X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-125-24821"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-125-24821
 
| Well ID: 37-125-24821
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.059133, -80.311356 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.059133, -80.311356 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 21: Line 21:
 
| License Status: Active
 
| License Status: Active
 
|-
 
|-
| Spud Date: 2012-12-05
+
| Spud Date: 2013-01-01
 
|-
 
|-
 
| Permit Date: 2012-08-15
 
| Permit Date: 2012-08-15
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.059133
 
| Latitude: 40.059133
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2012-08-15
 +
| New Permit Application
 +
|-
 +
| 2012-12-05
 +
| Performed Spud Operation
 +
|-
 +
| 2013-03-31
 +
| Drilling Completion
 +
|-
 +
| 2013-09-16
 +
| New Permit Application
 +
|-
 +
| 2014-04-10
 +
| Drilling Completion
 +
|-
 +
| 2014-07-23
 +
| Perforation
 +
|-
 +
| 2014-10-04
 +
| Performed Stage 1 of Stimulation
 +
|-
 +
| 2014-10-05
 +
| Perforation
 +
|-
 +
| 2014-10-05
 +
| Performed Stage 2 of Stimulation
 +
|-
 +
| 2014-10-05
 +
| Performed Stage 3 of Stimulation
 +
|-
 +
| 2014-10-05
 +
| Performed Stage 4 of Stimulation
 +
|-
 +
| 2014-10-06
 +
| Perforation
 +
|-
 +
| 2014-10-06
 +
| Performed Stage 5 of Stimulation
 +
|-
 +
| 2014-10-06
 +
| Performed Stage 6 of Stimulation
 +
|-
 +
| 2014-10-06
 +
| Performed Stage 7 of Stimulation
 +
|-
 +
| 2014-10-07
 +
| Perforation
 +
|-
 +
| 2014-10-07
 +
| Performed Stage 8 of Stimulation
 +
|-
 +
| 2014-10-07
 +
| Performed Stage 9 of Stimulation
 +
|-
 +
| 2014-10-08
 +
| Perforation
 +
|-
 +
| 2014-10-08
 +
| Performed Stage 10 of Stimulation
 +
|-
 +
| 2014-10-08
 +
| Performed Stage 11 of Stimulation
 +
|-
 +
| 2014-10-08
 +
| Performed Stage 12 of Stimulation
 +
|-
 +
| 2014-10-08
 +
| Performed Stage 13 of Stimulation
 +
|-
 +
| 2014-10-09
 +
| Perforation
 +
|-
 +
| 2014-10-09
 +
| Performed Stage 14 of Stimulation
 +
|-
 +
| 2014-10-09
 +
| Performed Stage 15 of Stimulation
 +
|-
 +
| 2014-10-09
 +
| Performed Stage 16 of Stimulation
 +
|-
 +
| 2014-10-09
 +
| Performed Stage 17 of Stimulation
 +
|-
 +
| 2014-10-10
 +
| Perforation
 +
|-
 +
| 2014-10-10
 +
| Performed Stage 18 of Stimulation
 +
|-
 +
| 2014-10-10
 +
| Performed Stage 19 of Stimulation
 +
|-
 +
| 2014-10-10
 +
| Performed Stage 20 of Stimulation
 +
|-
 +
| 2014-10-10
 +
| Performed Stage 21 of Stimulation
 +
|-
 +
| 2014-10-11
 +
| Perforation
 +
|-
 +
| 2014-10-11
 +
| Performed Stage 22 of Stimulation
 +
|-
 +
| 2014-10-11
 +
| Performed Stage 23 of Stimulation
 +
|-
 +
| 2014-10-11
 +
| Performed Stage 24 of Stimulation
 +
|-
 +
| 2014-10-11
 +
| Performed Stage 25 of Stimulation
 +
|-
 +
| 2014-10-12
 +
| Perforation
 +
|-
 +
| 2014-10-12
 +
| Performed Stage 26 of Stimulation
 +
|-
 +
| 2014-10-12
 +
| Performed Stage 27 of Stimulation
 +
|-
 +
| 2014-10-12
 +
| Performed Stage 28 of Stimulation
 +
|-
 +
| 2014-10-12
 +
| Performed Stage 29 of Stimulation
 +
|-
 +
| 2014-10-12
 +
| Performed Stage 30 of Stimulation
 +
|-
 +
| 2014-10-13
 +
| Perforation
 +
|-
 +
| 2014-10-13
 +
| Performed Stage 31 of Stimulation
 +
|-
 +
| 2014-10-13
 +
| Performed Stage 32 of Stimulation
 +
|-
 +
| 2014-10-13
 +
| Performed Stage 33 of Stimulation
 +
|-
 +
| 2014-10-13
 +
| Performed Stage 34 of Stimulation
 +
|-
 +
| 2014-10-13
 +
| Performed Stage 35 of Stimulation
 +
|-
 +
| 2014-10-14
 +
| Perforation
 +
|-
 +
| 2014-10-14
 +
| Performed Stage 36 of Stimulation
 +
|-
 +
| 2014-10-14
 +
| Performed Stage 37 of Stimulation
 +
|-
 +
| 2014-10-14
 +
| Performed Stage 38 of Stimulation
 +
|-
 +
| 2014-10-14
 +
| Performed Stage 39 of Stimulation
 +
|-
 +
| 2014-10-14
 +
| Performed Stage 40 of Stimulation
 +
|-
 +
| 2014-10-15
 +
| Perforation
 +
|-
 +
| 2014-10-15
 +
| Performed Stage 41 of Stimulation
 +
|-
 +
| 2014-10-15
 +
| Performed Stage 42 of Stimulation
 +
|-
 +
| 2014-10-15
 +
| Performed Stage 43 of Stimulation
 +
|-
 +
| 2014-10-15
 +
| Performed Stage 44 of Stimulation
 +
|-
 +
| 2014-10-15
 +
| Performed Stage 45 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Perforation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 46 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 47 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 48 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 49 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 50 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 51 of Stimulation
 +
|-
 +
| 2014-10-16
 +
| Performed Stage 52 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Perforation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 53 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 54 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 55 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 56 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 57 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 58 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 59 of Stimulation
 +
|-
 +
| 2014-10-17
 +
| Performed Stage 60 of Stimulation
 +
|-
 +
| 2014-10-18
 +
| Performed Stage 61 of Stimulation
 +
|-
 +
| 2016-05-17
 +
| Deviated
 +
|-
 +
| 2016-05-17
 +
| Newly Drilled
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 323:
 
