If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Knox_County,_Ohio|Knox]] | | County: [[Knox_County,_Ohio|Knox]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Monroe_Township,_Knox_County,_Ohio|Monroe Township]] |
|- | |- | ||
| Operator Name: [[BI JOE DEVELOPMENT INC]] | | Operator Name: [[BI JOE DEVELOPMENT INC]] |
Well ID: 34-083-24525 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.441252708,"lon":-82.41087026,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Monroe Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: GAMBIER DEVELOPMENT INC | |
License Status: Producing | |
License Date: 2011-07-01 | |
Spud Date: 2011-09-17 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2011-09-26 | |
Well Total Depth: 4532 ft | |
Configuration: Vertical | |
Latitude: 40.441252708 | |
Longitude: -82.41087026 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-07-01 | Proposed Formations:TREMPEALEAU, Issued Date:7/1/2011, Expired Date:6/30/2013 12:00:00 PM, Drilling unit acres:32, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-09-26 | |
Completion Report Received | 2012-06-05 | |
Construction Permit Expires | 2013-06-30 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2012-06-14 | 4358 | 4470 | 56 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-10-03 | ACID | 15 | 3150 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2011 | BI JOE DEVELOPMENT INC | 388 | 747 | 92 |
2012 | BI JOE DEVELOPMENT INC | 1925 | 1690 | 366 |
2013 | BI JOE DEVELOPMENT INC | 1148 | 1002 | 365 |
2014 | BI JOE DEVELOPMENT INC | 837 | 880 | 365 |
2015 | BI JOE DEVELOPMENT INC | 674 | 555 | 365 |
2016 | BI JOE DEVELOPMENT INC | 415 | 334 | 365 |
2017 | BI JOE DEVELOPMENT INC | 482 | 534 | 365 |
2018 | BI JOE DEVELOPMENT INC | 336 | 82 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BI JOE DEVELOPMENT INC | Brine | 75 | 92 |
2012 | BI JOE DEVELOPMENT INC | Brine | 250 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 285 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 225 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 300 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 150 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 295 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 70 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0248420303 | 2013-04-25 | Preliminary Restoration | No Violations | This well is a producing well. |
1612775979 | 2011-09-19 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Set and cement Surface casing. During cementing of casing, belt on deck motor broke. Cement company washed out all cement. And, called for a replacement rig and reloaded with bulk cement. |
2071551281 | 2011-09-20 | Drill / Deepen / Reopen | No Violations | Inspect drill site. Current depth of 912 feet. |
2122316914 | 2011-09-19 | Administrative Inspection | No Violations | Cementing of surface casing. After belt on deck motor broke, cement was washed out. Replacement truck was requested. Operator called with notification cement job was completed and plug was down at 6:00 am, and testing of BOP will be at 6pm. |
For data sources see[9]