If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 86: | Line 86: | ||
|- | |- | ||
| 2009 | | 2009 | ||
− | | | + | | [[AB RESOURCES PA LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 104: | Line 104: | ||
|- | |- | ||
| 2011 | | 2011 | ||
− | | [[ | + | | [[CHEVRON APPALACHIA LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 149: | Line 149: | ||
|- | |- | ||
| 2016 | | 2016 | ||
− | | [[ | + | | [[LPR ENERGY LLC]] |
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
| style="text-align: right;" | 0 | | style="text-align: right;" | 0 | ||
Line 194: | Line 194: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity | ||
Line 199: | Line 200: | ||
!scope="col" | Waste Facility ID | !scope="col" | Waste Facility ID | ||
|- | |- | ||
− | | 2010 | + | | 2010 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Produced Fluid (in Barrels) | | Produced Fluid (in Barrels) | ||
| style="text-align: right;" | 1,240.00 Bbl | | style="text-align: right;" | 1,240.00 Bbl | ||
Line 205: | Line 207: | ||
| 301353 | | 301353 | ||
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 6,360.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PBR |
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 2,280.00 Bbl |
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
− | | | + | | PA0091472 |
|- | |- | ||
− | | 2011 | + | | 2011 |
+ | | [[CHIEF OIL & GAS LLC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 820.00 Bbl | | style="text-align: right;" | 820.00 Bbl | ||
Line 223: | Line 228: | ||
| NY STATE #32S11 | | NY STATE #32S11 | ||
|- | |- | ||
− | | 2012 | + | | 2012 |
+ | | [[CHEVRON APPALACHIA LLC]] | ||
| Fracing Fluid Waste (in Barrels) | | Fracing Fluid Waste (in Barrels) | ||
| style="text-align: right;" | 115.00 Bbl | | style="text-align: right;" | 115.00 Bbl | ||
Line 229: | Line 235: | ||
| | | | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[LPR ENERGY LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,619.00 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[LPR ENERGY LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 880.00 Bbl |
| RESIDUAL WASTE PROCESSING FACILITY | | RESIDUAL WASTE PROCESSING FACILITY | ||
− | | | + | | WMGR123SW010 |
|- | |- | ||
− | | 2017 | + | | 2017 |
+ | | [[LPR ENERGY LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,928.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D561BSOM | | PAS2D561BSOM | ||
|- | |- | ||
− | | | + | | 2018 |
− | + | | [[LPR ENERGY LLC]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 206.00 Bbl | | style="text-align: right;" | 206.00 Bbl | ||
Line 337: | Line 263: | ||
| WMGR123SW005 | | WMGR123SW005 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[LPR ENERGY LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 206.00 Bbl | | style="text-align: right;" | 206.00 Bbl | ||
− | | | + | | REUSE (AT WELL PAD) |
− | | | + | | |
|- | |- | ||
− | | 2018 | + | | 2018 |
− | | | + | | [[LPR ENERGY LLC]] |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
| style="text-align: right;" | 212.00 Bbl | | style="text-align: right;" | 212.00 Bbl | ||
Line 379: | Line 277: | ||
| WMGR123SW010 | | WMGR123SW010 | ||
|- | |- | ||
− | | 2018 | + | | 2018 |
+ | | [[LPR ENERGY LLC]] | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 1,345.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D561BSOM | | PAS2D561BSOM | ||
|- | |- | ||
− | + | | 2019 | |
− | + | | [[LPR ENERGY LLC]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | 2019 | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | | | ||
| Produced Fluid (in Barrels) RWC 802 | | Produced Fluid (in Barrels) RWC 802 | ||
− | | style="text-align: right;" | | + | | style="text-align: right;" | 412.00 Bbl |
| INJECTION DISPOSAL WELL | | INJECTION DISPOSAL WELL | ||
| PAS2D561BSOM | | PAS2D561BSOM |
Well ID: 37-111-20274 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.940766,"lon":-79.246437,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Somerset | |
Municipality: Middlecreek Township | |
Operator Name: LPR ENERGY LLC | |
Well Pad ID: 146525 | |
Farm/Lease Name: SAYLOR UNIT 2H | |
License Status: Active | |
Spud Date: 2009-06-01 | |
Permit Date: 2009-03-23 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.940766 | |
Longitude: -79.246437 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2009 | AB RESOURCES PA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2010 | CHIEF OIL & GAS LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2012 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2013 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2016 | LPR ENERGY LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | LPR ENERGY LLC | 212,657.00 | 356 | 0.00 | 0 | 0.00 | 0 |
2018 | LPR ENERGY LLC | 92,418.00 | 362 | 0.00 | 0 | 0.00 | 0 |