| 2014-10-04
 
| 2014-10-04
 
| 2014-10-18
 
| 2014-10-18
| style="text-align: right;" | 7312
+
| style="text-align: right;" | 7,312
| style="text-align: right;" | 11,093,500.0
+
| style="text-align: right;" | 11,093,500
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 256: Line 517:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
| 2014-10-04
 +
| style="text-align: right;" | 1
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,517
 +
| style="text-align: right;" | 8,720
 +
|-
 +
| 2014-10-05
 +
| style="text-align: right;" | 2
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,542
 +
| style="text-align: right;" | 8,810
 +
|-
 +
| 2014-10-05
 +
| style="text-align: right;" | 3
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,367
 +
| style="text-align: right;" | 8,775
 +
|-
 +
| 2014-10-05
 +
| style="text-align: right;" | 4
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,492
 +
| style="text-align: right;" | 8,718
 +
|-
 +
| 2014-10-06
 +
| style="text-align: right;" | 5
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,424
 +
| style="text-align: right;" | 8,583
 +
|-
 +
| 2014-10-06
 +
| style="text-align: right;" | 6
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,389
 +
| style="text-align: right;" | 8,807
 +
|-
 +
| 2014-10-06
 +
| style="text-align: right;" | 7
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,437
 +
| style="text-align: right;" | 8,734
 +
|-
 +
| 2014-10-07
 +
| style="text-align: right;" | 8
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,486
 +
| style="text-align: right;" | 8,770
 +
|-
 +
| 2014-10-07
 +
| style="text-align: right;" | 9
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,531
 +
| style="text-align: right;" | 8,840
 +
|-
 +
| 2014-10-08
 +
| style="text-align: right;" | 10
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,475
 +
| style="text-align: right;" | 8,814
 +
|-
 +
| 2014-10-08
 +
| style="text-align: right;" | 11
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,470
 +
| style="text-align: right;" | 8,843
 +
|-
 +
| 2014-10-08
 +
| style="text-align: right;" | 12
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,401
 +
| style="text-align: right;" | 8,839
 +
|-
 +
| 2014-10-08
 +
| style="text-align: right;" | 13
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,402
 +
| style="text-align: right;" | 8,757
 +
|-
 +
| 2014-10-09
 +
| style="text-align: right;" | 14
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,413
 +
| style="text-align: right;" | 8,749
 +
|-
 +
| 2014-10-09
 +
| style="text-align: right;" | 15
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,381
 +
| style="text-align: right;" | 8,575
 +
|-
 +
| 2014-10-09
 +
| style="text-align: right;" | 16
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,357
 +
| style="text-align: right;" | 8,736
 +
|-
 +
| 2014-10-09
 +
| style="text-align: right;" | 17
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,457
 +
| style="text-align: right;" | 8,889
 +
|-
 +
| 2014-10-10
 +
| style="text-align: right;" | 18
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,345
 +
| style="text-align: right;" | 8,576
 +
|-
 +
| 2014-10-10
 +
| style="text-align: right;" | 19
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,430
 +
| style="text-align: right;" | 8,736
 +
|-
 +
| 2014-10-10
 +
| style="text-align: right;" | 20
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,234
 +
| style="text-align: right;" | 8,460
 +
|-
 +
| 2014-10-10
 +
| style="text-align: right;" | 21
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,108
 +
| style="text-align: right;" | 8,498
 +
|-
 +
| 2014-10-11
 +
| style="text-align: right;" | 22
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,317
 +
| style="text-align: right;" | 8,607
 +
|-
 +
| 2014-10-11
 +
| style="text-align: right;" | 23
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,023
 +
| style="text-align: right;" | 8,303
 +
|-
 +
| 2014-10-11
 +
| style="text-align: right;" | 24
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,279
 +
| style="text-align: right;" | 8,596
 +
|-
 +
| 2014-10-11
 +
| style="text-align: right;" | 25
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,137
 +
| style="text-align: right;" | 8,440
 +
|-
 +
| 2014-10-12
 +
| style="text-align: right;" | 26
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,223
 +
| style="text-align: right;" | 8,446
 +
|-
 +
| 2014-10-12
 +
| style="text-align: right;" | 27
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,922
 +
| style="text-align: right;" | 8,325
 +
|-
 +
| 2014-10-12
 +
| style="text-align: right;" | 28
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,236
 +
| style="text-align: right;" | 8,547
 +
|-
 +
| 2014-10-12
 +
| style="text-align: right;" | 29
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,201
 +
| style="text-align: right;" | 8,588
 +
|-
 +
| 2014-10-12
 +
| style="text-align: right;" | 30
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,210
 +
| style="text-align: right;" | 8,644
 +
|-
 +
| 2014-10-13
 +
| style="text-align: right;" | 31
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,228
 +
| style="text-align: right;" | 8,625
 +
|-
 +
| 2014-10-13
 +
| style="text-align: right;" | 32
