X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-20791"

m
m
Line 234: Line 234:
 
|-
 
|-
 
| 2010
 
| 2010
| [[EAST RESOURCES INC]]
+
| [[EAST RESOURCES MGMT LLC]]
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 333: Line 333:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity
Line 338: Line 339:
 
!scope="col" | Waste Facility ID
 
!scope="col" | Waste Facility ID
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[SWEPI LP]]
 
| Drill Cuttings (in Tons)
 
| Drill Cuttings (in Tons)
 
| style="text-align: right;" | 2.84 Tons
 
| style="text-align: right;" | 2.84 Tons
Line 344: Line 346:
 
| WMGR123NC006
 
| WMGR123NC006
 
|-
 
|-
| 2012-S01
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 70.00 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 20.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2012-S01
+
| 2012
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,691.90 Bbl
+
| style="text-align: right;" | 41.50 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| REUSE OTHER THAN ROAD SPREADING
| WMGR119
+
|  
 
|-
 
|-
| 2012-S02
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 347.43 Bbl
+
| Produced Fluid (in Barrels)
 +
| style="text-align: right;" | 20.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR119
+
| WMGR123SW018
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[SWEPI LP]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 107.82 Bbl
+
| style="text-align: right;" | 177.82 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2012-S02
+
| 2012
| Fracing Fluid Waste (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 58.10 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| WMGR123SW018
 
|-
 
| 2012-S02
 
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 2,169.49 Bbl
 
| style="text-align: right;" | 2,169.49 Bbl
Line 380: Line 381:
 
|  
 
|  
 
|-
 
|-
| 2012-S02
+
| 2012
| Produced Fluid (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 40.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 58.10 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR119
+
| WMGR123SW018
 
|-
 
|-
| 2012-S02
+
| 2012
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 20.00 Bbl
+
| style="text-align: right;" | 1,731.90 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123
+
| WMGR119
 
|-
 
|-
| 2012-S02
+
| 2012
| Produced Fluid (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 20.00 Bbl
+
| Fracing Fluid Waste (in Barrels)
 +
| style="text-align: right;" | 347.43 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123SW018
+
| WMGR119
 
|-
 
|-
| 2012-S02
+
| 2013
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 41.50 Bbl
+
| style="text-align: right;" | 195.14 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
|  
+
| WMGR123
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[SWEPI LP]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 105.43 Bbl
 
| style="text-align: right;" | 105.43 Bbl
Line 410: Line 416:
 
| WMGR119
 
| WMGR119
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 319.05 Bbl
+
| style="text-align: right;" | 37.74 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123SW018
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 195.14 Bbl
+
| style="text-align: right;" | 319.05 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123
+
| WMGR119
 
|-
 
|-
| 2013-S01
+
| 2013
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 37.74 Bbl
+
| style="text-align: right;" | 4,211.80 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| REUSE OTHER THAN ROAD SPREADING
| WMGR123SW018
+
|  
 
|-
 
|-
| 2013-S01
+
| 2014
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 3,117.40 Bbl
+
| style="text-align: right;" | 1,405.20 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2013-S02
+
| 2014
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 1,094.40 Bbl
+
| style="text-align: right;" | 100.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
|  
+
| WMGR123NC018
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[SWEPI LP]]
 
| Drilling Fluid Waste (in Barrels)
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
Line 446: Line 458:
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2014
 +
| [[SWEPI LP]]
 
| Fracing Fluid Waste (in Barrels)
 
| Fracing Fluid Waste (in Barrels)
| style="text-align: right;" | 83.81 Bbl
+
| style="text-align: right;" | 103.81 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2014-S01
+
| 2015
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 656.67 Bbl
+
| style="text-align: right;" | 200.00 Bbl
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 20.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2014-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 100.00 Bbl
 
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC018
 
| WMGR123NC018
 
|-
 
|-
| 2014-S02
+
| 2015
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels)
 
| Produced Fluid (in Barrels)
| style="text-align: right;" | 748.53 Bbl
+
| style="text-align: right;" | 1,385.20 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S01
+
| 2016
| Produced Fluid (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 80.00 Bbl
+
| Produced Fluid (in Barrels) RWC 802
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| style="text-align: right;" | 1,465.20 Bbl
| WMGR123NC018
 
|-
 
| 2015-S01
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 151.00 Bbl
 
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2015-S02
+
| 2016
| Produced Fluid (in Barrels)
+
| [[SWEPI LP]]
| style="text-align: right;" | 120.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NC018
 
|-
 
| 2015-S02
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 1,234.20 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S01
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.82 Bbl
 
