X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-133-24392"

m
m
Line 11: Line 11:
 
| County: [[Portage_County,_Ohio|Portage]]
 
| County: [[Portage_County,_Ohio|Portage]]
 
|-
 
|-
| Municipality: [[Kent City,_Portage_County,_Ohio|Kent City]]
+
| Municipality: [[Kent,_Ohio|Kent]]
 
|-
 
|-
 
| Operator Name: [[SUMMIT PETROLEUM INC]]
 
| Operator Name: [[SUMMIT PETROLEUM INC]]

Revision as of 03:05, 1 September 2019

Well Details

Well ID: 34-133-24392
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Kent
Operator Name: SUMMIT PETROLEUM INC
Well Pad ID:
Farm/Lease Name: CAPTAIN BRADY UNIT
License Status: Producing
License Date: 2010-07-02
Spud Date: 2010-07-08
Spud Drilling Contractor: POULSON DRILLING
Final Drill Date: 2010-07-14
Well Total Depth: 4263 ft
Configuration: Vertical
Latitude: 41.148870745
Longitude: -81.37534197

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-07-02 Proposed Formations:CLINTON, Issued Date:7/2/2010, Expired Date:7/2/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2010-07-14
Completion Report Received 2010-09-08
Construction Permit Expires 2011-07-02
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2011-12-22 4070 4128 26

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2010-07-27 H2O 15 89000 Gal 50000 Universal Well Services Inc.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2010 SUMMIT PETROLEUM INC 1009 0 93
2011 SUMMIT PETROLEUM INC 8594 336 365
2012 SUMMIT PETROLEUM INC 2187 109 366
2013 SUMMIT PETROLEUM INC 4502 435 365
2014 SUMMIT PETROLEUM INC 14195 565 365
2015 SUMMIT PETROLEUM INC 3410 228 365
2016 SUMMIT PETROLEUM INC 3041 225 365
2017 SUMMIT PETROLEUM INC 1930 112 365
2018 SUMMIT PETROLEUM INC 1917 114 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 SUMMIT PETROLEUM INC Brine 2792 93
2011 SUMMIT PETROLEUM INC Brine 784 365
2012 SUMMIT PETROLEUM INC Brine 193 366
2013 SUMMIT PETROLEUM INC Brine 1319 365
2014 SUMMIT PETROLEUM INC Brine 1011 365
2015 SUMMIT PETROLEUM INC Brine 487 365
2016 SUMMIT PETROLEUM INC Brine 540 365
2017 SUMMIT PETROLEUM INC Brine 248 365
2018 SUMMIT PETROLEUM INC Brine 228 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0655523157 2010-07-20 Drill / Deepen / Reopen No Violations The drilling pits were solidified on 7/19 and will be covered today. No violations at this time.
1066113449 2010-07-06 Drill / Deepen / Reopen No Violations Palmer & Son Excavating is building the drilling location. The rig should arrive on or about 7/08 and the pits will not be dug until the rig is on location. The permit is posted as required.
1095293954 2010-08-24 Urban Drill / Deepen / Reopen No Violations The tank battery is being built and the affected area around the wellhead has been graded, seeded and mulched. No violations at this time.
1324221372 2010-07-13 Drill / Deepen / Reopen No Violations Poulson Drilling is drilling ahead with salt water. They should TD the well sometime tonight and will be ready to run production casing in the morning.
1352448309 2011-01-27 UrbanProduction Wells No Violations The well has been completed and placed in production. The required security fence has been installed along with the required identification. Preliminary restoration is due this spring.
1969532389 2011-06-14 Preliminary Restoration No Violations The affected areas have been graded, seeded and are growing. The security fence, containment dike and well identification are in place and the well is in production. Preliminary restoration is approved.

For data sources see[9]

References