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,006
 +
| style="text-align: right;" | 8,302
 +
|-
 +
| 2014-10-13
 +
| style="text-align: right;" | 33
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,036
 +
| style="text-align: right;" | 8,218
 +
|-
 +
| 2014-10-13
 +
| style="text-align: right;" | 34
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,152
 +
| style="text-align: right;" | 8,563
 +
|-
 +
| 2014-10-13
 +
| style="text-align: right;" | 35
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,275
 +
| style="text-align: right;" | 8,602
 +
|-
 +
| 2014-10-14
 +
| style="text-align: right;" | 36
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,146
 +
| style="text-align: right;" | 8,811
 +
|-
 +
| 2014-10-14
 +
| style="text-align: right;" | 37
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,073
 +
| style="text-align: right;" | 8,417
 +
|-
 +
| 2014-10-14
 +
| style="text-align: right;" | 38
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,907
 +
| style="text-align: right;" | 8,428
 +
|-
 +
| 2014-10-14
 +
| style="text-align: right;" | 39
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,070
 +
| style="text-align: right;" | 8,679
 +
|-
 +
| 2014-10-14
 +
| style="text-align: right;" | 40
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,112
 +
| style="text-align: right;" | 8,602
 +
|-
 +
| 2014-10-15
 +
| style="text-align: right;" | 41
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,126
 +
| style="text-align: right;" | 8,878
 +
|-
 +
| 2014-10-15
 +
| style="text-align: right;" | 42
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,110
 +
| style="text-align: right;" | 8,498
 +
|-
 +
| 2014-10-15
 +
| style="text-align: right;" | 43
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,244
 +
| style="text-align: right;" | 8,582
 +
|-
 +
| 2014-10-15
 +
| style="text-align: right;" | 44
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,393
 +
| style="text-align: right;" | 8,631
 +
|-
 +
| 2014-10-15
 +
| style="text-align: right;" | 45
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,295
 +
| style="text-align: right;" | 8,608
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 46
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,238
 +
| style="text-align: right;" | 8,607
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 47
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,206
 +
| style="text-align: right;" | 8,540
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 48
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,899
 +
| style="text-align: right;" | 8,125
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 49
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,979
 +
| style="text-align: right;" | 8,257
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 50
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,150
 +
| style="text-align: right;" | 8,405
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 51
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,989
 +
| style="text-align: right;" | 8,397
 +
|-
 +
| 2014-10-16
 +
| style="text-align: right;" | 52
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,937
 +
| style="text-align: right;" | 8,290
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 53
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 8,024
 +
| style="text-align: right;" | 8,514
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 54
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,935
 +
| style="text-align: right;" | 8,327
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 55
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,860
 +
| style="text-align: right;" | 8,180
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 56
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,915
 +
| style="text-align: right;" | 8,272
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 57
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,670
 +
| style="text-align: right;" | 8,045
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 58
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,894
 +
| style="text-align: right;" | 8,383
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 59
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,805
 +
| style="text-align: right;" | 8,392
 +
|-
 +
| 2014-10-17
 +
| style="text-align: right;" | 60
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,710
 +
| style="text-align: right;" | 8,225
 +
|-
 +
| 2014-10-18
 +
| style="text-align: right;" | 61
 +
| OTTAWA SAND
 +
| style="text-align: right;" | 6,302,470
 +
| style="text-align: right;" | 7,902
 +
| style="text-align: right;" | 8,475
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Completion Reports - Stimulations
 +
| publisher = Pennsylvania Department of Conservation and Natural Resources
 +
| date = 2020-03-02
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-03-02 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 332: Line 1,036:
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| style="text-align: right;" | 58,666.00
+
| style="text-align: right;" | 616,801.00
| style="text-align: right;" | 59
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 357: Line 1,061:
 