2019 | LPR ENERGY LLC | 22,110.00 | 87 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2010 | CHIEF OIL & GAS LLC | Produced Fluid (in Barrels) | 1,240.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | 301353 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste (in Barrels) | 6,360.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PBR |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste (in Barrels) | 2,280.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0091472 |
2011 | CHIEF OIL & GAS LLC | Fracing Fluid Waste (in Barrels) | 820.00 Bbl | LANDFILL | NY STATE #32S11 |
2012 | CHEVRON APPALACHIA LLC | Fracing Fluid Waste (in Barrels) | 115.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 1,619.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 880.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 1,928.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2018 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 206.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 206.00 Bbl | REUSE (AT WELL PAD) | |
2018 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 212.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2018 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 1,345.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
2019 | LPR ENERGY LLC | Produced Fluid (in Barrels) RWC 802 | 412.00 Bbl | INJECTION DISPOSAL WELL | PAS2D561BSOM |
For data sources see[5]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1780703 | Primary Facility | 2009-03-27 | Routine/Complete Inspection | No Violations Noted | site not made |
1803034 | Primary Facility | 2009-06-04 | Routine/Complete Inspection | No Violations Noted | Well site has been constructed and is in the pre-drill phase. The well site and access road are showing no signs of erosion and sedimentation. Site ID sign and E/S plan (ESCGP-1) are posted on site. The BMP's that are in place are functioning properly. Pit liner has been embedded properly. Operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are complete. |
1804178 | Primary Facility | 2009-06-10 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 1014 ft. and setting the 13 5/8 inch piping. Pit aligned with 20 mil plastic with security fencing around pit. According to Tony, borehole has deviated 8.7 % at 1014 ft. from vertical. Chief plans to use another rig to correct the problem. Plan is to drill pilot hole to 8800 ft. and set kicker at 2500 ft where the horizontal drilling will continue. Met with Mr. Saylor and was satisfied with Chief |
1808480 | Primary Facility | 2009-06-24 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig was at 9,123 ft. Conductor pipe set 20¿ pipe at 78 ft. from grade (ffg). 13 3/8¿ pipe at 1,014 ft from grade used 725 class A sacks and 9 5/8¿ set at 2,004 ft used 700 sacks of class A sacks. Running second geophysical logging event after hole was deepen from 8960 ft to 9123 ft. According to Chief, roughly 500 ft above Marcellus, Chief will fill hole up to that point with cement and set a kicker. Pit aligned with 20 mil plastic and no free board issues. |
1811747 | Primary Facility | 2009-07-08 | Routine/Complete Inspection | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed. |
1816903 | Primary Facility | 2009-07-28 | Routine/Complete Inspection | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well site has been constructed and was in the drilling phase at the time of the inspection. Pit is maintaining 2 ft. freeboard. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed. |
1822554 | Primary Facility | 2009-08-14 | Drilling/Alteration | No Violations Noted | At the time of inspection, no E&S or IW discharge issues at the site. E/S plan and sign at the entrance of the access road. No mud detected on the township road near the access road. Chief drilling utilizing a UD- 43 rig has met the total depth. Pit aligned with 20 mil plastic and no free board issues. Chief in the process of breaking down. |
1828939 | Primary Facility | 2009-09-09 | Routine/Complete Inspection | No Violations Noted | There are no signs of erosion and sedimentation on the well site or access road. The well has been drilled and not in production at the time of the inspection. Pit is maintaining 2 ft. freeboard. Decreasing levels of water staining was observed on the sides of the pit liner. There is a good vegetative filter strip surrounding the site. The operator should continue to monitor the access road and well site for erosion and sedimentation until final restoration activities are completed. |
1843009 | Primary Facility | 2009-11-03 | Complaint Inspection | No Violations Noted | drilling complete, talked to landowner about complaint- WQ related |
