X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24819"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24819
 
| Well ID: 37-125-24819
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.059153, -80.311422 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.059153, -80.311422 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 2012-12-05
+
| Spud Date: 2013-01-03
 
|-
 
|-
 
| Permit Date: 2012-08-15
 
| Permit Date: 2012-08-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.059153
 
| Latitude: 40.059153
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-08-15
 +
| New Permit Application
 +
|-
 +
| 2012-12-05
 +
| Performed Spud Operation
 +
|-
 +
| 2013-04-11
 +
| Drilling Completion
 +
|-
 +
| 2013-06-07
 +
| Drilling Completion
 +
|-
 +
| 2013-10-10
 +
| New Permit Application
 +
|-
 +
| 2014-03-05
 +
| Drilling Completion
 +
|-
 +
| 2014-07-26
 +
| Perforation
 +
|-
 +
| 2014-09-17
 +
| Perforation
 +
|-
 +
| 2014-09-17
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2014-09-17
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2014-09-18
 +
| Perforation
 +
|-
 +
| 2014-09-18
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2014-09-18
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2014-09-18
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2014-09-19
 +
| Perforation
 +
|-
 +
| 2014-09-19
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2014-09-19
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2014-09-19
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2014-09-20
 +
| Perforation
 +
|-
 +
| 2014-09-20
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2014-09-20
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2014-09-21
 +
| Perforation
 +
|-
 +
| 2014-09-21
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2014-09-21
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2014-09-21
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2014-09-21
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2014-09-22
 +
| Perforation
 +
|-
 +
| 2014-09-22
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2014-09-23
 +
| Perforation
 +
|-
 +
| 2014-09-23
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2014-09-23
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2014-09-23
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2014-09-23
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2014-09-24
 +
| Perforation
 +
|-
 +
| 2014-09-24
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2014-09-24
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2014-09-24
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2014-09-24
 +
| Performed Stage 23 of Stimulation
 +
|-
 +
| 2014-09-25
 +
| Perforation
 +
|-
 +
| 2014-09-25
 +
| Performed Stage 24 of Stimulation
 +
|-
 +
| 2014-09-25
 +
| Performed Stage 25 of Stimulation
 +
|-
 +
| 2014-09-25
 +
| Performed Stage 26 of Stimulation
 +
|-
 +
| 2014-09-26
 +
| Perforation
 +
|-
 +
| 2014-09-26
 +
| Performed Stage 27 of Stimulation
 +
|-
 +
| 2014-09-26
 +
| Performed Stage 28 of Stimulation
 +
|-
 +
| 2014-09-26
 +
| Performed Stage 29 of Stimulation
 +
|-
 +
| 2014-09-27
 +
| Perforation
 +
|-
 +
| 2014-09-27
 +
| Performed Stage 30 of Stimulation
 +
|-
 +
| 2014-09-27
 +
| Performed Stage 31 of Stimulation
 +
|-
 +
| 2014-09-27
 +
| Performed Stage 32 of Stimulation
 +
|-
 +
| 2014-09-27
 +
| Performed Stage 33 of Stimulation
 +
|-
 +
| 2014-09-28
 +
| Perforation
 +
|-
 +
| 2014-09-28
 +
| Performed Stage 34 of Stimulation
 +
|-
 +
| 2014-09-28
 +
| Performed Stage 35 of Stimulation
 +
|-
 +
| 2014-09-28
 +
| Performed Stage 36 of Stimulation
 +
|-
 +
| 2014-09-29
 +
| Performed Stage 37 of Stimulation
 +
|-
 +
| 2014-10-02
 +
| Perforation
 +
|-
 +
| 2014-10-03
 +
| Perforation
 +
|-
 +
| 2014-10-03
 +
| Performed Stage 38 of Stimulation
 +
|-
 +
| 2014-10-03
 +
| Performed Stage 39 of Stimulation
 +
|-
 +
| 2014-10-03
 +
| Performed Stage 40 of Stimulation
 +
|-
 +
| 2014-10-03
 +
| Performed Stage 41 of Stimulation
 +
|-
 +
| 2014-10-04
 +
| Perforation
 +
|-
 +
| 2014-10-04
 +
| Performed Stage 42 of Stimulation
 +
|-
 +
| 2014-10-04
 +
| Performed Stage 43 of Stimulation
 +
|-
 +
| 2016-05-17
 +
| Deviated
 +
|-
 +
| 2016-05-17
 +
| Drilled Deeper
 +
|-
 +
| 2016-05-17
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 281:
 