| style="text-align: right;" | 60.82 Bbl
Line 506: Line 493:
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2016-S01
+
| 2016
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 701.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016-S02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| style="text-align: right;" | 20.00 Bbl
Line 518: Line 500:
 
| WMGR123NC018
 
| WMGR123NC018
 
|-
 
|-
| 2016-S02
+
| 2017
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 764.20 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2017-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 64.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC018
 
|-
 
| 2017-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 821.65 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2017-M03
+
| 2017
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 20.00 Bbl
+
| style="text-align: right;" | 41.59 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M04
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2017-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 200.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 60.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 19.70 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2017-M08
+
| 2017
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 121.40 Bbl
+
| style="text-align: right;" | 200.25 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 21.89 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2017-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 20.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2017-M09
+
| 2017
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 80.00 Bbl
+
| style="text-align: right;" | 64.00 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC022
+
| WMGR123NC018
 
|-
 
|-
| 2017-M11
+
| 2018
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 20.00 Bbl
+
| style="text-align: right;" | 64.61 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2017-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 0.25 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC022
+
| WMGR123
 
|-
 
|-
| 2017-M12
+
| 2018
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 100.25 Bbl
+
| style="text-align: right;" | 960.00 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
 
|-
 
|-
| 2018-M01
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 100.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 75.00 Bbl
+
| style="text-align: right;" | 431.25 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2018-M03
+
| 2018
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 75.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 100.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M04
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 120.00 Bbl
+
| style="text-align: right;" | 79.55 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 43.23 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2018-M05
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 23.00 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
| WMGR123NC010
 
|-
 
|-
| 2018-M05
+
| 2019
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 60.00 Bbl
+
| style="text-align: right;" | 56.19 Bbl
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M06
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 300.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-M07
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-M08
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 80.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M09
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 125.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2018-M10
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 21.38 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
| WMGR123
 
|-
 
|-
| 2018-M10
+
| 2019
 +
| [[SWEPI LP]]
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
| style="text-align: right;" | 56.55 Bbl
+
| style="text-align: right;" | 75.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC010
 
|-
 
| 2018-M11
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 51.25 Bbl
 
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
| WMGR123NC022
 
|-
 
|-
| 2018-M12
+
| 2019
| Produced Fluid (in Barrels) RWC 802
+
| [[SWEPI LP]]
| style="text-align: right;" | 100.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2018-M12
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| REUSE (AT WELL PAD)
 
|
 
|-
 
| 2019-M01
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
|-
 
| 2019-M02
 
 
| Produced Fluid (in Barrels) RWC 802
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 50.25 Bbl
 
| style="text-align: right;" | 50.25 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
 
|  
 
|  
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 56.19 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123
 
|-
 
| 2019-M03
 
| Produced Fluid (in Barrels) RWC 802
 
| style="text-align: right;" | 25.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NC022
 
 
|-
 
|-
 
|}
 
|}

Revision as of 17:42, 20 August 2019

Well Details

Well ID: 37-117-20791
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Sullivan Township
Operator Name: SWEPI LP
Well Pad ID: 149615
Farm/Lease Name: YORK 480 1H
License Status: Active
Spud Date: 2011-01-31
Permit Date: 2010-07-16
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.810883
Longitude: -76.945847

