X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-003-20042"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-003-20042
 
| Well ID: 37-003-20042
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.397905, -80.210356 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.397905, -80.210356 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: J B HERRON 11
 
| Farm/Lease Name: J B HERRON 11
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 1800-01-01
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date:  
 
| Permit Date:  
 +
|-
 +
| Well Type: OIL
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.397905
 
| Latitude: 40.397905
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 1961-01-01
 +
| NEWLY DRILLED
 +
|-
 +
| 1961-08-02
 +
| Performed Spud Operation
 +
|-
 +
| 1961-10-02
 +
| Drilling Completion
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 95:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 98: Line 133:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1,288.67
+
| style="text-align: right;" | 1288.67
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 170: Line 205:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1,114.00
+
| style="text-align: right;" | 1114.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 179: Line 214:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1,217.00
+
| style="text-align: right;" | 1217.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 188: Line 223:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1,319.00
+
| style="text-align: right;" | 1319.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 197: Line 232:
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
| style="text-align: right;" | 1,194.33
+
| style="text-align: right;" | 1194.33
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 256: Line 291:
 
| 2011
 
| 2011
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 16.67 Bbl
 
| style="text-align: right;" | 16.67 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 263: Line 298:
 
| 2016
 
| 2016
 
| [[NEW CENTURY ENERGY INC]]
 
| [[NEW CENTURY ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 187.67 Bbl
 
| style="text-align: right;" | 187.67 Bbl
 
| PUBLIC SEWAGE TREATMENT PLANT
 
| PUBLIC SEWAGE TREATMENT PLANT

Latest revision as of 10:37, 20 May 2020

Well Details

Well ID: 37-003-20042
Loading map...
Country: United States
State: Pennsylvania
County: Allegheny
Municipality: North Fayette Township
Operator Name: NEW CENTURY ENERGY INC
Well Pad ID:
Farm/Lease Name: J B HERRON 11
License Status: ACTIVE
Spud Date:
Permit Date:
Well Type: OIL
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.397905
Longitude: -80.210356

For data sources see[1][2][3]

Well History

Date Event
1961-01-01 NEWLY DRILLED
1961-08-02 Performed Spud Operation
1961-10-02 Drilling Completion

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2000 NEW CENTURY ENERGY INC 0.00 0 969.63 365 0.00 0
2001 NEW CENTURY ENERGY INC 0.00 0 1288.67 365 0.00 0
2004 NEW CENTURY ENERGY INC 0.00 0 834.25 365 0.00 0
2005 NEW CENTURY ENERGY INC 0.00 0 0.00 0 0.00 0
2006 NEW CENTURY ENERGY INC 0.00 0 0.00 0 0.00 0
2007 NEW CENTURY ENERGY INC 0.00 0 0.00 0 0.00 0
2008 NEW CENTURY ENERGY INC 0.00 0 655.75 365 0.00 0
2009 NEW CENTURY ENERGY INC 0.00 0 548.75 7 0.00 0
2010 NEW CENTURY ENERGY INC 0.00 0 636.33 365 0.00 0
2011 NEW CENTURY ENERGY INC 0.00 0 1114.00 365 0.00 0
2012 NEW CENTURY ENERGY INC 0.00 0 1217.00 365 0.00 0
2013 NEW CENTURY ENERGY INC 0.00 0 1319.00 7 0.00 0
2014 NEW CENTURY ENERGY INC 0.00 0 1194.33 365 0.00 0
2015 NEW CENTURY ENERGY INC 0.00 0 901.67 365 0.00 0
2016 NEW CENTURY ENERGY INC 0.00 0 958.00 365 0.00 0
2017 NEW CENTURY ENERGY INC 0.00 0 782.00 365 0.00 0
2018 NEW CENTURY ENERGY INC 0.00 0 831.57 365 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 NEW CENTURY ENERGY INC Produced Fluid 16.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE P2-0116
2016 NEW CENTURY ENERGY INC Produced Fluid 187.67 Bbl PUBLIC SEWAGE TREATMENT PLANT PA0025984

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
208816 Primary Facility 1987-10-28 Routine/Complete Inspection No Violations Noted COMMUNITY TANK
2509407 Primary Facility 2016-06-10 Routine/Partial Inspection No Adverse Event or Action Reported Visited well with operator to GPS location. Well equipped w/ pumpjack, is active & well-maintained.

For data sources see[7]

References