| 2013
 
| 2013
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drilling Fluid Waste (in Barrels)
+
| Drill Cuttings
| style="text-align: right;" | 55.99 Bbl
+
| style="text-align: right;" | 517.28 Tons
 
| LANDFILL
 
| LANDFILL
| 301071
+
| PAD059087072
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drilling Fluid Waste
| style="text-align: right;" | 517.28 Tons
+
| style="text-align: right;" | 55.99 Bbl
 
| LANDFILL
 
| LANDFILL
| PAD059087072
+
| 301071
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 45.31 Tons
 
| style="text-align: right;" | 45.31 Tons
 
| LANDFILL
 
| LANDFILL
Line 378: Line 1,082:
 
| 2014
 
| 2014
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 6,934.50 Bbl
 
| style="text-align: right;" | 6,934.50 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 385: Line 1,089:
 
| 2015
 
| 2015
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Fracturing Fluid Waste (in Tons)
+
| Produced Fluid
 +
| style="text-align: right;" | 13,512.14 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2015
 +
| [[CNX GAS CO LLC]]
 +
| Fracturing Fluid Waste
 
| style="text-align: right;" | 46.06 Tons
 
| style="text-align: right;" | 46.06 Tons
 
| LANDFILL
 
| LANDFILL
 
| 100172
 
| 100172
|-
 
| 2015
 
| [[CNX GAS CO LLC]]
 
| Produced Fluid (in Barrels)
 
| style="text-align: right;" | 13,512.14 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 83.70 Bbl
 
| style="text-align: right;" | 83.70 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 406: Line 1,110:
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 8,949.23 Bbl
 +
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2016
 +
| [[CNX GAS CO LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 684.24 Bbl
 
| style="text-align: right;" | 684.24 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 413: Line 1,124:
 
| 2016
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| [[CNX GAS CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 8,949.23 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
|
 
|-
 
| 2016
 
| [[CNX GAS CO LLC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 301.50 Bbl
 
| style="text-align: right;" | 301.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 426: Line 1,130:
 
|-
 
|-
 
| 2017
 
| 2017
| [[HG ENERGY II APPALACHIA LLC]]
+
| [[NOBLE ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 1,357.00 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| 34-119-28803
 +
|-
 +
| 2017
 +
| [[NOBLE ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 2,506.45 Bbl
 
| style="text-align: right;" | 2,506.45 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
Line 434: Line 1,145:
 
