X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-23320"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Edinburg_Township,_Portage_County,_Ohio|Edinburg Township]]
+
| Municipality: [[Edinburg Township,_Portage_County,_Ohio|Edinburg Township]]
 
|-
 
|-
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]
 
| Operator Name: [[EVERFLOW EASTERN PTNS L P]]

Revision as of 15:08, 15 August 2019

Well Details

Well ID: 34-133-23320
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Edinburg Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: HARASYN
License Status: Producing
License Date: 1984-11-06
Spud Date: 1984-11-12
Spud Drilling Contractor: CVAS DRLG
Final Drill Date: 1984-11-20
Well Total Depth: 4810 ft
Configuration: Vertical
Latitude: 41.076611609
Longitude: -81.12618882

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1984-11-06 Issued Date 11/6/84 Expired Date 5/5/85 Acres 0050240 Tool Type RTA Proposed Formation CLINTON Proposed Depth 04810 Proposed Drill Depth 04810
Original Spud 1984-11-12
Completed 1984-11-20
Reached Total Depth 1984-11-20
CO 1984-12-07 84 EVERFLOW EASTERN PTNS L P GeoDate 11/6/84
Completion Report Received 1984-12-12
Construction Permit Expires 1985-05-05
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1997-06-29 4601 4730 0
2006-09-11 4642 4716 2

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 100000 Gal 60000 FRAC: H2O,SAND,N2
N2 0 177 Mscf 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PTNS L P 19475 6211 292
1986 EVERFLOW EASTERN PTNS L P 9247 1980 365
1987 EVERFLOW EASTERN PTNS L P 5033 3027 365
1988 EVERFLOW EASTERN PTNS L P 17392 4170 365
1989 EVERFLOW EASTERN PTNS L P 12884 3009 365
1990 EVERFLOW EASTERN PTNS L P 10279 2300 365
1991 EVERFLOW EASTERN PTNS L P 9238 2054 365
1992 EVERFLOW EASTERN PTNS L P 7864 1700 365
1993 EVERFLOW EASTERN PTNS L P 8261 1429 365
1994 EVERFLOW EASTERN PTNS L P 5516 1141 365
1995 EVERFLOW EASTERN PTNS L P 6830 1263 365
1996 EVERFLOW EASTERN PTNS L P 5748 1070 365
1997 EVERFLOW EASTERN PTNS L P 5558 966 365
1998 EVERFLOW EASTERN PTNS L P 4548 596 365
1999 EVERFLOW EASTERN PTNS L P 4232 657 365
2000 EVERFLOW EASTERN PTNS L P 5036 871 365
2001 EVERFLOW EASTERN PTNS L P 4580 723 365
2002 EVERFLOW EASTERN PTNS L P 5420 750 365
2003 EVERFLOW EASTERN PTNS L P 6308 830 365
2004 EVERFLOW EASTERN PTNS L P 5521 684 365
2005 EVERFLOW EASTERN PTNS L P 4731 539 365
2006 EVERFLOW EASTERN PTNS L P 4353 624 365
2007 EVERFLOW EASTERN PTNS L P 3887 555 365
2008 EVERFLOW EASTERN PTNS L P 3887 576 365
2009 EVERFLOW EASTERN PTNS L P 3843 313 365
2010 EVERFLOW EASTERN PTNS L P 2788 502 365
2011 EVERFLOW EASTERN PTNS L P 3002 402 365
2012 EVERFLOW EASTERN PTNS L P 4078 416 366
2013 EVERFLOW EASTERN PTNS L P 3408 452 365
2014 EVERFLOW EASTERN PTNS L P 2718 345 365
2015 EVERFLOW EASTERN PTNS L P 2970 298 365
2016 EVERFLOW EASTERN PTNS L P 2714 451 365
2017 EVERFLOW EASTERN PTNS L P 2992 340 365
2018 EVERFLOW EASTERN PTNS L P 2537 324 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1985 EVERFLOW EASTERN PTNS L P Brine 700 292
1986 EVERFLOW EASTERN PTNS L P Brine 120 365
1987 EVERFLOW EASTERN PTNS L P Brine 240 365
1988 EVERFLOW EASTERN PTNS L P Brine 302 365
1989 EVERFLOW EASTERN PTNS L P Brine 320 365
1990 EVERFLOW EASTERN PTNS L P Brine 135 365
1991 EVERFLOW EASTERN PTNS L P Brine 220 365
1992 EVERFLOW EASTERN PTNS L P Brine 150 365
1993 EVERFLOW EASTERN PTNS L P Brine 71 365
1994 EVERFLOW EASTERN PTNS L P Brine 99 365
1995 EVERFLOW EASTERN PTNS L P Brine 64 365
1996 EVERFLOW EASTERN PTNS L P Brine 60 365
1997 EVERFLOW EASTERN PTNS L P Brine 60 365
1998 EVERFLOW EASTERN PTNS L P Brine 80 365
1999 EVERFLOW EASTERN PTNS L P Brine 77 365
2000 EVERFLOW EASTERN PTNS L P Brine 152 365
2001 EVERFLOW EASTERN PTNS L P Brine 30 365
2002 EVERFLOW EASTERN PTNS L P Brine 216 365
2003 EVERFLOW EASTERN PTNS L P Brine 209 365
2004 EVERFLOW EASTERN PTNS L P Brine 153 365
2005 EVERFLOW EASTERN PTNS L P Brine 109 365
2006 EVERFLOW EASTERN PTNS L P Brine 100 365
2007 EVERFLOW EASTERN PTNS L P Brine 74 365
2008 EVERFLOW EASTERN PTNS L P Brine 77 365
2009 EVERFLOW EASTERN PTNS L P Brine 60 365
2010 EVERFLOW EASTERN PTNS L P Brine 122 365
2011 EVERFLOW EASTERN PTNS L P Brine 191 365
2012 EVERFLOW EASTERN PTNS L P Brine 168 366
2013 EVERFLOW EASTERN PTNS L P Brine 146 365
2014 EVERFLOW EASTERN PTNS L P Brine 150 365
2015 EVERFLOW EASTERN PTNS L P Brine 72 365
2016 EVERFLOW EASTERN PTNS L P Brine 81 365
2017 EVERFLOW EASTERN PTNS L P Brine 123 365
2018 EVERFLOW EASTERN PTNS L P Brine 45 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0000PL6039 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point

For data sources see[9]

References