If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Guernsey_County,_Ohio|Guernsey]] | | County: [[Guernsey_County,_Ohio|Guernsey]] | ||
|- | |- | ||
− | | Municipality: [[ | + | | Municipality: [[Wills_Township,_Guernsey_County,_Ohio|Wills Township]] |
|- | |- | ||
| Operator Name: [[ECLIPSE RESOURCES I LP]] | | Operator Name: [[ECLIPSE RESOURCES I LP]] | ||
Line 33: | Line 33: | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: | + | | Latitude: 40.028632426 |
|- | |- | ||
| Longitude: -81.34654436 | | Longitude: -81.34654436 |
Well ID: 34-059-24417 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.028632426,"lon":-81.34654436,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Guernsey | |
Municipality: Wills Township | |
Operator Name: ECLIPSE RESOURCES I LP | |
Well Pad ID: US-OH-001114 | |
Farm/Lease Name: FINERAN B | |
License Status: Well Drilled | |
License Date: 2019-01-14 | |
Spud Date: 2014-08-26 | |
Spud Drilling Contractor: H&P DRILLING | |
Final Drill Date: 2019-01-26 | |
Well Total Depth: 24700 ft | |
Configuration: Horizontal | |
Latitude: 40.028632426 | |
Longitude: -81.34654436 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-08-25 | Proposed Formations:TRENTON, Issued Date:8/25/2014, Expired Date:8/24/2016 12:00:00 PM, Drilling unit acres:683.601, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2016-12-16 | Proposed Formations:TRENTON, Issued Date:12/16/2016, Expired Date:12/16/2018 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2018-10-30 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:10/30/2018, Expired Date:10/29/2020 12:00:00 PM, Drilling unit acres:254.083, Proposed Well Type:OG, Proposed Well Class:POOL |
APP | 2019-01-14 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/14/2019, Expired Date:1/13/2021 12:00:00 PM, Drilling unit acres:657.067, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2019-01-26 | |
Record Last Modified | 2019-04-08 | |
Construction Permit Expires | 2021-01-13 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0077444923 | 2015-04-29 | Preliminary Restoration | No Violations | On the day of my inspection accompanied by Southeast Regional Supervisor Brent Bear, the site passed preliminary restoration according to ORC 1509.072A. |
0384400814 | 2019-02-12 | Completion Testing | No Violations | The well was awaiting hydraulic stimulation operations. Pro Frac Services were on location pumping the first stage on the 7 H 3405924418. |
0524251870 | 2014-09-15 | Casing String Witnessed | No Violations | On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had drilled a 22inch diameter hole to the depth of 439 feet and ran 439 feet of 18.625 inch 87.5#/ft. J-55 casing. Halliburton was on site gained circulation with 165bbls fresh water then pumped 25bbls of gel, 10bbls of fresh water and cemented casing with 290 sacks of BondCem cement with a weight of 15.8ppg verified by mud scales and a yield of 2.31cuft/sk. Cement was displaced with 120bbls of fresh water. Good circulation throughout job no cement was returned to surface only gel spacer. Alpha-Hunter Drilling Rig #9 ran 75 feet of 1 inch pipe and Halliburton topped off with 126 sacks of Class A 15.6ppg and a yield of 1.18. Good cement returns of 6bbls to surface. |
0818102540 | 2019-01-22 | Drill / Deepen / Reopen | No Violations | During my inspection today, I was accompanied by Pat Shreve. H&P Drilling Rig 531 was on location tripping the drill pipe out of the hole after reaching total depth. Eclipse Company Man on location was Wade Gray. |
0953919454 | 2019-05-13 | Completion Testing | No Violations | During my inspection the well was equipped with a work over valve. All frac plugs have been drilled out and the well is awaiting flow back operations. Deep Well Snubbing Unit 15 was rigged up on the 3H well. |
0991545861 | 2014-09-17 | Drill / Deepen / Reopen | No Violations | On the day of my inspection I witnessed that Alpha Hunter Drilling Rig #9 had completed cementing of their 13.325 inch intermediate casing and was rigging up their BOP with testing to follow. |
0994463842 | 2019-05-28 | Completion Testing | No Violations | The purpose of my inspection was a status check. During my inspection the wells were being prepared for flow back operations. Deep Well Snubbing Unit rig number 15 was being hauled from location. Production equipment was being assembled on location. |
1161136766 | 2019-01-17 | Drill / Deepen / Reopen | No Violations | The inspection revealed that the H&P 531 RIG is drilling at a depth of 13,646 feet in the lateral. The consultant Jack Turner stated that the total depth is 24,681 feet and will be reaching in 7 days. |
1548252902 | 2019-01-22 | Drill / Deepen / Reopen | No Violations | |
2084285340 | 2019-04-30 | Completion Testing | No Violations | The purpose of my inspection was a status check on completion operations. During my inspection the well had just recently had 111 stages of frac plugs drilled out and production tubing installed. A service rig was on location rigged up on the 7H well drilling out frac plugs. |
For data sources see[3]