| 2017
 
| 2017
 
| [[NOBLE ENERGY INC]]
 
| [[NOBLE ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,357.00 Bbl
+
| style="text-align: right;" | 359.54 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE OTHER THAN ROAD SPREADING
| 34-119-28803
+
|  
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 430.00 Bbl
 
| style="text-align: right;" | 430.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 448: Line 1,159:
 
| 2018
 
| 2018
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,062.00 Bbl
 
| style="text-align: right;" | 1,062.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
Line 455: Line 1,166:
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 11.00 Bbl
 
| style="text-align: right;" | 11.00 Bbl
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
 
| REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
Line 462: Line 1,173:
 
| 2019
 
| 2019
 
| [[HG ENERGY II APPALACHIA LLC]]
 
| [[HG ENERGY II APPALACHIA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 5.00 Bbl
+
| style="text-align: right;" | 1,102.00 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-19
 +
|-
 +
| 2019
 +
| [[HG ENERGY II APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 361.00 Bbl
 +
| SURFACE IMPOUNDMENT
 +
| 95-7-37312-21
 +
|-
 +
| 2019
 +
| [[HG ENERGY II APPALACHIA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 1,848.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-119-28803
 
| 34-119-28803

Latest revision as of 11:29, 15 May 2020

Well Details

Well ID: 37-125-24821
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Morris Township
Operator Name: HG ENERGY II APPALACHIA LLC
Well Pad ID: 148725
Farm/Lease Name: LAMPERSKI NV58KHS
License Status: Active
Spud Date: 2013-01-01
Permit Date: 2012-08-15
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.059133
Longitude: -80.311356

For data sources see[1][2][3]

Well History

Date Event
2012-08-15 New Permit Application
2012-12-05 Performed Spud Operation
2013-03-31 Drilling Completion
2013-09-16 New Permit Application
2014-04-10 Drilling Completion
2014-07-23 Perforation
2014-10-04 Performed Stage 1 of Stimulation
2014-10-05 Perforation
2014-10-05 Performed Stage 2 of Stimulation
2014-10-05 Performed Stage 3 of Stimulation
2014-10-05 Performed Stage 4 of Stimulation
2014-10-06 Perforation
2014-10-06 Performed Stage 5 of Stimulation
2014-10-06 Performed Stage 6 of Stimulation
2014-10-06 Performed Stage 7 of Stimulation
2014-10-07 Perforation
2014-10-07 Performed Stage 8 of Stimulation
2014-10-07 Performed Stage 9 of Stimulation
2014-10-08 Perforation
2014-10-08 Performed Stage 10 of Stimulation
2014-10-08 Performed Stage 11 of Stimulation
2014-10-08 Performed Stage 12 of Stimulation
2014-10-08 Performed Stage 13 of Stimulation
2014-10-09 Perforation
2014-10-09 Performed Stage 14 of Stimulation
2014-10-09 Performed Stage 15 of Stimulation
2014-10-09 Performed Stage 16 of Stimulation
2014-10-09 Performed Stage 17 of Stimulation
2014-10-10 Perforation
2014-10-10 Performed Stage 18 of Stimulation
2014-10-10 Performed Stage 19 of Stimulation
2014-10-10 Performed Stage 20 of Stimulation
2014-10-10 Performed Stage 21 of Stimulation
2014-10-11 Perforation
2014-10-11 Performed Stage 22 of Stimulation
2014-10-11 Performed Stage 23 of Stimulation
2014-10-11 Performed Stage 24 of Stimulation
2014-10-11 Performed Stage 25 of Stimulation
2014-10-12 Perforation
2014-10-12 Performed Stage 26 of Stimulation
2014-10-12 Performed Stage 27 of Stimulation
2014-10-12 Performed Stage 28 of Stimulation
2014-10-12 Performed Stage 29 of Stimulation
2014-10-12 Performed Stage 30 of Stimulation
2014-10-13 Perforation
2014-10-13 Performed Stage 31 of Stimulation
2014-10-13 Performed Stage 32 of Stimulation
2014-10-13 Performed Stage 33 of Stimulation
2014-10-13 Performed Stage 34 of Stimulation
2014-10-13 Performed Stage 35 of Stimulation
2014-10-14 Perforation
2014-10-14 Performed Stage 36 of Stimulation
2014-10-14 Performed Stage 37 of Stimulation
2014-10-14 Performed Stage 38 of Stimulation
2014-10-14 Performed Stage 39 of Stimulation
2014-10-14 Performed Stage 40 of Stimulation
2014-10-15 Perforation
2014-10-15 Performed Stage 41 of Stimulation
2014-10-15 Performed Stage 42 of Stimulation
2014-10-15 Performed Stage 43 of Stimulation
2014-10-15 Performed Stage 44 of Stimulation
2014-10-15 Performed Stage 45 of Stimulation
2014-10-16 Perforation
2014-10-16 Performed Stage 46 of Stimulation
2014-10-16 Performed Stage 47 of Stimulation
2014-10-16 Performed Stage 48 of Stimulation
2014-10-16 Performed Stage 49 of Stimulation
2014-10-16 Performed Stage 50 of Stimulation
2014-10-16 Performed Stage 51 of Stimulation
2014-10-16 Performed Stage 52 of Stimulation
2014-10-17 Perforation
2014-10-17 Performed Stage 53 of Stimulation
2014-10-17 Performed Stage 54 of Stimulation
2014-10-17 Performed Stage 55 of Stimulation
2014-10-17 Performed Stage 56 of Stimulation
2014-10-17 Performed Stage 57 of Stimulation
2014-10-17 Performed Stage 58 of Stimulation
2014-10-17 Performed Stage 59 of Stimulation
2014-10-17 Performed Stage 60 of Stimulation
2014-10-18 Performed Stage 61 of Stimulation
2016-05-17 Deviated
2016-05-17 Newly Drilled

