If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 37-085-24630 | | Well ID: 37-085-24630 | ||
− | | style="height=100%; align=center" rowspan=" | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 41.321583, -80.183558 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 19: | Line 19: | ||
| Farm/Lease Name: COBLENTZ A 1 | | Farm/Lease Name: COBLENTZ A 1 | ||
|- | |- | ||
− | | License Status: | + | | License Status: |
|- | |- | ||
− | | Spud Date: | + | | Spud Date: |
|- | |- | ||
| Permit Date: 2012-03-05 | | Permit Date: 2012-03-05 | ||
+ | |- | ||
+ | | Well Type: GAS | ||
|- | |- | ||
| Unconventional Well: N | | Unconventional Well: N | ||
|- | |- | ||
| Configuration: Vertical Well | | Configuration: Vertical Well | ||
+ | |- | ||
+ | | Conservation: Yes | ||
|- | |- | ||
| Latitude: 41.321583 | | Latitude: 41.321583 | ||
Line 49: | Line 53: | ||
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
| accessdate = 2019-05-21 }}</ref> | | accessdate = 2019-05-21 }}</ref> | ||
+ | == Well History == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Date | ||
+ | !scope="col" | Event | ||
+ | |- | ||
+ | | 2012-03-05 | ||
+ | | New Permit Application | ||
+ | |- | ||
+ | | 2012-03-20 | ||
+ | | Performed Spud Operation | ||
+ | |- | ||
+ | | 2012-03-27 | ||
+ | | Drilling Completion | ||
+ | |- | ||
+ | | 2012-04-04 | ||
+ | | Perforation | ||
+ | |- | ||
+ | | 2012-06-15 | ||
+ | | NEWLY DRILLED | ||
+ | |- | ||
+ | |} | ||
+ | For data sources see<ref>{{cite web | ||
+ | | title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources | ||
+ | | date = 2020-02-27 | ||
+ | | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources | ||
+ | | accessdate = 2020-02-27 }}</ref> | ||
<!--== Fracking Activities == | <!--== Fracking Activities == | ||
==== Fracking Jobs ==== | ==== Fracking Jobs ==== | ||
Line 71: | Line 101: | ||
!scope="col" | Job Percentage by Mass | !scope="col" | Job Percentage by Mass | ||
!scope="col" | Mass Used (lb) | !scope="col" | Mass Used (lb) | ||
+ | |- | ||
+ | |}--> | ||
+ | |||
+ | <!--== Stimulation Data == | ||
+ | {| class="wikitable sortable" width="95%" | ||
+ | !scope="col" | Stimulation Date | ||
+ | !scope="col" | Phase Number | ||
+ | !scope="col" | Chemical Agent | ||
+ | !scope="col" | Volume (gal) | ||
+ | !scope="col" | Treating Pressure (psi) | ||
+ | !scope="col" | Breakdown Pressure (psi) | ||
|- | |- | ||
|}--> | |}--> | ||
Line 142: | Line 183: | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
| style="text-align: right;" | 5,083.00 | | style="text-align: right;" | 5,083.00 | ||
+ | | style="text-align: right;" | 365 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | | style="text-align: right;" | 0.00 | ||
+ | | style="text-align: right;" | 0 | ||
+ | |- | ||
+ | | 2019 | ||
+ | | [[VISTA OPR INC]] | ||
+ | | style="text-align: right;" | 4,743.00 | ||
| style="text-align: right;" | 365 | | style="text-align: right;" | 365 | ||
| style="text-align: right;" | 0.00 | | style="text-align: right;" | 0.00 | ||
Line 166: | Line 216: | ||
| 2012 | | 2012 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Drilling Fluid Waste | + | | Drilling Fluid Waste |
| style="text-align: right;" | 4,220.00 Bbl | | style="text-align: right;" | 4,220.00 Bbl | ||
| CENTRALIZED TREATMENT PLANT FOR RECYCLE | | CENTRALIZED TREATMENT PLANT FOR RECYCLE | ||
Line 173: | Line 223: | ||
| 2016 | | 2016 | ||
| [[VISTA OPR INC]] | | [[VISTA OPR INC]] | ||
− | | Produced Fluid | + | | Produced Fluid |
| style="text-align: right;" | 52.00 Bbl | | style="text-align: right;" | 52.00 Bbl | ||
| ROAD SPREADING | | ROAD SPREADING |
Well ID: 37-085-24630 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.321583,"lon":-80.183558,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Mercer | |
Municipality: Fairview Township | |
Operator Name: VISTA OPR INC | |
Well Pad ID: | |
