If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Monroe_County,_Ohio|Monroe]] | | County: [[Monroe_County,_Ohio|Monroe]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Wayne_Township,_Monroe_County,_Ohio|Wayne Township]] |
|- | |- | ||
| Operator Name: [[2BYERS ENTERPRISES LLC]] | | Operator Name: [[2BYERS ENTERPRISES LLC]] |
Well ID: 34-111-24299 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.702830816,"lon":-81.18160898,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Monroe | |
Municipality: Wayne Township | |
Operator Name: 2BYERS ENTERPRISES LLC | |
Well Pad ID: | |
Farm/Lease Name: ROGER BROWN | |
License Status: Producing | |
License Date: 2011-07-05 | |
Spud Date: 2011-10-03 | |
Spud Drilling Contractor: R WOLFE DRLG | |
Final Drill Date: 2011-10-05 | |
Well Total Depth: 2700 ft | |
Configuration: Vertical | |
Latitude: 39.702830816 | |
Longitude: -81.18160898 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-07-05 | Proposed Formations:GORDON, Issued Date:7/5/2011, Expired Date:7/4/2013 12:00:00 PM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-10-05 | |
Completion Report Received | 2011-10-24 | |
Construction Permit Expires | 2013-07-04 | |
Change of Owner | 2014-11-12 | Operator changed from 4597, BYERS DARROL C to 9372, 2BYERS ENTERPRISES LLC |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-12-13 | 2039 | 2048 | 19 |
2011-12-13 | 2292 | 2336 | 26 |
2011-12-13 | 2419 | 2627 | 63 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-10-11 | H2O | 20 | 80000 Gal | 0 | Universal Well Services Inc. | 1ST STAGE |
2011-10-11 | H2O | 20 | 80000 Gal | 0 | Universal Well Services Inc. | STAGE 2/ 30' SAND |
2011-10-11 | H2O | 20 | 60000 Gal | 0 | Universal Well Services Inc. | STAGE 3 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BYERS DARROL C | 100 | 74 | 60 |
2012 | BYERS DARROL C | 3341 | 247 | 366 |
2013 | BYERS DARROL C | 3604 | 153 | 365 |
2014 | BYERS DARROL C | 4212 | 0 | 365 |
2015 | 2BYERS ENTERPRISES LLC | 8125 | 0 | 365 |
2016 | 2BYERS ENTERPRISES LLC | 3552 | 0 | 350 |
2017 | 2BYERS ENTERPRISES LLC | 1000 | 30 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BYERS DARROL C | Brine | 658 | 60 |
2012 | BYERS DARROL C | Brine | 154 | 366 |
2013 | BYERS DARROL C | Brine | 85 | 365 |
2014 | BYERS DARROL C | Brine | 0 | 365 |
2015 | 2BYERS ENTERPRISES LLC | Brine | 0 | 365 |
2016 | 2BYERS ENTERPRISES LLC | Brine | 0 | 350 |
2017 | 2BYERS ENTERPRISES LLC | Brine | 20 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1042837929 | 2014-02-25 | Production Wells | No Violations | Status check inspection found the following equipment present at the well head- 4.5 producton casing- 1.5 tubing and pumping rods with the production valves open and the well set up to be produced by the means of a pumping unit, At the production fluid storage area 2- 100 barrel production tanks are present in an established dike area along with a mechanical separator and domestic gas meter with proper well identification posted. |
1343077178 | 2012-07-23 | Preliminary Restoration | No Violations | Inspection of the well head found the following equipment present, 7 surface casing, 4.5 production casing, 1.5 tubing & rods with the production valves open and the well being produced by the means of a pumping unit . At the production fluid storage area 2-100 barrel storage tanks are present with a separator and gas meter in an established dike. |
For data sources see[9]