1899133 | Primary Facility | 2010-07-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well site was properly signed. Previous attempts to restore were evident, but site was actively being reseeded to ensure uniform vegetative cover in areas that did not achieve 70% growth. Pits have been removed and area restored. Rock pad. Access road was in stable condition. No accelerated erosion or sedimentation issues were observed in relation to access road or site. It is recommended that operator continue to maintain all bmps until final (uniform) restoration measures are achieved. Sub- contracting rep (Keystone) Josh was onsite during inspection. A follow up inspection will be conduction to ensure reseeded areas sustain 70% vegetative growth and site is permanently restored/stabilized. |
1952962 | Primary Facility | 2011-02-23 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, well site id and ES plan present, along with 24hr security. Well drilling and preparations for frac operation underway. Access rd and pad snow covered. No accelerated erosion or sedimentation issues noted. Bmp¿s installed and functioning. Pad is felt lined. No pits onsite, operator utilizing frac tanks. Tanks appear structurally sound. No IW issues noted. Pipeline from Bowers West impoundment utilized for frac operator currently disconnected due to pipeline break that occurred on 2/20/11, (see incident follow up inspection # 1952923). No visible evidence that previous line break adversely impacted this site, at the present time. No violations noted onsite. Site had previously been reseeded and mulched, but operator should continue to monitor site/access to prevent the potential for accelerated erosion or sedimentation concerns due to recent thaws and increased traffic. |
1965630 | Primary Facility | 2011-04-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, site id sign, ES plan. Site gated with 24hr security guard. Access road stable. Well recently fraced, containment pad (felt /plastic lining placed below well location). No pits onsite, three frac tanks that appear to be sound, as well as 8 covered containment boxes. Temporary bmp¿s in place and functioning noted that previously disturbed areas have been reseeded and mulched with approximately 70% vegetative cover. No accelerated erosion or sedimentation issues observed on site or access road, although operator should continue to closely monitor all bmp¿s until final permanent site restoration is achieved. No IW issues noted. |
1986073 | Primary Facility | 2011-06-14 | Administrative/File Review | No Violations Noted | review of inactive status. approved |
2004335 | Primary Facility | 2011-09-13 | Routine/Complete Inspection | No Violations Noted | During this inspection, Chevron Regulatory Compliance Personnel and WQS Marc Maestra present. Well ID sign, ES plan w/ PPC plan, and ESCGP-1 onsite. Site gated and locked. Access road entrance and roadway stable. Well drilled not yet in production; recently granted inactive status. Well head lined with felt and plastic-noted red staining on liner below well head-operator plans to ensure structural integrity of well head is not compromised¿may be result of rust. No pits located onsite, although one frac tank and two brine tanks on pad- both secured by secondary containment. Appears rainwater has begun to accumulate in containment unit due to recent heavy rains; department is recommending operator properly dispose of water from unit. Department recommends operator remove secondary containment liner (placed on pad) previously used during frac operation. |
2009461 | Primary Facility | 2011-10-05 | Routine/Complete Inspection | No Violations Noted | well was not in production. pipeline has been run to site and production equipment has been installed. |
2067342 | Primary Facility | 2012-05-04 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2078972 | Primary Facility | 2012-06-26 | Routine/Complete Inspection | No Violations Noted | Routine inspection. No issues noted. |
2093094 | Primary Facility | 2012-06-21 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2128485 | Primary Facility | 2012-12-17 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2297822 | Primary Facility | 2014-08-20 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2310819 | Primary Facility | 2014-10-01 | Routine/Complete Inspection | No Violations Noted | Well appeared to be equipped but was not in production. Brine tanks located onsite and they appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road. |
2323961 | Primary Facility | 2014-11-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection, no E&S issues were present at the site. Gas well was not in production |
2382920 | Primary Facility | 2015-06-15 | Routine/Complete Inspection | No Violations Noted | system not running |
2451792 | Primary Facility | 2016-02-17 | Routine/Complete Inspection | No Violations Noted | no issues. inactive |
2486253 | Primary Facility | 2016-05-19 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2532174 | Primary Facility | 2016-10-05 | Routine/Complete Inspection | No Violations Noted | no issues. system running. |
2561613 | Primary Facility | 2017-02-07 | Routine/Complete Inspection | Violation(s) Noted | Single well Marcellus site.
