X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-005-30898"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-005-30898
 
| Well ID: 37-005-30898
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.843018, -79.473068 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.843018, -79.473068 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: TICKLE FARM PAD 3H
 
| Farm/Lease Name: TICKLE FARM PAD 3H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2012-08-30
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-10-12
 
| Permit Date: 2011-10-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 40.843018
 
| Latitude: 40.843018
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-10-12
 +
| New Permit Application
 +
|-
 +
| 2012-08-30
 +
| Performed Spud Operation
 +
|-
 +
| 2012-11-06
 +
| Drilling Completion
 +
|-
 +
| 2013-01-12
 +
| Perforation
 +
|-
 +
| 2014-04-14
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2013-01-12
 
| 2013-01-12
 
| 2013-01-12
 
| 2013-01-12
| style="text-align: right;" | 6737.00
+
| style="text-align: right;" | 6,737
| style="text-align: right;" | 5,660,810.0
+
| style="text-align: right;" | 5,660,810
 
| style="text-align: right;" |  
 
| style="text-align: right;" |  
 
|-
 
|-
Line 340: Line 370:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 425: Line 466:
 
| 2019
 
| 2019
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| style="text-align: right;" | 61,824.00
+
| style="text-align: right;" | 240,263.00
| style="text-align: right;" | 90
+
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 450: Line 491:
 
| 2012
 
| 2012
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 648.80 Tons
 
| style="text-align: right;" | 648.80 Tons
 
| LANDFILL
 
| LANDFILL
Line 457: Line 498:
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 8,249.96 Bbl
+
| style="text-align: right;" | 710.51 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D205BCLE
+
| 34-013-20611
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 82.50 Bbl
 
| style="text-align: right;" | 82.50 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 471: Line 512:
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Fracturing Fluid Waste (in Tons)
+
| Produced Fluid
| style="text-align: right;" | 54.06 Tons
+
| style="text-align: right;" | 1,817.61 Bbl
| LANDFILL
+
| REUSE OTHER THAN ROAD SPREADING
| 100434
+
|  
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,120.48 Bbl
 
| style="text-align: right;" | 1,120.48 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 485: Line 526:
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 7,910.00 Bbl
 
| style="text-align: right;" | 7,910.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 492: Line 533:
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Fracturing Fluid Waste
| style="text-align: right;" | 710.51 Bbl
+
| style="text-align: right;" | 54.06 Tons
| INJECTION DISPOSAL WELL
+
| LANDFILL
| 34-013-20611
+
| 100434
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,817.61 Bbl
+
| style="text-align: right;" | 8,249.96 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| INJECTION DISPOSAL WELL
|  
+
| PAS2D205BCLE
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 5,754.62 Bbl
+
| style="text-align: right;" | 81.39 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D205BCLE
+
| 34-059-24067
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 81.39 Bbl
+
| style="text-align: right;" | 5,754.62 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-059-24067
+
| PAS2D205BCLE
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Fracturing Fluid Waste (in Tons)
+
| Fracturing Fluid Waste
 
| style="text-align: right;" | 3.55 Tons
 
| style="text-align: right;" | 3.55 Tons
 
| LANDFILL
 
| LANDFILL
Line 527: Line 568:
 
| 2015
 
| 2015
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 3,734.80 Bbl
 
| style="text-align: right;" | 3,734.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 534: Line 575:
 
| 2016
 
| 2016
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 +
| style="text-align: right;" | 1,941.70 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2016
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 489.30 Bbl
 
| style="text-align: right;" | 489.30 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
| 2016
+
| 2017
 +
| [[EXCO RESOURCES PA LLC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 2,088.20 Bbl
 +
| INJECTION DISPOSAL WELL
 +
| PAS2D205BCLE
 +
|-
 +
| 2017
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
 
| style="text-align: right;" | 1,941.70 Bbl
+
| style="text-align: right;" | 1,450.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
| PAS2D205BCLE
Line 548: Line 603:
 
| 2017
 
| 2017
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 103.60 Bbl
 
| style="text-align: right;" | 103.60 Bbl
 
| REUSE (AT WELL PAD)
 
| REUSE (AT WELL PAD)
Line 555: Line 610:
 
| 2017
 
| 2017
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
 
| style="text-align: right;" | 2,088.20 Bbl
+
| style="text-align: right;" | 103.60 Bbl
| INJECTION DISPOSAL WELL
+
| REUSE (AT WELL PAD)
| PAS2D205BCLE
+
|  
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,398.60 Bbl
+
| style="text-align: right;" | 234.80 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| PAS2D205BCLE
+
| 34-007-21847
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 234.80 Bbl
+
| style="text-align: right;" | 1,398.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-007-21847
+
| PAS2D205BCLE
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[EXCO RESOURCES PA LLC]]
 
| [[EXCO RESOURCES PA LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 388.50 Bbl
+
| style="text-align: right;" | 1,398.60 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| PAS2D205BCLE
 
| PAS2D205BCLE

Latest revision as of 08:08, 21 May 2020

Well Details

Well ID: 37-005-30898
Loading map...
Country: United States
State: Pennsylvania
County: Armstrong
Municipality: Rayburn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 149443
Farm/Lease Name: TICKLE FARM PAD 3H
License Status:
Spud Date:
Permit Date: 2011-10-12
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: Yes
Latitude: 40.843018
Longitude: -79.473068

For data sources see[1][2][3]