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-08-07 2011-08-07 5915.00 1,996,146.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand Various Proppagates Frac Quartz 14808-60-7 100.00 14.59
Friction Reducer Clearwater International Reduce psi and HHP Polyacrylamide 9003-05-8 100.00 0.02
Acid Inhibitor Clearwater International Protects Steel Isopropanol 67-63-0 40.00 0.00042000
Ethoxylated Nonylphenol 13.00 0.00014000
Propargyl alcohol 107-19-7 40.00 0.00042000
2-Butoxyethanol 111-76-2 40.00 0.00042000
Gel Clearwater International Adds Viscosity to Water Fumaric acid 110-17-8 7.00 0.00008000
Enzymatic Breaker Clearwater International Breaks Gel Ethylene glycol 107-21-1 60.00 0.00003000
Water / Produced Water Shell Carrier Fluid H2O + Disolved Salts 100.00 85.40
Acid Various Opens Perfs Hydrochloric acid 7647-01-0 15.00 0.06
Scale Inhibitor Clearwater International Prevents Scale Ethylene glycol 107-21-1 40.00 0.01
Superflo 100 CESI Chemical Aids in Wetability and Flowback Isopropanol 67-63-0 15.00 0.00931000
Citrus terpenes 94266-47-4 15.00 0.00931000
Biocide Nalco Kills Bacteria 2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00330000
Polyethylene glycol 25322-68-3 60.00 0.00659000
Dibromoacetonitrile 3252-43-5 5.00 0.00055000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 EAST RESOURCES MGMT LLC 0.00 0 0.00 0 0.00 0
2011 SWEPI LP 19,923.61 16 0.00 0 0.00 0
2012 SWEPI LP 163,232.65 366 0.00 0 0.00 0
2013 SWEPI LP 133,823.32 311 0.00 0 0.00 0
2014 SWEPI LP 112,947.33 278 0.00 0 0.00 0
2015 SWEPI LP 87,846.18 177 0.00 0 0.00 0
2016 SWEPI LP 78,624.36 117 0.00 0 0.00 0
2017 SWEPI LP 95,726.64 112 0.00 0 0.00 0
2018 SWEPI LP 122,452.14 166 0.00 0 0.00 0
2019 SWEPI LP 24,318.48 45 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 SWEPI LP Drill Cuttings (in Tons) 2.84 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2012 SWEPI LP Produced Fluid (in Barrels) 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 SWEPI LP Produced Fluid (in Barrels) 41.50 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SWEPI LP Produced Fluid (in Barrels) 20.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 SWEPI LP Fracing Fluid Waste (in Barrels) 177.82 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 SWEPI LP Fracing Fluid Waste (in Barrels) 2,169.49 Bbl REUSE OTHER THAN ROAD SPREADING
2012 SWEPI LP Fracing Fluid Waste (in Barrels) 58.10 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW018
2012 SWEPI LP Produced Fluid (in Barrels) 1,731.90 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2012 SWEPI LP Fracing Fluid Waste (in Barrels) 347.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2013 SWEPI LP Produced Fluid (in Barrels) 195.14 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 SWEPI LP Fracing Fluid Waste (in Barrels) 105.43 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 SWEPI LP Produced Fluid (in Barrels) 37.74 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW018
2013 SWEPI LP Produced Fluid (in Barrels) 319.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013 SWEPI LP Produced Fluid (in Barrels) 4,211.80 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Produced Fluid (in Barrels) 1,405.20 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Produced Fluid (in Barrels) 100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014 SWEPI LP Drilling Fluid Waste (in Barrels) 40.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 SWEPI LP Fracing Fluid Waste (in Barrels) 103.81 Bbl REUSE OTHER THAN ROAD SPREADING
2015 SWEPI LP Produced Fluid (in Barrels) 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015 SWEPI LP Produced Fluid (in Barrels) 1,385.20 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Produced Fluid (in Barrels) RWC 802 1,465.20 Bbl REUSE OTHER THAN ROAD SPREADING
2016 SWEPI LP Produced Fluid (in Barrels) RWC 802 60.82 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 SWEPI LP Produced Fluid (in Barrels) RWC 802 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017 SWEPI LP Produced Fluid (in Barrels) RWC 802 821.65 Bbl REUSE (AT WELL PAD)
2017 SWEPI LP Produced Fluid (in Barrels) RWC 802 41.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 SWEPI LP Produced Fluid (in Barrels) RWC 802 200.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017 SWEPI LP Produced Fluid (in Barrels) RWC 802 64.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018 SWEPI LP Produced Fluid (in Barrels) RWC 802 64.61 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 SWEPI LP Produced Fluid (in Barrels) RWC 802 960.00 Bbl REUSE (AT WELL PAD)
2018 SWEPI LP Produced Fluid (in Barrels) RWC 802 431.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2018 SWEPI LP Produced Fluid (in Barrels) RWC 802 79.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2019 SWEPI LP Produced Fluid (in Barrels) RWC 802 56.19 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2019 SWEPI LP Produced Fluid (in Barrels) RWC 802 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2019 SWEPI LP Produced Fluid (in Barrels) RWC 802 50.25 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1973736 Primary Facility 2011-05-18 Drilling/Alteration No Violations Noted
2017719 Primary Facility 2011-11-08 Routine/Complete Inspection No Violations Noted
2075594 Primary Facility 2012-06-13 Routine/Complete Inspection No Violations Noted 6 gas wells in production
2153504 Primary Facility 2013-03-21 Routine/Complete Inspection No Violations Noted
2160567 Primary Facility 2013-04-16 Site Restoration No Violations Noted NOT denied. Puddle 2.2 mS/cm. 200'x200' staging area, not on plan.
2400276 Primary Facility 2015-08-17 Site Restoration No Violations Noted The Department inspected the SWEPI LP – York 480 site in Sullivan Township, Tioga Co. on 8/17/15 @ 1015 hours in response to receipt of a Notice of Termination by the Department on 7/27/2015. The weather was 79° and sunny.
2832665 Primary Facility 2019-01-29 Routine/Complete Inspection No Violations Noted Cold/snowy and windy at time of inspection.

For data sources see[7]

References