionic Surfactant, Proppant NA NA 0 0 0
HYDROCHLORIC ACID Halliburton Base Fluid NA NA 0 0 0

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2016-06-13 H2O 0 301845 Gal 318710 Halliburton 36 total perforations from 12649 feet to 12537 feet

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP 427609 45338 145
2017 ECLIPSE RESOURCES I LP 1155790 59537 364
2018 ECLIPSE RESOURCES I LP 613362 8991 362
2019 ECLIPSE RESOURCES I LP 115051 1237 90

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2016 ECLIPSE RESOURCES I LP Brine 4845 145
2017 ECLIPSE RESOURCES I LP Brine 17257 364
2018 ECLIPSE RESOURCES I LP Brine 8893 362
2019 ECLIPSE RESOURCES I LP Brine 1790 90

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0008178448 2017-06-07 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 910 pounds per square inch on the tubing and 1320 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
0259690353 2016-08-15 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and production trees with valves in the open position with 3500 pounds per square inch on the tubing and 3660 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
0665655520 2016-06-13 Completion Testing No Violations On the day of my inspection I witnessed Halliburton Services frac stage 23 of 48 with a breakdown pressure of 7291psi, average treating pressure of 8448psi, average rate of 84.3bbls/min with a total of 318710lbs of propant pumped. Completed walk around with Consultant Gilbert Augilar revealing proper secondary containment was in place and the fuel skid providing fuel for the frac job was in operation and supplied a total of 143600cuft of natural gas for the stage.
1059706726 2014-10-15 Drill / Deepen / Reopen No Violations On the day of my inspection I witnessed that Precision Drilling Rig #110 was drilling their curve at 7539 feet and had ran and cemented their 2nd intermediate casing string on Sunday. Walk around revealed no violations.
1104024017 2015-04-16 Preliminary Restoration No Violations On the day of my inspection the site passed preliminary restoration according to ORC 1509.072A.
1268379075 2016-08-08 Completion Testing No Violations On the day of my inspection I witnessed Tetra Services was onsite rigging down flowback equipment. I met with Consultant Cristo Giannareas and Eclipse Well Technician Bradley Paisley the well was put online with 3820 pounds per square inches on the casing and 3600 pounds per square inches on the tubing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.
1464966309 2016-06-03 Completion Testing No Violations On the day of my inspection I witnessed that frac stacks and secondary containment in place with frac operations planned to begin on June 9th. Completed walk around with Eclipse Superintendent Alex Pottmeyer who stated there are 48 stages planned for the well.
1670023263 2016-11-28 Production Wells No Violations On the day of my inspection I witnessed production equipment included a sand trap, a line heater, a GP Unit along with a 400 barrel purge tank within containment. The well was equipped with Sweco wellheads and a plunger lift system with valves in the open position with 2580 pounds per square inch on the tubing and 2680 pounds per square inch on the casing. Fluids and gas are separated at the GP unit and then transferred to the Borton CGF for sales.

For data sources see[9]

References