X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-111-20274"

m
m
Line 86: Line 86:
 
|-
 
|-
 
| 2009
 
| 2009
| style="text-align: right;" |
+
| [[AB RESOURCES PA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 104: Line 104:
 
|-
 
|-
 
| 2011
 
| 2011
| [[CHIEF OIL & GAS LLC]]
+
| [[CHEVRON APPALACHIA LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 149: Line 149:
 
|-
 
|-
 
| 2016
 
| 2016
| [[CHEVRON APPALACHIA LLC]]
+
| [[LPR ENERGY LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 194: Line 194:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 199: Line 200:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2010-S02
+
| 2010
 +
| [[CHIEF OIL & GAS LLC]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,240.00 Bbl
 
| style="text-align: right;" | 1,240.00 Bbl
Line 205: Line 207:
 
| 301353
 
| 301353
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 2,280.00 Bbl
+
| style="text-align: right;" | 6,360.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PA0091472
+
| PBR
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 6,360.00 Bbl
+
| style="text-align: right;" | 2,280.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| PBR
+
| PA0091472
 
|-
 
|-
| 2011-S01
+
| 2011
 +
| [[CHIEF OIL & GAS LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 820.00 Bbl
 
| style="text-align: right;" | 820.00 Bbl
Line 223: Line 228:
 
| NY STATE #32S11
 
| NY STATE #32S11
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[CHEVRON APPALACHIA LLC]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 115.00 Bbl
 
| style="text-align: right;" | 115.00 Bbl
Line 229: Line 235:
 
|  
 
|  
 
|-
 
|-
| 2017-M01
+
| 2017
 +
| [[LPR ENERGY LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 399.00 Bbl
+
| style="text-align: right;" | 1,619.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2017-M02
+
| 2017
 +
| [[LPR ENERGY LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 811.00 Bbl
+
| style="text-align: right;" | 880.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123SW005
+
| WMGR123SW010
 
|-
 
|-
| 2017-M03
+
| 2017
 +
| [[LPR ENERGY LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 407.00 Bbl
+
| style="text-align: right;" | 1,928.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2017-M03
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 103.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 505.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 405.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 309.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 201.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 302.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 172.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 204.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 102.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW005
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 101.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123SW010
 
|-
 
| 2018-M01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 206.00 Bbl
 
| style="text-align: right;" | 206.00 Bbl
Line 337: Line 263:
 
| WMGR123SW005
 
| WMGR123SW005
 
|-
 
|-
| 2018-M02
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M04
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 206.00 Bbl
 
| style="text-align: right;" | 206.00 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE (AT WELL PAD)
| PAS2D561BSOM
+
|  
 
|-
 
|-
| 2018-M05
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 206.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 212.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M08
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 212.00 Bbl
 
| style="text-align: right;" | 212.00 Bbl
Line 379: Line 277:
 
| WMGR123SW010
 
| WMGR123SW010
 
|-
 
|-
| 2018-M09
+
| 2018
 +
| [[LPR ENERGY LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 206.00 Bbl
+
| style="text-align: right;" | 1,345.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM
 
|-
 
|-
| 2018-M10
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[LPR ENERGY LLC]]
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 206.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 206.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-M02
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 103.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
|-
 
| 2019-M03
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 103.00 Bbl
+
| style="text-align: right;" | 412.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D561BSOM
 
| PAS2D561BSOM

Revision as of 10:06, 20 August 2019

Well Details

Well ID: 37-111-20274
Loading map...
Country: United States
State: Pennsylvania
County: Somerset
Municipality: Middlecreek Township
Operator Name: LPR ENERGY LLC
Well Pad ID: 146525
Farm/Lease Name: SAYLOR UNIT 2H
License Status: Active
Spud Date: 2009-06-01
Permit Date: 2009-03-23
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.940766
Longitude: -79.246437

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 AB RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2010 CHIEF OIL & GAS LLC 0.00 0 0.00 0 0.00 0
2011 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2016 LPR ENERGY LLC 0.00 0 0.00 0 0.00 0
2017 LPR ENERGY LLC 212,657.00 356 0.00 0 0.00 0
2018 LPR ENERGY LLC 92,418.00 362 0.00 0 0.00 0
2019 LPR ENERGY LLC 22,110.00 87 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CHIEF OIL & GAS LLC Produced Fluid (in Barrels) 1,240.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 301353
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 6,360.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PBR
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 2,280.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0091472
2011 CHIEF OIL & GAS LLC Fracing Fluid Waste (in Barrels) 820.00 Bbl LANDFILL NY STATE #32S11
2012 CHEVRON APPALACHIA LLC Fracing Fluid Waste (in Barrels) 115.00 Bbl REUSE OTHER THAN ROAD SPREADING
2017 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 1,619.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 880.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2017 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 1,928.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2018 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 206.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 206.00 Bbl REUSE (AT WELL PAD)
2018 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 212.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW010
2018 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 1,345.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM
2019 LPR ENERGY LLC Produced Fluid (in Barrels) RWC 802 412.00 Bbl INJECTION DISPOSAL WELL PAS2D561BSOM