| 2014-09-17
 
| 2014-09-17
 
| 2014-10-04
 
| 2014-10-04
| style="text-align: right;" | 7287
+
| style="text-align: right;" | 7,287
| style="text-align: right;" | 9,999,880.0
+
| style="text-align: right;" | 9,999,880
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 281: Line 500:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2014-09-17
 +
| style="text-align: right;" | 1
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,350
 +
| style="text-align: right;" | 8,723
 +
|-
 +
| 2014-09-17
 +
| style="text-align: right;" | 2
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,837
 +
| style="text-align: right;" | 8,837
 +
|-
 +
| 2014-09-18
 +
| style="text-align: right;" | 3
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,426
 +
| style="text-align: right;" | 8,804
 +
|-
 +
| 2014-09-18
 +
| style="text-align: right;" | 4
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,467
 +
| style="text-align: right;" | 8,712
 +
|-
 +
| 2014-09-18
 +
| style="text-align: right;" | 5
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,365
 +
| style="text-align: right;" | 8,953
 +
|-
 +
| 2014-09-19
 +
| style="text-align: right;" | 6
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,399
 +
| style="text-align: right;" | 8,650
 +
|-
 +
| 2014-09-19
 +
| style="text-align: right;" | 7
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,534
 +
| style="text-align: right;" | 8,875
 +
|-
 +
| 2014-09-19
 +
| style="text-align: right;" | 8
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,283
 +
| style="text-align: right;" | 8,727
 +
|-
 +
| 2014-09-20
 +
| style="text-align: right;" | 9
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,323
 +
| style="text-align: right;" | 8,530
 +
|-
 +
| 2014-09-20
 +
| style="text-align: right;" | 10
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,457
 +
| style="text-align: right;" | 8,724
 +
|-
 +
| 2014-09-21
 +
| style="text-align: right;" | 11
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,314
 +
| style="text-align: right;" | 9,623
 +
|-
 +
| 2014-09-21
 +
| style="text-align: right;" | 12
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,456
 +
| style="text-align: right;" | 8,920
 +
|-
 +
| 2014-09-21
 +
| style="text-align: right;" | 13
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,403
 +
| style="text-align: right;" | 8,743
 +
|-
 +
| 2014-09-21
 +
| style="text-align: right;" | 14
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,271
 +
| style="text-align: right;" | 8,524
 +
|-
 +
| 2014-09-22
 +
| style="text-align: right;" | 15
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,383
 +
| style="text-align: right;" | 8,753
 +
|-
 +
| 2014-09-23
 +
| style="text-align: right;" | 16
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,473
 +
| style="text-align: right;" | 8,872
 +
|-
 +
| 2014-09-23
 +
| style="text-align: right;" | 17
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,429
 +
| style="text-align: right;" | 8,836
 +
|-
 +
| 2014-09-23
 +
| style="text-align: right;" | 18
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,297
 +
| style="text-align: right;" | 8,859
 +
|-
 +
| 2014-09-23
 +
| style="text-align: right;" | 19
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,456
 +
| style="text-align: right;" | 8,836
 +
|-
 +
| 2014-09-24
 +
| style="text-align: right;" | 20
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,405
 +
| style="text-align: right;" | 8,645
 +
|-
 +
| 2014-09-24
 +
| style="text-align: right;" | 21
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,293
 +
| style="text-align: right;" | 8,628
 +
|-
 +
| 2014-09-24
 +
| style="text-align: right;" | 22
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,390
