If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 11: | Line 11: | ||
| County: [[Portage_County,_Ohio|Portage]] | | County: [[Portage_County,_Ohio|Portage]] | ||
|- | |- | ||
− | | Municipality: [[Kent | + | | Municipality: [[Kent,_Ohio|Kent]] |
|- | |- | ||
| Operator Name: [[EOS ENERGY LLC]] | | Operator Name: [[EOS ENERGY LLC]] |
Well ID: 34-133-24364 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.145853857,"lon":-81.32870712,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Kent | |
Operator Name: EOS ENERGY LLC | |
Well Pad ID: | |
Farm/Lease Name: SCHOTERMAN A OR D UNIT | |
License Status: Producing | |
License Date: 2008-06-17 | |
Spud Date: 2008-07-22 | |
Spud Drilling Contractor: POULSON DRILLING | |
Final Drill Date: 2008-07-29 | |
Well Total Depth: 4367 ft | |
Configuration: Vertical | |
Latitude: 41.145853857 | |
Longitude: -81.32870712 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2008-06-17 | Proposed Formations:OHIO SHALE THRU CLINTON, Issued Date:6/17/2008, Expired Date:6/17/2009 6:00:00 AM, Drilling unit acres:50, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2008-07-22 | |
Reached Total Depth | 2008-07-29 | |
Completion Report Received | 2008-12-23 | |
Construction Permit Expires | 2009-06-17 | |
Change of Owner | 2018-07-31 | Operator changed from 1249, CUTTER OIL COMPANY to 10185, EOS ENERGY LLC |
Record Last Modified | 2018-07-31 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2009-02-13 | 4142 | 4192 | 73 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
N2 | 7 | 200 Mscf | 70000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER OIL COMPANY | 0 | 169 | 100 |
2009 | CUTTER OIL COMPANY | 41176 | 724 | 365 |
2010 | CUTTER OIL COMPANY | 26708 | 334 | 365 |
2011 | CUTTER OIL COMPANY | 24410 | 239 | 365 |
2012 | CUTTER OIL COMPANY | 22479 | 194 | 366 |
2013 | CUTTER OIL COMPANY | 15774 | 97 | 365 |
2014 | CUTTER OIL COMPANY | 14067 | 91 | 365 |
2015 | CUTTER OIL COMPANY | 9701 | 0 | 365 |
2016 | CUTTER OIL COMPANY | 11431 | 107 | 365 |
2017 | CUTTER OIL COMPANY | 12133 | 188 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | CUTTER OIL COMPANY | Brine | 1980 | 100 |
2009 | CUTTER OIL COMPANY | Brine | 471 | 365 |
2010 | CUTTER OIL COMPANY | Brine | 356 | 365 |
2011 | CUTTER OIL COMPANY | Brine | 145 | 365 |
2012 | CUTTER OIL COMPANY | Brine | 225 | 366 |
2013 | CUTTER OIL COMPANY | Brine | 117 | 365 |
2014 | CUTTER OIL COMPANY | Brine | 172 | 365 |
2015 | CUTTER OIL COMPANY | Brine | 248 | 365 |
2016 | CUTTER OIL COMPANY | Brine | 103 | 365 |
2017 | CUTTER OIL COMPANY | Brine | 296 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0417077795 | 2009-09-16 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
0706038603 | 2008-07-28 | Drill / Deepen / Reopen | No Violations | Drilling will be completed today with logging and running production casing to follow. The rig should be moving off tomorrow. |
0735910623 | 2008-09-17 | Drill / Deepen / Reopen | No Violations | The well and tank battery have been fenced. The site has been graded and seeded. The well will be turned on as soon as the Dominion tap has been made. No violations at this time. |
0957824327 | 2008-08-01 | Drill / Deepen / Reopen | No Violations | Chemtech and Cutter Oil were on site to solidify the drilling pits. |
1246869413 | 2018-11-27 | UrbanProduction Wells | No Violations | Status check inspection of this Clinton Sandstone well. My inspection found the wellhead and tank battery fenced with board on board fencing and the man doors locked. The wellhead is equipped with 2.375 tubing and rods and is operating with the aid of an electric powered pumping unit. There is a domestic tap on the 4.5 production casing that is currently disconnected. This well produces to a diked tank battery on location containing two (2) 140 barrel tanks, a 35 barrel poly tank, and a horizontal separator. There is a Dominion Roots meter run inside the battery. The tank hatch lids are sealed and the tanks are vented through a 42 gallon charcoal filter. The required ID signage is posted at the wellhead and at the tank battery. No violations. |
1342787641 | 2008-10-21 | Production Wells | No Violations | The well is in production. The required fencing and identification are in place. |
2129403864 | 2008-07-21 | Drill / Deepen / Reopen | No Violations | Poulson Drilling is moving on site and will spud the well on 7/22. The working pits has been dug and lined and is being filled with fresh water. The sign is posted at the lease entrance and the fence around the pits will be installed as soon as the blow pit has been dug. |
For data sources see[9]