X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30666"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30666
 
| Well ID: 37-005-30666
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.805792, -79.524886 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.805792, -79.524886 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: FLYNN 1-2
 
| Farm/Lease Name: FLYNN 1-2
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-12-07
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2010-06-10
 
| Permit Date: 2010-06-10
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.805792
 
| Latitude: 40.805792
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2010-06-10
 +
| New Permit Application
 +
|-
 +
| 2010-12-07
 +
| Performed Spud Operation
 +
|-
 +
| 2010-12-12
 +
| Drilling Completion
 +
|-
 +
| 2011-01-03
 +
| Perforation
 +
|-
 +
| 2013-05-31
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 161: Line 202:
 
| style="text-align: right;" | 1,166.00
 
| style="text-align: right;" | 1,166.00
 
| style="text-align: right;" | 343
 
| style="text-align: right;" | 343
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[MDS ENERGY DEV LLC]]
 +
| style="text-align: right;" | 3,213.00
 +
| style="text-align: right;" | 336
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 184: Line 234:
 
| 2011
 
| 2011
 
| [[MDS ENERGY LTD]]
 
| [[MDS ENERGY LTD]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 42.00 Bbl
 
| style="text-align: right;" | 42.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 191: Line 241:
 
| 2012
 
| 2012
 
| [[MDS ENERGY LTD]]
 
| [[MDS ENERGY LTD]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 33.00 Bbl
 
| style="text-align: right;" | 33.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 198: Line 248:
 
| 2014
 
| 2014
 
| [[MDS ENERGY LTD]]
 
| [[MDS ENERGY LTD]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 46 Bbl
 +
| CENT WASTE TRT FAC NPDES
 +
| PA0095443
 +
|-
 +
| 2014
 +
| [[MDS ENERGY LTD]]
 +
| Produced Fluid
 
| style="text-align: right;" | 46.00 Bbl
 
| style="text-align: right;" | 46.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
Line 205: Line 262:
 
| 2018
 
| 2018
 
| [[MDS ENERGY DEV LLC]]
 
| [[MDS ENERGY DEV LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 28.00 Bbl
 
| style="text-align: right;" | 28.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 07:50, 21 May 2020

Well Details

Well ID: 37-005-30666
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: West Kittanning Borough
Operator Name: MDS ENERGY DEV LLC
Well Pad ID:
Farm/Lease Name: FLYNN 1-2
License Status:
Spud Date:
Permit Date: 2010-06-10
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.805792
Longitude: -79.524886

For data sources see[1][2][3]

Well History

Date Event
2010-06-10 New Permit Application
2010-12-07 Performed Spud Operation
2010-12-12 Drilling Completion
2011-01-03 Perforation
2013-05-31 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2010 MDS ENERGY LTD 0.00 0 0.00 0 0.00 0
2011 MDS ENERGY LTD 11,543.00 180 0.00 0 0.00 0
2012 MDS ENERGY LTD 16,738.00 347 0.00 0 0.00 0
2013 MDS ENERGY LTD 7,451.00 323 0.00 0 0.00 0
2014 MDS ENERGY LTD 5,421.00 273 0.00 0 0.00 0
2015 MDS ENERGY DEV LLC 4,648.00 250 0.00 0 0.00 0
2016 MDS ENERGY DEV LLC 4,723.00 293 0.00 0 0.00 0
2017 MDS ENERGY DEV LLC 4,427.00 290 0.00 0 0.00 0
2018 MDS ENERGY DEV LLC 1,166.00 343 0.00 0 0.00 0
2019 MDS ENERGY DEV LLC 3,213.00 336 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2011 MDS ENERGY LTD Produced Fluid 42.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2012 MDS ENERGY LTD Produced Fluid 33.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2014 MDS ENERGY LTD Produced Fluid 46 Bbl CENT WASTE TRT FAC NPDES PA0095443
2014 MDS ENERGY LTD Produced Fluid 46.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095443
2018 MDS ENERGY DEV LLC Produced Fluid 28.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1933398 Primary Facility 2010-12-07 Drilling/Alteration No Violations Noted Rigging up and preparing to spud at time of inspection. Proposed TD = 3456' with casing plan as follows: As needed - 13 3/8", as needed - 9 3/8", 1156' - 0.231" wall 7". Pit not lined at time of inspection. Discussed with operator rep Randy Morris that pit wall facing Flynn tire building was falling in and needed addressed. Well has several buildings within 200'; discussed with operator rep Randy Morris that well control (BOP, flare stack, kill-fluids) should be attended to. Inspection conducted w/OGI D. Catalano.
1933407 Primary Facility 2010-12-09 Drilling/Alteration No Violations Noted Cleaning out hole in prep for running 1136' of 0.231" wall 7" casing at time of inspection. Casing set: 40' - 13 3/8" 37 lb/ft, 210' - 9 5/8" 26 lb/ft in 229' of 12 1/4" hole; cement basket set at 120'. On 12/08/10 cemented 9 5/8" with 90 sacks of "A" containing 3% CACL2 & 1/2# flake (yield=1.18 cu ft/sk). Pumping of cement completed at 11:11. Grouted backside of 9 5/8" casing with 9 bbls of cement. Pit lined and freeboard maintained. No E/S control issues on site.
1937681 Primary Facility 2010-12-15 Drilling/Alteration No Violations Noted Well shut-in on 7" x 2" swage.
1939573 Primary Facility 2010-12-21 Routine/Complete Inspection No Violations Noted Well Drilled. Not equipped for production. Site ID sign and E&S plan located. Pit on-site / appears to be in sound condition. There are no signs of erosion or sedimentation on the well site or access road.
1943086 Primary Facility 2011-01-11 Drilling/Alteration No Violations Noted Well shut in on 2" tubing.
1949884 Primary Facility 2011-02-08 Routine/Complete Inspection No Violations Noted Well Drilled. Not equipped for production. Site ID sign and E&S plan located. Site has been re-graded. There are 4 roll-off boxes still on-site. There are no signs of erosion or sedimentation.
2203315 Primary Facility 2013-09-05 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tanks located onsite and they appeared to be in sound condition.

For data sources see[7]

References