If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 90: | Line 90: | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
!scope="col" | Period | !scope="col" | Period | ||
+ | !scope="col" | Operator | ||
!scope="col" | Waste Type | !scope="col" | Waste Type | ||
!scope="col" | Quantity | !scope="col" | Quantity |
Well ID: 37-115-20006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.776933,"lon":-75.697692,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Harford Township | |
Operator Name: SHELL OIL CO | |
Well Pad ID: | |
Farm/Lease Name: H WESLEY PEASE UNIT 1 | |
License Status: Plugged OG Well | |
Spud Date: 1973-09-18 | |
Permit Date: 1973-09-04 | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Latitude: 41.776933 | |
Longitude: -75.697692 |
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2223909 | Primary Facility | 2013-11-07 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | |
2223916 | Primary Facility | 2013-11-18 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | clean out to 750" high gas pressure 700#+ |
2227162 | Primary Facility | 2013-12-09 | Plugging(Includes Plugged/Mined Through) | No Violations Noted | cabot crew tagged casing seat plug at 2432' |
2530688 | Primary Facility | 2016-10-21 | Site Restoration | No Violations Noted | On 10/21/16, the Department conducted an inspection of the Cabot Pease Well P&A Orphan Well Site to determine if the Department agrees with Cabot’s assessment that the site meets the criteria for the permits termination. The Department found that a high percentage of the site has been impacted by the installation and overlap of the Williams Polk Pipeline. Areas outside of the LOD of the pipeline are permanently stabilized. Areas within the LOD of the Polk Pipeline are temporarily stabilized. Hence, since the parts of the Pease site are covered by the Polk Pipeline ESCGP, and since the Pease site outside of the Polk LOD is permanently stabilized, the I recommend this notice of termination be approved. |
682766 | Primary Facility | 1990-03-21 | Routine/Complete Inspection | No Violations Noted |
For data sources see[4]