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1780703 Primary Facility 2009-03-27 Routine/Complete Inspection No Violations Noted site not made
1803034 Primary Facility 2009-06-04 Routine/Complete Inspection No Violations Noted Well site has been constructed and is in the pre-drill phase. The well site and access road are showing no signs of erosion and sedimentation. Site ID sign and E/S plan (ESCGP-1) are posted on site. The BMP's that are in place are functioning properly. Pit liner has been embedded properly. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete.
1804178 Primary Facility 2009-06-10 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 1014 ft. and setting the 13 5/8 inch piping. Pit aligned with 20 mil plastic with security fencing around pit. According to Tony, borehole has deviated 8.7 % at 1014 ft. from vertical. Chief plans to use another rig to correct the problem. Plan is to drill pilot hole to 8800 ft. and set kicker at 2500 ft where the horizontal drilling will continue. Met with Mr. Saylor and was satisfied with Chief
1808480 Primary Facility 2009-06-24 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 9,123 ft. Conductor pipe set 20¿ pipe at 78 ft. from grade (ffg). 13 3/8¿ pipe at 1,014 ft from grade used 725 class A sacks and 9 5/8¿ set at 2,004 ft used 700 sacks of class A sacks. Running second geophysical logging event after hole was deepen from 8960 ft to 9123 ft. According to Chief, roughly 500 ft above Marcellus, Chief will fill hole up to that point with cement and set a kicker. Pit aligned with 20 mil plastic and no free board issues.
1811747 Primary Facility 2009-07-08 Routine/Complete Inspection No Violations Noted There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed.
1816903 Primary Facility 2009-07-28 Routine/Complete Inspection No Violations Noted There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed.
1822554 Primary Facility 2009-08-14 Drilling/Alteration No Violations Noted At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig has met the total depth. Pit aligned with 20 mil plastic and no free board issues. Chief in the process of breaking down.
1828939 Primary Facility 2009-09-09 Routine/Complete Inspection No Violations Noted There are no signs of erosion and sedimentation on the well site or access road. The well has been drilled and not in production at the time of the inspection. Pit is maintaining 2 ft. freeboard. Decreasing levels of water staining was observed on the sides of the pit liner. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed.
1843009 Primary Facility 2009-11-03 Complaint Inspection No Violations Noted drilling complete, talked to landowner about complaint- WQ related
1899133 Primary Facility 2010-07-19 Routine/Complete Inspection No Violations Noted At the time of inspection, well site was properly signed. Previous attempts to restore were evident, but site was actively being reseeded to ensure uniform vegetative cover in areas that did not achieve 70% growth. Pits have been removed and area restored. Rock pad. Access road was in stable condition. No accelerated erosion or sedimentation issues were observed in relation to access road or site. It is recommended that operator continue to maintain all bmps until final (uniform) restoration measures are achieved. Sub- contracting rep (Keystone) Josh was onsite during inspection. A follow up inspection will be conduction to ensure reseeded areas sustain 70% vegetative growth and site is permanently restored/stabilized.
1952962 Primary Facility 2011-02-23 Routine/Complete Inspection No Violations Noted At the time of inspection, well site id and ES plan present, along with 24hr security. Well drilling and preparations for frac operation underway. Access rd and pad snow covered. No accelerated erosion or sedimentation issues noted. Bmp¿s installed and functioning. Pad is felt lined. No pits onsite, operator utilizing frac tanks. Tanks appear structurally sound. No IW issues noted. Pipeline from Bowers West impoundment utilized for frac operator currently disconnected due to pipeline break that occurred on 2/20/11, (see incident follow up inspection # 1952923). No visible evidence that previous line break adversely impacted this site, at the present time. No violations noted onsite. Site had previously been reseeded and mulched, but operator should continue to monitor site/access to prevent the potential for accelerated erosion or sedimentation concerns due to recent thaws and increased traffic.
1965630 Primary Facility 2011-04-14 Routine/Complete Inspection No Violations Noted At the time of inspection, site id sign, ES plan. Site gated with 24hr security guard. Access road stable. Well recently fraced, containment pad (felt /plastic lining placed below well location). No pits onsite, three frac tanks that appear to be sound, as well as 8 covered containment boxes. Temporary bmp¿s in place and functioning noted that previously disturbed areas have been reseeded and mulched with approximately 70% vegetative cover. No accelerated erosion or sedimentation issues observed on site or access road, although operator should continue to closely monitor all bmp¿s until final permanent site restoration is achieved. No IW issues noted.
1986073 Primary Facility 2011-06-14 Administrative/File Review No Violations Noted review of inactive status. approved
2004335 Primary Facility 2011-09-13 Routine/Complete Inspection No Violations Noted During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Site gated and locked. Access road entrance and roadway stable. Well drilled not yet in production; recently granted inactive status. Well head lined with felt and plastic-noted red staining on liner below well head-operator plans to ensure structural integrity of well head is not compromised¿may be result of rust. No pits located onsite, although one frac tank and two brine tanks on pad- both secured by secondary containment. Appears rainwater has begun to accumulate in containment unit due to recent heavy rains; department is recommending operator properly dispose of water from unit. Department recommends operator remove secondary containment liner (placed on pad) previously used during frac operation.
2009461 Primary Facility 2011-10-05 Routine/Complete Inspection No Violations Noted well was not in production. pipeline has been run to site and production equipment has been installed.
2067342 Primary Facility 2012-05-04 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2078972 Primary Facility 2012-06-26 Routine/Complete Inspection No Violations Noted Routine inspection. No issues noted.
2093094 Primary Facility 2012-06-21 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2128485 Primary Facility 2012-12-17 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2297822 Primary Facility 2014-08-20 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2310819 Primary Facility 2014-10-01 Routine/Complete Inspection No Violations Noted Well appeared to be equipped but was not in production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2323961 Primary Facility 2014-11-24 Routine/Complete Inspection No Violations Noted At the time of inspection, no E&S issues were present at the site. Gas well was not in production
2382920 Primary Facility 2015-06-15 Routine/Complete Inspection No Violations Noted system not running
2451792 Primary Facility 2016-02-17 Routine/Complete Inspection No Violations Noted no issues. inactive
2486253 Primary Facility 2016-05-19 Routine/Complete Inspection No Violations Noted system running. no issues
2532174 Primary Facility 2016-10-05 Routine/Complete Inspection No Violations Noted no issues. system running.
2561613 Primary Facility 2017-02-07 Routine/Complete Inspection Violation(s) Noted Single well Marcellus site.

