If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Muskingum_County,_Ohio|Muskingum]] | | County: [[Muskingum_County,_Ohio|Muskingum]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Newton_Township,_Muskingum_County,_Ohio|Newton Township]] |
|- | |- | ||
| Operator Name: [[KNOX ENERGY INC.]] | | Operator Name: [[KNOX ENERGY INC.]] |
Well ID: 34-119-28547 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.845057713,"lon":-82.0311482,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Newton Township | |
Operator Name: KNOX ENERGY INC. | |
Well Pad ID: | |
Farm/Lease Name: LOTTES & YODER (PAINT VALLEY HEARTLAND) | |
License Status: Producing | |
License Date: 2005-08-26 | |
Spud Date: 2005-11-29 | |
Spud Drilling Contractor: PROFESSIONAL WELL SVC-PWS | |
Final Drill Date: 2005-12-04 | |
Well Total Depth: 4023 ft | |
Configuration: Vertical | |
Latitude: 39.845057713 | |
Longitude: -82.03114820 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-08-26 | Proposed Formations:CLINTON, Issued Date:8/26/2005, Expired Date:8/26/2006 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2005-11-29 | RBDMS Rec |
Completed | 2005-12-04 | RBDMS Rec |
Reached Total Depth | 2005-12-04 | RBDMS Rec |
Completion Report Received | 2006-08-10 | RBDMS Rec |
Construction Permit Expires | 2006-08-26 | RBDMS Rec |
Change of Owner | 2018-11-20 | Operator changed from 236, R C POLING CO INC to 6295, KNOX ENERGY INC. |
Record Last Modified | 2018-11-20 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-10-26 | 3853 | 3859 | 12 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 82000 Gal | 25000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | R C POLING CO INC | 1984 | 0 | 365 |
2008 | R C POLING CO INC | 1826 | 0 | 365 |
2009 | R C POLING CO INC | 2098 | 0 | 365 |
2010 | R C POLING CO INC | 1830 | 0 | 365 |
2011 | R C POLING CO INC | 2126 | 0 | 365 |
2012 | R C POLING CO INC | 3343 | 0 | 366 |
2013 | R C POLING CO INC | 3090 | 0 | 365 |
2014 | R C POLING CO INC | 4428 | 0 | 365 |
2015 | R C POLING CO INC | 3737 | 0 | 365 |
2016 | R C POLING CO INC | 2785 | 0 | 365 |
2017 | R C POLING CO INC | 3584 | 0 | 365 |
2018 | KNOX ENERGY INC. | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2007 | R C POLING CO INC | Brine | 0 | 365 |
2008 | R C POLING CO INC | Brine | 0 | 365 |
2009 | R C POLING CO INC | Brine | 0 | 365 |
2010 | R C POLING CO INC | Brine | 0 | 365 |
2011 | R C POLING CO INC | Brine | 0 | 365 |
2012 | R C POLING CO INC | Brine | 0 | 366 |
2013 | R C POLING CO INC | Brine | 0 | 365 |
2014 | R C POLING CO INC | Brine | 60 | 365 |
2015 | R C POLING CO INC | Brine | 0 | 365 |
2016 | R C POLING CO INC | Brine | 0 | 365 |
2017 | R C POLING CO INC | Brine | 0 | 365 |
2018 | R C POLING CO INC | Brine | 0 | 288 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0095741232 | 2006-08-08 | Preliminary Restoration | No Violations | |
0416539436 | 2014-09-08 | Production Wells | No Violations | The contaminated soil has been removed. There was 40 barrel of total fluids removed from area. The only compliance issue was identification not placed on well or tank. |
0505928240 | 2006-12-20 | Preliminary Restoration | No Violations | Producing |
1143546368 | 2006-03-27 | Preliminary Restoration | No Violations | Location roughed in. Not completed yet. |
1409831785 | 2014-09-03 | Production Wells | Violations Noted | Inspected well based on complaint #4788. The complainant was Abbey Kindler. She noticed the dike around the 100 barrel tank was full of crude oil and had ran over the dike on 8-15-14 around noon. She called on 9-2-14. I revealed that there was a dike that had approximately measured 30x40in circumference. There was 1-100 barrel tank and a vertical separator with in the dike. The dike was full of crude oil and had ran over leaving approximately a 20x30oil soaked spot. The source of the release inside the dike is unknown at this time. After calling and talking to Dick Poling he would have men and equipment out on site on 9-4-14. The well is equipped with a pumping unit and the production manifold has been shut in.There is prime mover of a natural gas powered single piston motor. The identification is incomplete at the well and the tank. There is second 100 barrel tank down by the entrance with a dike and no identification. The company was instructed to remove all oil and contaminated soil and dispose of properly. The date of cleanup is 9-4-14. Attach all identification to the tanks. Failure to comply will result in further enforcement action. |
1409935715 | 2014-09-04 | Administrative Inspection | No Violations | Dick Poling called and stated that there was approximately 40 barrel cleaned up. 4 barrel was crude oil the rest was production water. The site was cleaned up and rediked. There was a nipple leaking on the tank. |
1410351937 | 2014-09-09 | Administrative Inspection | No Violations | Dick Poling called and stated that the well identification has been attached to the tank. I will check at later date. |
1421264992 | 2014-09-22 | Production Wells | No Violations | I stopped by location and all material has been cleaned up and removed. All identification has been placed at the 1-100 barrel tank battery. There is a new dike constructed around the tank that exceeds the 110% containment. The Compliance Notice # 1409831785 has been resolved on 9-22-14 by Patrick Shreve. |
1493253582 | 2007-11-07 | Production Wells | No Violations | Producing, no problems noted. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1409831785 | US-OH-112065 | 2014-09-29 | Well operation causing pollution and contamination | |
1409831785 | US-OH-112066 | 2014-09-29 | Failure to legibly identify well | |
1409831785 | US-OH-112067 | 2014-09-29 | No SPCC dike/or failure to keep dike free of water or oil |
For data sources see[9]