Farm/Lease Name: COBLENTZ A 1 | |
License Status: | |
Spud Date: | |
Permit Date: 2012-03-05 | |
Well Type: GAS | |
Unconventional Well: N | |
Configuration: Vertical Well | |
Conservation: Yes | |
Latitude: 41.321583 | |
Longitude: -80.183558 |
Date | Event |
---|---|
2012-03-05 | New Permit Application |
2012-03-20 | Performed Spud Operation |
2012-03-27 | Drilling Completion |
2012-04-04 | Perforation |
2012-06-15 | NEWLY DRILLED |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2012 | VISTA OPR INC | 10,722.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2013 | VISTA OPR INC | 13,176.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2014 | VISTA OPR INC | 8,000.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2015 | VISTA OPR INC | 6,225.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2016 | VISTA OPR INC | 514.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2017 | VISTA OPR INC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2018 | VISTA OPR INC | 5,083.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | VISTA OPR INC | 4,743.00 | 365 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Operator | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|---|
2012 | VISTA OPR INC | Drilling Fluid Waste | 4,220.00 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | PA0101508 |
2016 | VISTA OPR INC | Produced Fluid | 52.00 Bbl | ROAD SPREADING |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2051649 | Primary Facility | 2012-03-16 | Routine/Complete Inspection | No Violations Noted | |
2054227 | Primary Facility | 2012-03-21 | Drilling/Alteration | No Violations Noted | |
2054278 | Primary Facility | 2012-03-23 | Drilling/Alteration | No Violations Noted | |
2056156 | Primary Facility | 2012-04-02 | Routine/Complete Inspection | No Violations Noted | |
2057496 | Primary Facility | 2012-04-04 | Drilling/Alteration | Violation(s) Noted | |
2057580 | Primary Facility | 2012-04-05 | Compliance Evaluation | Outstanding Violations - No Viols Req'd | |
2057584 | Primary Facility | 2012-04-09 | Routine/Complete Inspection | No Violations Noted | |
2059700 | Primary Facility | 2012-04-12 | Compliance Evaluation | No Violations Noted | |
2071106 | Primary Facility | 2012-05-25 | Routine/Complete Inspection | No Violations Noted | |
2092115 | Primary Facility | 2012-08-06 | Routine/Complete Inspection | No Violations Noted | |
2099002 | Primary Facility | 2012-09-11 | Routine/Complete Inspection | No Violations Noted | |
2106810 | Primary Facility | 2012-09-20 | Routine/Complete Inspection | Violation(s) Noted | |
2185127 | Primary Facility | 2013-07-19 | Compliance Evaluation | No Violations Noted | |
2287295 | Primary Facility | 2014-07-15 | Compliance Evaluation | No Violations Noted | |
2658457 | Primary Facility | 2017-11-08 | Routine/Partial Inspection | No Violations Noted | Annual production report 2016 states 514 Mcf of gas production. Weekly chart shows production. Surface casing open to tank. Production casing open to domestic gas meter. Tubing open to sales. Fence around well in field. API not posted in well but is on tank nearby. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2057496 | 636359 | 04/04/2012 | 2012-04-04 | 78.56(2) - Failure to maintain 2 ' of freeboard in an impoundment. | Administrative | |
2106810 | 651142 | 09/20/2012 | 2012-09-20 | SWMA301 - Failure to properly store, transport, process or dispose of a residual waste. | Environmental Health & Safety | |
2106810 | 651143 | 09/20/2012 | 2012-09-20 | 78.62 - Improper encapsulation of waste | Administrative |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
636359 | 282667 | NOV - Notice of Violation | Comply/Closed | 2012-04-12 | |||
651142 | 289687 | NOV - Notice of Violation | Comply/Closed | 2013-07-19 | |||
651143 | 289687 | NOV - Notice of Violation | Comply/Closed | 2013-07-19 |
For data sources see[7]