 +
| style="text-align: right;" | 8,937
 +
|-
 +
| 2014-09-24
 +
| style="text-align: right;" | 23
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,371
 +
| style="text-align: right;" | 8,575
 +
|-
 +
| 2014-09-25
 +
| style="text-align: right;" | 24
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,462
 +
| style="text-align: right;" | 8,915
 +
|-
 +
| 2014-09-25
 +
| style="text-align: right;" | 25
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,361
 +
| style="text-align: right;" | 9,137
 +
|-
 +
| 2014-09-25
 +
| style="text-align: right;" | 26
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,213
 +
| style="text-align: right;" | 8,857
 +
|-
 +
| 2014-09-26
 +
| style="text-align: right;" | 27
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,422
 +
| style="text-align: right;" | 8,944
 +
|-
 +
| 2014-09-26
 +
| style="text-align: right;" | 28
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,318
 +
| style="text-align: right;" | 8,578
 +
|-
 +
| 2014-09-26
 +
| style="text-align: right;" | 29
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,257
 +
| style="text-align: right;" | 8,784
 +
|-
 +
| 2014-09-27
 +
| style="text-align: right;" | 30
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,380
 +
| style="text-align: right;" | 8,881
 +
|-
 +
| 2014-09-27
 +
| style="text-align: right;" | 31
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,289
 +
| style="text-align: right;" | 8,824
 +
|-
 +
| 2014-09-27
 +
| style="text-align: right;" | 32
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,281
 +
| style="text-align: right;" | 8,704
 +
|-
 +
| 2014-09-27
 +
| style="text-align: right;" | 33
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 7,996
 +
| style="text-align: right;" | 8,956
 +
|-
 +
| 2014-09-28
 +
| style="text-align: right;" | 34
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,228
 +
| style="text-align: right;" | 8,770
 +
|-
 +
| 2014-09-28
 +
| style="text-align: right;" | 35
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,173
 +
| style="text-align: right;" | 8,525
 +
|-
 +
| 2014-09-28
 +
| style="text-align: right;" | 36
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,274
 +
| style="text-align: right;" | 8,734
 +
|-
 +
| 2014-09-29
 +
| style="text-align: right;" | 37
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,185
 +
| style="text-align: right;" | 9,523
 +
|-
 +
| 2014-10-03
 +
| style="text-align: right;" | 38
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,116
 +
| style="text-align: right;" | 8,828
 +
|-
 +
| 2014-10-03
 +
| style="text-align: right;" | 39
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,317
 +
| style="text-align: right;" | 8,766
 +
|-
 +
| 2014-10-03
 +
| style="text-align: right;" | 40
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,279
 +
| style="text-align: right;" | 8,724
 +
|-
 +
| 2014-10-03
 +
| style="text-align: right;" | 41
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,090
 +
| style="text-align: right;" | 8,667
 +
|-
 +
| 2014-10-04
 +
| style="text-align: right;" | 42
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 8,990
 +
| style="text-align: right;" | 8,736
 +
|-
 +
| 2014-10-04
 +
| style="text-align: right;" | 43
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 4,442,725
 +
| style="text-align: right;" | 7,830
 +
| style="text-align: right;" | 8,647
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 357: Line 893:
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| style="text-align: right;" | 185,769.00
+
| style="text-align: right;" | 1,128,606.00
| style="text-align: right;" | 59
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 382: Line 918:
 