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2014-10-04 2014-10-18 7,312 11,093,500 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Customer & CWS Base Fluid & Mix Water Water 7732-18-5 100 87.7167 92,598,900.0
Sand (Proppant), DAP-903, DWP-614,
BioClear 2000, DWP-NE1, Spearhead Acid
CWS Propping Agent, Scale Inhibitor, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations Apatite 64476-38-6 0.1 0.00326 3440.82
Distillates (petroleum), hydrotreated middle 64742-46-7 30 0.03225 34047.2
Ilmenite 98072-94-7 0.1 0.00233 2461.33
2-Propenoic acid, polymer with sodium phosphonate 71050-62-9 60 0.00615 6490
Diallyldimethylammonium chloride 7398-69-8 5 0.00175 1847.6
Goethite 1310-14-1 0.1 0.00512 5399.79
Dimethylcocoamine, bis(chloroethyl)
ether, diquaternary ammonium salt
68607-28-3 40 0.014 14780.8
2,2-Dibromo-3-Nitrilopropionamide 10222-01-2 20 0.01223 12911.5
Illite 12173-60-3 1 0.0063 6645.59
Formaldehyde 50-00-0 0.1 0.00015 154.85
Fatty acids, tall-oil 61790-12-3 0.1 0.0022 2322.75
Alkenes, C>10 a- 64743-02-8 0.1 0.0022 2322.75
Methanol 67-56-1 15 0.00965 10188.3
Propargyl Alcohol 107-19-7 0.1 0.00073 774.25
Polyethylene glycol mixture 25322-68-3 70 0.01223 12911.5
Sorbitan monooleate 1338-43-8 5 0.00538 5674.54
Modified thiourea polymer 68527-49-1 0.1 0.0022 2322.75
Alcohols, C14-15, ethoxylated 68951-67-7 0.1 0.0022 2322.75
Sodium chloride 7647-14-5 0.1 0.00007000 77.43
Crystalline silica (Quartz) 14808-60-7 100 11.5644 12,208,100.0
Hydrochloric acid 7647-01-0 35 0.5134 541976
Calcite 471-34-1 1 0.01948 20569.3
Isopropanol 67-63-0 40 0.014 14780.8
2-Propenoic acid, polymer with 2-propenamide, sodium salt 25987-30-8 40 0.043 45396.3
Poly(oxyethylene)nonylphenol ether 9016-45-9 5 0.00538 5674.54
Biotite 1302-27-8 0.1 0.00326 3440.82

For data sources see[5]