Site ID sign, well permit, ERP, PPC plan, E&S plan on site. At time of inspection no E&S issues observed on access road. Well pad gated. Well pad rocked, no E&S issues observed. Well appears to be in production. Well head protected by one cement barrier. Well tag present and legible and affixed in a permanent manner. Two brine tanks located in secondary containment appear structurally sound. What appears to be two secondary containment liners remain on site. These liners are located on the east side of the pad and are draped over cement barriers. Department contacted Operator Rep Matt Gary by phone to inform Operator of residual waste left on site. Violation is being issued for failure to dispose of residual waste. |
2567014 | Primary Facility | 2017-02-23 | Administrative/File Review | Outstanding Violations - Viols Req'd | Admin inspection to inspection record #2561613 where a violation was issued for failure to dispose of residual waste.
Department received response to NOV from Operator. In response, Operator stated that the liner that was used to put the well into production has been removed from the site. A follow up inspection will be conducted at a later date. Previously issued violation still exists for this site. |
2568960 | Primary Facility | 2017-03-06 | Compliance Evaluation | No Violations Noted | Compliance Evaluation Inspection to inspection record #2561613 where a violation was issued for failure to dispose of residual waste.
At time of inspection, secondary containment liner that was used to put the well into production has been removed from site. Previously issued violation has been corrected; no oustanding violations exist for this site. |
2594461 | Primary Facility | 2017-04-25 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2605026 | Primary Facility | 2017-06-15 | Routine/Complete Inspection | No Violations Noted | system running. no issues |
2626035 | Primary Facility | 2017-08-16 | Routine/Complete Inspection | No Violations Noted | system running. no issues. |
2638664 | Primary Facility | 2017-09-15 | Routine/Complete Inspection | No Violations Noted | |
2655878 | Primary Facility | 2017-11-02 | Routine/Complete Inspection | No Violations Noted | System in production. No issues at the site. |
2672122 | Primary Facility | 2017-12-18 | Routine/Complete Inspection | No Violations Noted | System running |
2672144 | Primary Facility | 2017-12-18 | Routine/Partial Inspection | In Compliance with Policy | Routine partial inspection due to snow cover. At time of inspection well appears to be in production. |
2683486 | Primary Facility | 2018-01-18 | Routine/Complete Inspection | No Violations Noted | System running no issues. Well tag present. Emergency contact sign present. |
2700667 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | Well tag present and emergency contact information present. No issues at the site |
2710357 | Primary Facility | 2018-03-27 | Routine/Complete Inspection | No Violations Noted | Well tag and emergency contact number present at the site. No issues at the site |
2724330 | Primary Facility | 2018-04-26 | Routine/Complete Inspection | No Violations Noted | Well pad surrounded by security fence. Well appears equipped for production.
Department observed possible animal activity at base of eastern side (photo #1) and northern side (photo #2) of secondary containment unit. Department recommends operator continue to monitor and maintain secondary containment to ensure unit does not become compromised. |
2728414 | Primary Facility | 2018-05-09 | Routine/Complete Inspection | No Violations Noted | Well was in production. Well tag and emergency contact present. No issues at the site |
2853783 | Primary Facility | 2019-03-14 | Routine/Complete Inspection | No Violations Noted | System running. Well in production. Production reports submitted to state. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2561613 | 778534 | 2017-02-07 | 2017-03-06 | 78a54 | Environmental Health & Safety | |
2567014 | 779663 | 2017-02-23 | 2017-03-06 | 78a54 | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
778534 | 351085 | NOV - Notice of Violation | 2017-03-06 | ||||
779663 | 351085 | NOV - Notice of Violation | 2017-03-06 |
For data sources see[6]