| 2013
 
| 2013
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 42.26 Tons
 
| style="text-align: right;" | 42.26 Tons
 
| LANDFILL
 
| LANDFILL
Line 389: Line 925:
 
| 2013
 
| 2013
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drilling Fluid Waste
 +
| style="text-align: right;" | 43.89 Bbl
 +
| LANDFILL
 +
| 301071
 +
|-
 +
| 2013
 +
| [[CNX GAS CO LLC]]
 +
| Drill Cuttings
 
| style="text-align: right;" | 675.78 Tons
 
| style="text-align: right;" | 675.78 Tons
 
| LANDFILL
 
| LANDFILL
 
| PAD059087072
 
| PAD059087072
 
|-
 
|-
| 2013
+
| 2014
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drilling Fluid Waste (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 43.89 Bbl
+
| style="text-align: right;" | 180.02 Tons
 
| LANDFILL
 
| LANDFILL
| 301071
+
| PAD059087072
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drilling Fluid Waste
| style="text-align: right;" | 391.77 Tons
+
| style="text-align: right;" | 0.15 Bbl
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| 301071
 
| 301071
Line 410: Line 953:
 
| 2014
 
| 2014
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 2,719.00 Bbl
 
| style="text-align: right;" | 2,719.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 417: Line 960:
 
| 2014
 
| 2014
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
| style="text-align: right;" | 180.02 Tons
+
| style="text-align: right;" | 391.77 Tons
| LANDFILL
 
| PAD059087072
 
|-
 
| 2014
 
| [[CNX GAS CO LLC]]
 
| Drilling Fluid Waste (in Barrels)
 
| style="text-align: right;" | 0.15 Bbl
 
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| RESIDUAL WASTE TRANSFER FACILITY
 
| 301071
 
| 301071
Line 431: Line 967:
 
| 2015
 
| 2015
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Fracturing Fluid Waste (in Tons)
+
| Fracturing Fluid Waste
 
| style="text-align: right;" | 46.06 Tons
 
| style="text-align: right;" | 46.06 Tons
 
| LANDFILL
 
| LANDFILL
Line 438: Line 974:
 
| 2015
 
| 2015
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 13,512.14 Bbl
 
| style="text-align: right;" | 13,512.14 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 445: Line 981:
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 301.50 Bbl
+
| style="text-align: right;" | 83.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-013-20609
+
| 34-119-28780
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 8,754.49 Bbl
+
| style="text-align: right;" | 684.24 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| INJECTION DISPOSAL WELL
|  
+
| 34-119-28803
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 684.24 Bbl
+
| style="text-align: right;" | 301.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-119-28803
+
| 34-013-20609
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 83.70 Bbl
+
| style="text-align: right;" | 8,754.49 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28780
+
|  
 
|-
 
|-
 
| 2017
 
| 2017
| [[HG ENERGY II APPALACHIA LLC]]
+
| [[NOBLE ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 6,206.73 Bbl
 
| style="text-align: right;" | 6,206.73 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
Line 480: Line 1,016:
 
| 2017
 
| 2017
 
| [[NOBLE ENERGY INC]]
 
| [[NOBLE ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 1,262.63 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2017
 +
| [[NOBLE ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 2,147.00 Bbl
 
| style="text-align: right;" | 2,147.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 487: Line 1,030:
 
| 2018
 
| 2018
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 6,415.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28803
 +
|-
 +
| 2018
 +
| [[HG ENERGY II APPALACHIA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 9,049.00 Bbl
 
| style="text-align: right;" | 9,049.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
|  
 
|  
 
|-
 
|-
| 2018
+
| 2019
 +
| [[HG ENERGY II APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,149.00 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[HG ENERGY II APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 558.00 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 +
|-
 +
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 6,415.00 Bbl
+
| style="text-align: right;" | 544.00 Bbl
| INJECTION DISPOSAL WELL
+
| SURFACE IMPOUNDMENT
| 34-119-28803
+
| 95-7-37312-17
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 2,217.00 Bbl
+
| style="text-align: right;" | 5,352.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-119-28803
 
| 34-119-28803
Line 508: Line 1,072:
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,910.00 Bbl
 
| style="text-align: right;" | 1,910.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

Latest revision as of 11:28, 15 May 2020

Well Details

Well ID: 37-125-24819
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Morris Township
Operator Name: HG ENERGY II APPALACHIA LLC
Well Pad ID: 148725
Farm/Lease Name: LAMPERSKI NV58DHS
License Status: Active
Spud Date: 2013-01-03
Permit Date: 2012-08-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.059153
Longitude: -80.311422

For data sources see[1][2][3]