Stimulation Data

Stimulation Date Phase Number Chemical Agent Volume (gal) Treating Pressure (psi) Breakdown Pressure (psi)
2014-10-04 1 OTTAWA SAND 6,302,470 8,517 8,720
2014-10-05 2 OTTAWA SAND 6,302,470 8,542 8,810
2014-10-05 3 OTTAWA SAND 6,302,470 8,367 8,775
2014-10-05 4 OTTAWA SAND 6,302,470 8,492 8,718
2014-10-06 5 OTTAWA SAND 6,302,470 8,424 8,583
2014-10-06 6 OTTAWA SAND 6,302,470 8,389 8,807
2014-10-06 7 OTTAWA SAND 6,302,470 8,437 8,734
2014-10-07 8 OTTAWA SAND 6,302,470 8,486 8,770
2014-10-07 9 OTTAWA SAND 6,302,470 8,531 8,840
2014-10-08 10 OTTAWA SAND 6,302,470 8,475 8,814
2014-10-08 11 OTTAWA SAND 6,302,470 8,470 8,843
2014-10-08 12 OTTAWA SAND 6,302,470 8,401 8,839
2014-10-08 13 OTTAWA SAND 6,302,470 8,402 8,757
2014-10-09 14 OTTAWA SAND 6,302,470 8,413 8,749
2014-10-09 15 OTTAWA SAND 6,302,470 8,381 8,575
2014-10-09 16 OTTAWA SAND 6,302,470 8,357 8,736
2014-10-09 17 OTTAWA SAND 6,302,470 8,457 8,889
2014-10-10 18 OTTAWA SAND 6,302,470 8,345 8,576
2014-10-10 19 OTTAWA SAND 6,302,470 8,430 8,736
2014-10-10 20 OTTAWA SAND 6,302,470 8,234 8,460
2014-10-10 21 OTTAWA SAND 6,302,470 8,108 8,498
2014-10-11 22 OTTAWA SAND 6,302,470 8,317 8,607
2014-10-11 23 OTTAWA SAND 6,302,470 8,023 8,303
2014-10-11 24 OTTAWA SAND 6,302,470 8,279 8,596
2014-10-11 25 OTTAWA SAND 6,302,470 8,137 8,440
2014-10-12 26 OTTAWA SAND 6,302,470 8,223 8,446
2014-10-12 27 OTTAWA SAND 6,302,470 7,922 8,325
2014-10-12 28 OTTAWA SAND 6,302,470 8,236 8,547
2014-10-12 29 OTTAWA SAND 6,302,470 8,201 8,588
2014-10-12 30 OTTAWA SAND 6,302,470 8,210 8,644
2014-10-13 31 OTTAWA SAND 6,302,470 8,228 8,625
2014-10-13 32 OTTAWA SAND 6,302,470 8,006 8,302
2014-10-13 33 OTTAWA SAND 6,302,470 8,036 8,218
2014-10-13 34 OTTAWA SAND 6,302,470 8,152 8,563
2014-10-13 35 OTTAWA SAND 6,302,470 8,275 8,602
2014-10-14 36 OTTAWA SAND 6,302,470 8,146 8,811
2014-10-14 37 OTTAWA SAND 6,302,470 8,073 8,417
2014-10-14 38 OTTAWA SAND 6,302,470 7,907 8,428
2014-10-14 39 OTTAWA SAND 6,302,470 8,070 8,679
2014-10-14 40 OTTAWA SAND 6,302,470 8,112 8,602
2014-10-15 41 OTTAWA SAND 6,302,470 8,126 8,878
2014-10-15 42 OTTAWA SAND 6,302,470 8,110 8,498
2014-10-15 43 OTTAWA SAND 6,302,470 8,244 8,582
2014-10-15 44 OTTAWA SAND 6,302,470 8,393 8,631
2014-10-15 45 OTTAWA SAND 6,302,470 8,295 8,608
2014-10-16 46 OTTAWA SAND 6,302,470 8,238 8,607
2014-10-16 47 OTTAWA SAND 6,302,470 8,206 8,540
2014-10-16 48 OTTAWA SAND 6,302,470 7,899 8,125
2014-10-16 49 OTTAWA SAND 6,302,470 7,979 8,257
2014-10-16 50 OTTAWA SAND 6,302,470 8,150 8,405
2014-10-16 51 OTTAWA SAND 6,302,470 7,989 8,397
2014-10-16 52 OTTAWA SAND 6,302,470 7,937 8,290
2014-10-17 53 OTTAWA SAND 6,302,470 8,024 8,514
2014-10-17 54 OTTAWA SAND 6,302,470 7,935 8,327
2014-10-17 55 OTTAWA SAND 6,302,470 7,860 8,180
2014-10-17 56 OTTAWA SAND 6,302,470 7,915 8,272
2014-10-17 57 OTTAWA SAND 6,302,470 7,670 8,045
2014-10-17 58 OTTAWA SAND 6,302,470 7,894 8,383
2014-10-17 59 OTTAWA SAND 6,302,470 7,805 8,392
2014-10-17 60 OTTAWA SAND 6,302,470 7,710 8,225
2014-10-18 61 OTTAWA SAND 6,302,470 7,902 8,475

