X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-103-25047"

m
m
Line 11: Line 11:
 
| County: [[Medina_County,_Ohio|Medina]]
 
| County: [[Medina_County,_Ohio|Medina]]
 
|-
 
|-
| Municipality: [[Seville Village,_Medina_County,_Ohio|Seville Village]]
+
| Municipality: [[Seville,_Medina_County,_Ohio|Seville]]
 
|-
 
|-
 
| Operator Name: [[BLEACHTECH LLC]]
 
| Operator Name: [[BLEACHTECH LLC]]

Revision as of 18:33, 31 August 2019

Well Details

Well ID: 34-103-25047
Loading map...
Country: United States
State: Ohio
County: Medina
Municipality: Seville
Operator Name: BLEACHTECH LLC
Well Pad ID:
Farm/Lease Name: BLEACHTECH (SMP #2)
License Status: Active Injection
License Date: 2014-01-28
Spud Date: 2014-02-22
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2014-03-03
Well Total Depth: 2630 ft
Configuration: Vertical
Latitude: 41.028745020
Longitude: -81.87236383

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-01-28 Proposed Formations:SALINA F1 SALT, Issued Date:1/28/2014, Expired Date:1/28/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP
Reached Total Depth 2014-03-03
Last Compliance Report 2014-04-16
Completion Report Received 2014-04-23
Construction Permit Expires 2016-01-28
Record Last Modified 2018-11-30

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0150558545 2014-02-25 Drill / Deepen / Reopen No Violations Visited location on 02/25/2014 for surface casing cement job. Rig drilled a 14 3/4 hole to 660, and ran 631 of 11 3/4, 32# surface casing with a collar on the bottom and 2 centralizers. Rigged up Petroset for cement job. Cement job went well; got 8 bbls good cement returns to surface.
0582478629 2018-11-29 Solution Mining Project No Violations I was on location to witness a Mechanical Integrity Test (MIT). After eight (8) hours the average test well pressure was 223.567 psi and the average reference well pressure was 80.603 with a difference of 142.964 psi. The calculated net pressure change resulted in 0.02 psi/hr., which is well below the maximum net pressure change of 0.05 psi/hr. MIT passed.
0840077672 2014-03-02 Drill / Deepen / Reopen No Violations Visited location on 03/02/2014 for production casing cement job. Rig drilled 11 hole to 2,427 and ran 2,388 of 8 5/8, 32# production casing. Rigged up Petroset for cement job. Cement job went well; 380 bbls good cement returns to surface. Performed MIT test after cement job. Pressured up well to 1150 psi for 15 minutes. No noticeable pressure lost during test; test passed. Plan forward is to wait on cement, and then drill-out to TD.
0916608826 2017-05-18 Solution Mining Project No Violations Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection.
1028310105 2014-04-03 Drill / Deepen / Reopen No Violations Visited location on 04/03/2014 to witness logging job on the Bleachtech #13 well. The hole was loaded on 04/02/2014 with pit water (note: drilling operations had been completed the previous week, so solids in pit had settled out and water was taken from top of pit). Appalachian Well Services rigged up and logged the well. The cement bond on the 8 5/8 casing looked excellent throughout the entire length of the string.
1033963541 2014-10-23 Preliminary Restoration No Violations Visited location on 10/23/2014 to check on the restoration status of the well. The well is equipped for production; well identification is clearly displayed next to the wellhead. All pits have been closed and drilling equipment removed. Preliminary Restoration passes.
1156372579 2017-12-01 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1606667013 2018-03-30 Solution Mining Project No Violations I found the injection well in operation on the day of my inspection. There is calcification build-up on the tubing. I observed no leaks or spills around the well. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time.
1721455863 2014-04-10 Drill / Deepen / Reopen No Violations Visited location on 04/10/2014. Crew was working to harden pit for Bleachtech #14 and #13 wells with fly ash from Chem Tech. No problems were noted at the time.
1751501323 2014-02-22 Drill / Deepen / Reopen No Violations Visited rig on 02/22/2014 for conductor casing cement job. Rig drilled 20 hole to 178 on freshwater mud. 4 joints of 16, 65# conductor casing was run to 161. Rigged up Petroset to cement well to surface. Cement job went well; got 14 bbls good cement returns to surface. Plan forward is to wait on cement.
1946409363 2014-02-26 Drill / Deepen / Reopen No Violations Visited rig to check on status of drilling operations. At the tim eof the inspection, rig was drilling ahead at 1,488.

For data sources see[3]

References