Site ID sign, well permit, ERP, PPC plan, E&S plan on site. At time of inspection no E&S issues observed on access road. Well pad gated. Well pad rocked, no E&S issues observed. Well appears to be in production. Well head protected by one cement barrier. Well tag present and legible and affixed in a permanent manner. Two brine tanks located in secondary containment appear structurally sound. What appears to be two secondary containment liners remain on site. These liners are located on the east side of the pad and are draped over cement barriers. Department contacted Operator Rep Matt Gary by phone to inform Operator of residual waste left on site.

Violation is being issued for failure to dispose of residual waste.

2567014 Primary Facility 2017-02-23 Administrative/File Review Outstanding Violations - Viols Req'd Admin inspection to inspection record #2561613 where a violation was issued for failure to dispose of residual waste.

Department received response to NOV from Operator. In response, Operator stated that the liner that was used to put the well into production has been removed from the site.

A follow up inspection will be conducted at a later date.

Previously issued violation still exists for this site.

2568960 Primary Facility 2017-03-06 Compliance Evaluation No Violations Noted Compliance Evaluation Inspection to inspection record #2561613 where a violation was issued for failure to dispose of residual waste.

At time of inspection, secondary containment liner that was used to put the well into production has been removed from site.

Previously issued violation has been corrected; no oustanding violations exist for this site.

2594461 Primary Facility 2017-04-25 Routine/Complete Inspection No Violations Noted system running. no issues
2605026 Primary Facility 2017-06-15 Routine/Complete Inspection No Violations Noted system running. no issues
2626035 Primary Facility 2017-08-16 Routine/Complete Inspection No Violations Noted system running. no issues.
2638664 Primary Facility 2017-09-15 Routine/Complete Inspection No Violations Noted
2655878 Primary Facility 2017-11-02 Routine/Complete Inspection No Violations Noted System in production. No issues at the site.
2672122 Primary Facility 2017-12-18 Routine/Complete Inspection No Violations Noted System running
2672144 Primary Facility 2017-12-18 Routine/Partial Inspection In Compliance with Policy Routine partial inspection due to snow cover. At time of inspection well appears to be in production.
2683486 Primary Facility 2018-01-18 Routine/Complete Inspection No Violations Noted System running no issues. Well tag present. Emergency contact sign present.
2700667 Primary Facility 2018-03-05 Routine/Complete Inspection No Violations Noted Well tag present and emergency contact information present. No issues at the site
2710357 Primary Facility 2018-03-27 Routine/Complete Inspection No Violations Noted Well tag and emergency contact number present at the site. No issues at the site
2724330 Primary Facility 2018-04-26 Routine/Complete Inspection No Violations Noted Well pad surrounded by security fence. Well appears equipped for production.

Department observed possible animal activity at base of eastern side (photo #1) and northern side (photo #2) of secondary containment unit. Department recommends operator continue to monitor and maintain secondary containment to ensure unit does not become compromised.

2728414 Primary Facility 2018-05-09 Routine/Complete Inspection No Violations Noted Well was in production. Well tag and emergency contact present. No issues at the site
2853783 Primary Facility 2019-03-14 Routine/Complete Inspection No Violations Noted System running. Well in production. Production reports submitted to state.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2561613 778534 2017-02-07 2017-03-06 78a54 Environmental Health & Safety
2567014 779663 2017-02-23 2017-03-06 78a54 Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
778534 351085 NOV - Notice of Violation 2017-03-06
779663 351085 NOV - Notice of Violation 2017-03-06

For data sources see[6]

References