Well History

Date Event
2012-08-15 New Permit Application
2012-12-05 Performed Spud Operation
2013-04-11 Drilling Completion
2013-06-07 Drilling Completion
2013-10-10 New Permit Application
2014-03-05 Drilling Completion
2014-07-26 Perforation
2014-09-17 Perforation
2014-09-17 Performed Stage 1 of Stimulation
2014-09-17 Performed Stage 2 of Stimulation
2014-09-18 Perforation
2014-09-18 Performed Stage 3 of Stimulation
2014-09-18 Performed Stage 4 of Stimulation
2014-09-18 Performed Stage 5 of Stimulation
2014-09-19 Perforation
2014-09-19 Performed Stage 6 of Stimulation
2014-09-19 Performed Stage 7 of Stimulation
2014-09-19 Performed Stage 8 of Stimulation
2014-09-20 Perforation
2014-09-20 Performed Stage 10 of Stimulation
2014-09-20 Performed Stage 9 of Stimulation
2014-09-21 Perforation
2014-09-21 Performed Stage 11 of Stimulation
2014-09-21 Performed Stage 12 of Stimulation
2014-09-21 Performed Stage 13 of Stimulation
2014-09-21 Performed Stage 14 of Stimulation
2014-09-22 Perforation
2014-09-22 Performed Stage 15 of Stimulation
2014-09-23 Perforation
2014-09-23 Performed Stage 16 of Stimulation
2014-09-23 Performed Stage 17 of Stimulation
2014-09-23 Performed Stage 18 of Stimulation
2014-09-23 Performed Stage 19 of Stimulation
2014-09-24 Perforation
2014-09-24 Performed Stage 20 of Stimulation
2014-09-24 Performed Stage 21 of Stimulation
2014-09-24 Performed Stage 22 of Stimulation
2014-09-24 Performed Stage 23 of Stimulation
2014-09-25 Perforation
2014-09-25 Performed Stage 24 of Stimulation
2014-09-25 Performed Stage 25 of Stimulation
2014-09-25 Performed Stage 26 of Stimulation
2014-09-26 Perforation
2014-09-26 Performed Stage 27 of Stimulation
2014-09-26 Performed Stage 28 of Stimulation
2014-09-26 Performed Stage 29 of Stimulation
2014-09-27 Perforation
2014-09-27 Performed Stage 30 of Stimulation
2014-09-27 Performed Stage 31 of Stimulation
2014-09-27 Performed Stage 32 of Stimulation
2014-09-27 Performed Stage 33 of Stimulation
2014-09-28 Perforation
2014-09-28 Performed Stage 34 of Stimulation
2014-09-28 Performed Stage 35 of Stimulation
2014-09-28 Performed Stage 36 of Stimulation
2014-09-29 Performed Stage 37 of Stimulation
2014-10-02 Perforation
2014-10-03 Perforation
2014-10-03 Performed Stage 38 of Stimulation
2014-10-03 Performed Stage 39 of Stimulation
2014-10-03 Performed Stage 40 of Stimulation
2014-10-03 Performed Stage 41 of Stimulation
2014-10-04 Perforation
2014-10-04 Performed Stage 42 of Stimulation
2014-10-04 Performed Stage 43 of Stimulation
2016-05-17 Deviated
2016-05-17 Drilled Deeper
2016-05-17 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-09-17 2014-10-04 7,287 9,999,880 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1
Sand (Proppant), DAP-903, DWP-111,
DWP-614, DWP-901, BioClear
2000, DWP-NE1, Spearhead Acid
CWS Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Breaker, Biocide, Non-Emulsifier, Clean Perforations Crystalline silica (Quartz) 14808-60-7 100 10.4146 9,773,350.0
Propargyl Alcohol 107-19-7 0.1 0.0006 558.48
Illite 12173-60-3 1 0.00867 8137.68
Distillates (petroleum), hydrotreated middle 64742-46-7 60 0.0334 31339.5
Calcite 471-34-1 1 0.01523 14292.3
Alkenes, C>10 a- 64743-02-8 0.1 0.00179 1675.43
Sorbitan monooleate 1338-43-8 5 0.00553 5187.21
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01246 11696.4
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.04422 41497.7
Sodium chloride 7647-14-5 0.1 0.00006000 55.85
Formaldehyde 50-00-0 0.1 0.00012 111.7
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.00624 5856.93
Ammonium Persulfate 7727-54-0 100 0.00001000 10
Modified thiourea polymer 68527-49-1 0.1 0.00179 1675.43
Polyethylene glycol mixture 25322-68-3 70 0.01246 11696.4
Isopropanol 67-63-0 40 0.01528 14336.5
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.00179 1675.43
Guar gum 9000-30-0 60 0.00023 216.24
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether 37251-67-5 1.5 0.00001000 5.41
Quaternary ammonium compounds,
bis(hydrogenated tallow alkyl)dimethyl,
salts with bentonite
68953-58-2 5 0.00002000 18.02
Ilmenite 98072-94-7 0.1 0.00321 3013.95
Diallyldimethylammonium chloride 7398-69-8 5 0.00191 1792.06
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.01528 14336.5
Goethite 1310-14-1 0.1 0.00539 5055.71
Fatty acids, tall-oil 61790-12-3 0.1 0.00179 1675.43
Methanol 67-56-1 15 0.0093 8727.03
Apatite 64476-38-6 0.1 0.00394 3694.54
Biotite 1302-27-8 0.1 0.00394 3694.54
Hydrochloric acid 7647-01-0 37 0.42033 394452
Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.00553 5187.21
Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 88.9549 83,477,600.0

