X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-117-21962"

m
m
Line 90: Line 90:
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Period
 
!scope="col" | Period
 +
!scope="col" | Operator
 
!scope="col" | Waste Type
 
!scope="col" | Waste Type
 
!scope="col" | Quantity
 
!scope="col" | Quantity

Revision as of 19:50, 20 August 2019

Well Details

Well ID: 37-117-21962
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Morris Township
Operator Name: SWN PROD CO LLC
Well Pad ID:
Farm/Lease Name: LONG RUN TIMBER B 7H
License Status:
Spud Date:
Permit Date: 2018-01-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.599981
Longitude: -77.239375

For data sources see[1][2][3]


Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2682307 Primary Facility 2018-01-11 Routine/Complete Inspection No Violations Noted I conducted a routine inspection of the SWN Production Company's T1-24-Long Run Timber B well pad located in Morris Twp., Tioga Co. on 1/11/2017 @ 1400 hours. The weather was 53 degrees and partly cloudy. Present onsite for the inspection were Tracy Gregory, SWN Enginerring Regulatory Analyst; Tom Chitwood Jr., SWN Construction Foreman and Seth Tratthen, SWN Sr Regulatory Analyst.

Construction of the T1-24-Long Run Timber B Well Pad (ESG29-117-15-0018) was suspended in late 2015/early 2016 due to financial reasons. Approximately 6100' of the access road has been constructed. E&S BMPs are in place. The road appears stabilized. The original 4H well permit was renewed 10/13/2016 and expired 10/13/2017. The 6H permit expired 8/11/2016. Applications for 3 new well permits the 5H, 6H and 7H, were submitted fall of 2017, and are "active" in the system but no issuance date is listed. SWN plans to resume construction of the site this year.

No issue or violations were noted during the inspection. I departed the sit

For data sources see[4]

References