X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-085-23860"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-085-23860
 
| Well ID: 37-085-23860
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.363087, -80.266746 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.363087, -80.266746 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: FRIEDE J 3
 
| Farm/Lease Name: FRIEDE J 3
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2005-12-03
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2005-07-18
 
| Permit Date: 2005-07-18
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.363087
 
| Latitude: 41.363087
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2005-07-18
 +
| New Permit Application
 +
|-
 +
| 2005-12-03
 +
| Performed Spud Operation
 +
|-
 +
| 2005-12-07
 +
| Drilling Completion
 +
|-
 +
| 2006-04-19
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 87: Line 125:
 
| 2005
 
| 2005
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 475.00
+
| style="text-align: right;" | 475
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 96: Line 134:
 
| 2006
 
| 2006
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 8,525.00
+
| style="text-align: right;" | 8525.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 105: Line 143:
 
| 2007
 
| 2007
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 4,368.00
+
| style="text-align: right;" | 4368.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 114: Line 152:
 
| 2008
 
| 2008
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 2,972.00
+
| style="text-align: right;" | 2972.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 123: Line 161:
 
| 2009
 
| 2009
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| style="text-align: right;" | 2,188.00
+
| style="text-align: right;" | 2188.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 197: Line 235:
 
| style="text-align: right;" | 526.00
 
| style="text-align: right;" | 526.00
 
| style="text-align: right;" | 304
 
| style="text-align: right;" | 304
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[DIAMOND ENERGY PARTNERS LLC]]
 +
| style="text-align: right;" | 997.00
 +
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 241: Line 288:
 
| 2010
 
| 2010
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 100.00 Bbl
 
| style="text-align: right;" | 100.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 248: Line 295:
 
| 2011
 
| 2011
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 80.00 Bbl
 
| style="text-align: right;" | 80.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 255: Line 302:
 
| 2013
 
| 2013
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2013
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 25 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 65.00 Bbl
 
| style="text-align: right;" | 65.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0101508
 +
|-
 +
| 2014
 +
| [[VISTA OPR INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 65 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0101508
 
| PA0101508
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[VISTA OPR INC]]
 
| [[VISTA OPR INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 69.00 Bbl
 
| style="text-align: right;" | 69.00 Bbl
 
| ROAD SPREADING
 
| ROAD SPREADING

Latest revision as of 09:35, 15 May 2020

Well Details

Well ID: 37-085-23860
Loading map...
Country: United States
State: Pennsylvania
County: Mercer
Municipality: Delaware Township
Operator Name: DIAMOND ENERGY PARTNERS LLC
Well Pad ID:
Farm/Lease Name: FRIEDE J 3
License Status: ACTIVE
Spud Date:
Permit Date: 2005-07-18
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.363087
Longitude: -80.266746

For data sources see[1][2][3]

Well History

Date Event
2005-07-18 New Permit Application
2005-12-03 Performed Spud Operation
2005-12-07 Drilling Completion
2006-04-19 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2005 VISTA OPR INC 475 365 0.00 0 0.00 0
2006 VISTA OPR INC 8525.00 365 0.00 0 0.00 0
2007 VISTA OPR INC 4368.00 365 0.00 0 0.00 0
2008 VISTA OPR INC 2972.00 365 0.00 0 0.00 0
2009 VISTA OPR INC 2188.00 365 0.00 0 0.00 0
2010 VISTA OPR INC 1,801.00 365 0.00 0 0.00 0
2011 VISTA OPR INC 1,523.00 365 0.00 0 0.00 0
2012 VISTA OPR INC 1,706.00 365 0.00 0 0.00 0
2013 VISTA OPR INC 1,194.00 365 0.00 0 0.00 0
2014 VISTA OPR INC 1,238.00 365 0.00 0 0.00 0
2015 VISTA OPR INC 1,198.00 365 0.00 0 0.00 0
2016 VISTA OPR INC 681.00 365 0.00 0 0.00 0
2017 VISTA OPR INC 526.00 304 0.00 0 0.00 0
2019 DIAMOND ENERGY PARTNERS LLC 997.00 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2006 VISTA OPR INC Brine 390.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2008 VISTA OPR INC Brine 165.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2009 VISTA OPR INC Brine 125.00 Bbl Brine or Industrial Waste Treatment Plt PA0101508
2010 VISTA OPR INC Produced Fluid 100.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2011 VISTA OPR INC Produced Fluid 80.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2013 VISTA OPR INC Produced Fluid 25.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2013 VISTA OPR INC Produced Fluid 25 Bbl CENT WASTE TRT FAC NPDES PA0101508
2014 VISTA OPR INC Produced Fluid 65.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0101508
2014 VISTA OPR INC Produced Fluid 65 Bbl CENT WASTE TRT FAC NPDES PA0101508
2016 VISTA OPR INC Produced Fluid 69.00 Bbl ROAD SPREADING

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2485668 Primary Facility 2016-05-09 Routine/Partial Inspection No Violations Noted
2763600 Primary Facility 2018-08-14 Routine/Complete Inspection No Violations Noted Routine inspection of producing conventional gas well with rabbit. Shared tank battery with Friede 2 well. Two separators, one 100 bbl steel tank, and one 50 bbl steel tank. Well is still under Vista Opr. Inc. Transfer to Diamond Energy Partners is not complete.

For data sources see[7]

References