If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 86: | Line 86: | ||
|- | |- | ||
| 2007 | | 2007 | ||
− | | | + | | [[DANNIC ENERGY CORP]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 203: | Line 203: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 208: | Line 209: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2008 | + | | 2008 |
+ | | [[DANNIC ENERGY CORP]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 245.00 Bbl | | style="text-align: right;" | 245.00 Bbl | ||
Line 214: | Line 216: | ||
| PA0095273 | | PA0095273 | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[DANNIC ENERGY CORP]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 240.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0028428 |
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[DANNIC ENERGY CORP]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 82.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0020346 |
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[DANNIC ENERGY CORP]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 240.00 Bbl | | style="text-align: right;" | 240.00 Bbl | ||
Line 232: | Line 237: | ||
| PA0028428 | | PA0028428 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
+ | | [[DANNIC ENERGY CORP]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 240.00 Bbl | | style="text-align: right;" | 240.00 Bbl |
Well ID: 37-065-26062 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.02437,"lon":-78.869126,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Jefferson | |
Municipality: Henderson Township | |
Operator Name: DANNIC ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: DAY 1 | |
License Status: Active | |
Spud Date: 2008-05-14 | |
Permit Date: 2007-11-01 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.024370 | |
Longitude: -78.869126 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2007 | DANNIC ENERGY CORP | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2008 | DANNIC ENERGY CORP | 2,346.86 | 214 | 0.00 | 0 | 0.00 | 0 |
2009 | DANNIC ENERGY CORP | 1,832.31 | 365 | 0.00 | 0 | 0.00 | 0 |
2010 | DANNIC ENERGY CORP | 1,055.06 | 365 | 0.00 | 0 | 0.00 | 0 |
2011 | DANNIC ENERGY CORP | 760.80 | 273 | 0.00 | 0 | 0.00 | 0 |
2012 | DANNIC ENERGY CORP | 795.83 | 274 | 0.00 | 0 | 0.00 | 0 |
2013 | DANNIC ENERGY CORP | 685.42 | 273 | 0.00 | 0 | 0.00 | 0 |
2014 | DANNIC ENERGY CORP | 604.00 | 273 | 0.00 | 0 | 0.00 | 0 |
2015 | DANNIC ENERGY CORP | 476.57 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | DANNIC ENERGY CORP | 436.00 | 305 | 0.00 | 0 | 0.00 | 0 |
2017 | DANNIC ENERGY CORP | 457.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | DANNIC ENERGY CORP | 411.39 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2008 | DANNIC ENERGY CORP | Produced Fluid (in Barrels) | 245.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0095273 |
2010 | DANNIC ENERGY CORP | Produced Fluid (in Barrels) | 240.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2010 | DANNIC ENERGY CORP | Produced Fluid (in Barrels) | 82.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0020346 |
2011 | DANNIC ENERGY CORP | Produced Fluid (in Barrels) | 240.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0028428 |
2012 | DANNIC ENERGY CORP | Produced Fluid (in Barrels) | 240.00 Bbl | PUBLIC SEWAGE TREATMENT PLANT | PA0028428 |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1706074 | Primary Facility | 2008-05-14 | Routine/Complete Inspection | No Violations Noted | |
1707849 | Primary Facility | 2008-05-21 | Drilling/Alteration | No Violations Noted | |
1731061 | Primary Facility | 2008-08-26 | Complaint Inspection | No Violations Noted | |
2426947 | Primary Facility | 2015-11-16 | Routine/Complete Inspection | No Violations Noted | |
2792893 | Primary Facility | 2018-10-23 | Routine/Complete Inspection | No Violations Noted | This well was drilled in a forested area off of Big Run Prescottville Road in May 2008. No violations were noted during this inspection, but the areas damaged by timber activity must be repaired, plastic caps and a section of steel pipe removed, and the original silt fence and associated stakes pulled. |
For data sources see[6]