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-09-17 1 OTTAWA SAND 4,442,725 8,350 8,723
2014-09-17 2 OTTAWA SAND 4,442,725 8,837 8,837
2014-09-18 3 OTTAWA SAND 4,442,725 8,426 8,804
2014-09-18 4 OTTAWA SAND 4,442,725 8,467 8,712
2014-09-18 5 OTTAWA SAND 4,442,725 8,365 8,953
2014-09-19 6 OTTAWA SAND 4,442,725 8,399 8,650
2014-09-19 7 OTTAWA SAND 4,442,725 8,534 8,875
2014-09-19 8 OTTAWA SAND 4,442,725 8,283 8,727
2014-09-20 9 OTTAWA SAND 4,442,725 8,323 8,530
2014-09-20 10 OTTAWA SAND 4,442,725 8,457 8,724
2014-09-21 11 OTTAWA SAND 4,442,725 8,314 9,623
2014-09-21 12 OTTAWA SAND 4,442,725 8,456 8,920
2014-09-21 13 OTTAWA SAND 4,442,725 8,403 8,743
2014-09-21 14 OTTAWA SAND 4,442,725 8,271 8,524
2014-09-22 15 OTTAWA SAND 4,442,725 8,383 8,753
2014-09-23 16 OTTAWA SAND 4,442,725 8,473 8,872
2014-09-23 17 OTTAWA SAND 4,442,725 8,429 8,836
2014-09-23 18 OTTAWA SAND 4,442,725 8,297 8,859
2014-09-23 19 OTTAWA SAND 4,442,725 8,456 8,836
2014-09-24 20 OTTAWA SAND 4,442,725 8,405 8,645
2014-09-24 21 OTTAWA SAND 4,442,725 8,293 8,628
2014-09-24 22 OTTAWA SAND 4,442,725 8,390 8,937
2014-09-24 23 OTTAWA SAND 4,442,725 8,371 8,575
2014-09-25 24 OTTAWA SAND 4,442,725 8,462 8,915
2014-09-25 25 OTTAWA SAND 4,442,725 8,361 9,137
2014-09-25 26 OTTAWA SAND 4,442,725 8,213 8,857
2014-09-26 27 OTTAWA SAND 4,442,725 8,422 8,944
2014-09-26 28 OTTAWA SAND 4,442,725 8,318 8,578
2014-09-26 29 OTTAWA SAND 4,442,725 8,257 8,784
2014-09-27 30 OTTAWA SAND 4,442,725 8,380 8,881
2014-09-27 31 OTTAWA SAND 4,442,725 8,289 8,824
2014-09-27 32 OTTAWA SAND 4,442,725 8,281 8,704
2014-09-27 33 OTTAWA SAND 4,442,725 7,996 8,956
2014-09-28 34 OTTAWA SAND 4,442,725 8,228 8,770
2014-09-28 35 OTTAWA SAND 4,442,725 8,173 8,525
2014-09-28 36 OTTAWA SAND 4,442,725 8,274 8,734
2014-09-29 37 OTTAWA SAND 4,442,725 8,185 9,523
2014-10-03 38 OTTAWA SAND 4,442,725 8,116 8,828
2014-10-03 39 OTTAWA SAND 4,442,725 8,317 8,766
2014-10-03 40 OTTAWA SAND 4,442,725 8,279 8,724
2014-10-03 41 OTTAWA SAND 4,442,725 8,090 8,667
2014-10-04 42 OTTAWA SAND 4,442,725 8,990 8,736
2014-10-04 43 OTTAWA SAND 4,442,725 7,830 8,647