For data sources see[6]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2013 CNX GAS CO LLC 0.00 0 0.00 0 0.00 0
2014 CNX GAS CO LLC 384,903.02 42 0.00 0 0.00 0
2015 CNX GAS CO LLC 1,344,742.26 337 0.00 0 0.00 0
2016 NOBLE ENERGY INC 1,346,940.75 366 0.00 0 0.00 0
2017 HG ENERGY II APPALACHIA LLC 1,011,479.39 365 0.00 0 0.00 0
2018 HG ENERGY II APPALACHIA LLC 863,389.00 365 0.00 0 0.00 0
2019 HG ENERGY II APPALACHIA LLC 616,801.00 365 0.00 0 0.00 0

For data sources see[7]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2013 CNX GAS CO LLC Drill Cuttings 517.28 Tons LANDFILL PAD059087072
2013 CNX GAS CO LLC Drilling Fluid Waste 55.99 Bbl LANDFILL 301071
2013 CNX GAS CO LLC Drill Cuttings 45.31 Tons LANDFILL 100172
2014 CNX GAS CO LLC Produced Fluid 6,934.50 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Produced Fluid 13,512.14 Bbl REUSE OTHER THAN ROAD SPREADING
2015 CNX GAS CO LLC Fracturing Fluid Waste 46.06 Tons LANDFILL 100172
2016 CNX GAS CO LLC Produced Fluid 83.70 Bbl INJECTION DISPOSAL WELL 34-119-28780
2016 CNX GAS CO LLC Produced Fluid 8,949.23 Bbl REUSE OTHER THAN ROAD SPREADING
2016 CNX GAS CO LLC Produced Fluid 684.24 Bbl INJECTION DISPOSAL WELL 34-119-28803
2016 CNX GAS CO LLC Produced Fluid 301.50 Bbl INJECTION DISPOSAL WELL 34-013-20609
2017 NOBLE ENERGY INC Produced Fluid 1,357.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2017 NOBLE ENERGY INC Produced Fluid 2,506.45 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017 NOBLE ENERGY INC Produced Fluid 359.54 Bbl REUSE OTHER THAN ROAD SPREADING
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 430.00 Bbl INJECTION DISPOSAL WELL 34-119-28803
2018 HG ENERGY II APPALACHIA LLC Produced Fluid 1,062.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 11.00 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,102.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-19
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 361.00 Bbl SURFACE IMPOUNDMENT 95-7-37312-21
2019 HG ENERGY II APPALACHIA LLC Produced Fluid 1,848.00 Bbl INJECTION DISPOSAL WELL 34-119-28803

For data sources see[8]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2129815 Primary Facility 2013-01-09 Drilling/Alteration No Violations Noted
2260179 Primary Facility 2014-04-02 Drilling/Alteration No Violations Noted Patterson UTI # 324 drilling for CNX Gas using closed loop system and flare stack. Currently drilling ahead. Current depth @ 8347. Containment under entire rig and support equipment in good condition. BOP tested good at nipple up.
2422785 Primary Facility 2015-10-28 Site Restoration No Violations Noted
2483655 Primary Facility 2016-05-05 Incident- Response to Accident or Event In Compliance with Policy On Thursday May 5, 2016, I received notification of a release of brine water at the NV58HS Well Site located in Morris Township, Washington County. The release was discovered and reported on Wednesday May 4, 2016 and was estimated to involve approximately 30 to 35 gallons of brine water from a leaking dump valve in a GPU. The valve was repaired and the GPU and concrete slab were cleaned. The impacted gravel surrounding the concrete slab was excavated until conductivity probe readings identified unaffected material. The excavated material was placed into drums for off-site disposal. The incident has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time.
2787404 Primary Facility 2018-10-05 Routine/Complete Inspection No Violations Noted On Friday October 5, 2018 I conducted a routine-complete inspection at the NV58 Well Site located in Morris Township, Greene County.

Gas well NV58KHS (125-24821) and the associated infrastructure appeared to be in good condition and functioning properly. The gas well was tagged with identification.

No violations were identified during the inspection.

For data sources see[9]

References