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2014 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2015 CNX GAS CO LLC 1,525,692.48 288 0.00 0 0.00 0
2016 NOBLE ENERGY INC 2,102,229.11 366 0.00 0 0.00 0
2017 HG ENERGY II APPALACHIA LLC 1,562,728.37 365 0.00 0 0.00 0
2018 HG ENERGY II APPALACHIA LLC 1,332,753.00 365 0.00 0 0.00 0
2019 HG ENERGY II APPALACHIA LLC 1,128,606.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CNX GAS CO LLC Drill Cuttings 42.26 Tons LANDFILL 100172
2013 CNX GAS CO LLC Drilling Fluid Waste 43.89 Bbl LANDFILL 301071
2013 CNX GAS CO LLC Drill Cuttings 675.78 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drill Cuttings 180.02 Tons LANDFILL PAD059087072
2014 CNX GAS CO LLC Drilling Fluid Waste 0.15 Bbl RESIDUAL WASTE TRANSFER FACILITY 301071
2014 CNX GAS CO LLC Fracing Fluid Waste 2,719.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014 CNX GAS CO LLC Drill Cuttings 391.77 Tons RESIDUAL WASTE TRANSFER FACILITY 301071
2015 CNX GAS CO LLC Fracturing Fluid Waste 46.06 Tons LANDFILL 100172
2015 CNX GAS CO LLC Produced Fluid 13,512.14 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 83.70 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 684.24 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 301.50 Bbl INJECTION DISPOSAL WELL 34-013-20609
2016 CNX GAS CO LLC Produced Fluid 8,754.49 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 6,206.73 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 NOBLE ENERGY INC Produced Fluid 1,262.63 Bbl REUSE OTHER THAN ROAD SPREADING
2017 NOBLE ENERGY INC Produced Fluid 2,147.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 6,415.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 9,049.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,149.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 558.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 544.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-17
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 5,352.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,910.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2129806 Primary Facility 2013-01-09 Drilling/Alteration No Violations Noted
2252022 Primary Facility 2014-02-28 Drilling/Alteration No Violations Noted
2422784 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2483651 Primary Facility 2016-05-05 Incident- Response to Accident or Event In Compliance with Policy On Thursday May 5, 2016, I received notification of a release of brine water at the NV58HS Well Site located in Morris Township, Washington County. The release was discovered and reported on Wednesday May 4, 2016 and was estimated to involve approximately 30 to 35 gallons of brine water from a leaking dump valve in a GPU. The valve was repaired and the GPU and concrete slab were cleaned. The impacted gravel surrounding the concrete slab was excavated until conductivity probe readings identified unaffected material. The excavated material was placed into drums for off-site disposal. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.
2787397 Primary Facility 2018-10-05 Routine/Complete Inspection No Violations Noted On Friday October 5, 2018 I conducted a routine-complete inspection at the NV58 Well Site located in Morris Township, Greene County.

Gas well NV58DHS (125-24819) and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification.

No violations were identified during the inspection.

For data sources see[9]

References