Well History

Date Event
2011-10-12 New Permit Application
2012-08-30 Performed Spud Operation
2012-11-06 Drilling Completion
2013-01-12 Perforation
2014-04-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-12 2013-01-12 6,737 5,660,810

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 DAP-103 Calfrac Well Services Iron Control
Hydrochloric Acid Calfrac Well Services Clean Perforations Amine salt 5.00 0.00101000
Apatite 64476-38-6 0.10 0.00371000
Biotite 1302-27-8 0.10 0.00371000
Fatty acids 30.00 0.00070000
Polyoxyalkylenes surfactant 5.00 0.00386000
Olefin 5.00 0.00012000
Polyethylene glycol 25322-68-3 70.00 0.01
Quartz 14808-60-7 100.00 13.08
Hydrochloric acid 7647-01-0 37.00 0.49
Propargyl Alcohol 10.00 0.00023000
Polyacrylamide polymer 40.00 0.03
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 40.00 0.01
Sodium chloride 7647-14-5 1.00 0.00002000
Methanol 67-56-1 60.00 0.00744000
Carbonic acid calcium salt (1:1) 471-34-1 1.00 0.02
Nonionic surfactant 5.00 0.00386000
Oxyalkylated polyamine 5.00 0.00101000
Ammonium chloride 12125-02-9 10.00 0.00121000
Citric acid 77-92-9 60.00 0.00497000
Ilmenite (FeTiO3), conc. 98072-94-7 0.10 0.00267000
Goethite 1310-14-1 0.10 0.00581000
Formalin 50-00-0 0.10 0.00003000
Thiourea polymer 68527-49-1 30.00 0.00070000
Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02
Organic phosphonate 1 30.00 0.00603000
Illite 12173-60-3 1.00 0.00720000
Polyoxyalkylenes 30.00 0.00070000
Organic phosphonate 2 10.00 0.00201000
Acetic acid 64-19-7 1.00 0.00020000
DWP-944 Calfrac Well Services Biocide
DAP-925 Calfrac Well Services Acid Corrosion Inhibitor
Water BaseFluid/Mix Water Water 7732-18-5 100.00 86.29
DWP-612 Calfrac Well Services Friction Reducer
DAP-901 Calfrac Well Services Scale Inhibitor
Sand (Proppant) Calfrac Well Services Propping Agent

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 426,048.00 184 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 592,931.00 365 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 416,047.00 365 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 350,901.00 361 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 307,851.00 362 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 264,906.00 364 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 240,263.00 365 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2012 EXCO RESOURCES PA LLC Drill Cuttings 648.80 Tons LANDFILL 100434
2013 EXCO RESOURCES PA LLC Produced Fluid 710.51 Bbl INJECTION DISPOSAL WELL 34-013-20611
2013 EXCO RESOURCES PA LLC Produced Fluid 82.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW006
2013 EXCO RESOURCES PA LLC Produced Fluid 1,817.61 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Produced Fluid 1,120.48 Bbl INJECTION DISPOSAL WELL 34-059-24067
2013 EXCO RESOURCES PA LLC Fracing Fluid Waste 7,910.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013 EXCO RESOURCES PA LLC Fracturing Fluid Waste 54.06 Tons LANDFILL 100434
2013 EXCO RESOURCES PA LLC Produced Fluid 8,249.96 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Produced Fluid 81.39 Bbl INJECTION DISPOSAL WELL 34-059-24067
2014 EXCO RESOURCES PA LLC Produced Fluid 5,754.62 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2014 EXCO RESOURCES PA LLC Fracturing Fluid Waste 3.55 Tons LANDFILL 100434
2015 EXCO RESOURCES PA LLC Produced Fluid 3,734.80 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 1,941.70 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016 EXCO RESOURCES PA LLC Produced Fluid 489.30 Bbl REUSE OTHER THAN ROAD SPREADING
2017 EXCO RESOURCES PA LLC Produced Fluid 2,088.20 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC 1,450.20 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017 EXCO RESOURCES PA LLC Produced Fluid 103.60 Bbl REUSE (AT WELL PAD)
2017 EXCO RESOURCES PA LLC 103.60 Bbl REUSE (AT WELL PAD)
2018 EXCO RESOURCES PA LLC Produced Fluid 234.80 Bbl INJECTION DISPOSAL WELL 34-007-21847
2018 EXCO RESOURCES PA LLC Produced Fluid 1,398.60 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019 EXCO RESOURCES PA LLC Produced Fluid 1,398.60 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2094875 Primary Facility 2012-08-22 Drilling/Alteration No Violations Noted not drilled
2097775 Primary Facility 2012-09-04 Routine/Complete Inspection No Violations Noted Drilling had commenced, but was not ongoing at the time of the inspection due to a changeover in drilling rigs. Secondary containement was noted as being implemented on the well pad. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. All erosion controls had been implemented and were functioning properly. Frac impoundment located onsite. At the time of the inspection the frac impoundment had been lined and was holding rainwater.
2103839 Primary Facility 2012-09-20 Drilling/Alteration No Violations Noted no cement returns while cementing 400' of 20" casing
2105774 Primary Facility 2012-10-04 Drilling/Alteration No Violations Noted awating to resume drilling
2109435 Primary Facility 2012-10-19 Drilling/Alteration No Violations Noted @ 410'
2111849 Primary Facility 2012-10-23 Drilling/Alteration No Violations Noted Tripping in with 10 3/4" bit
2118623 Primary Facility 2012-11-16 Routine/Complete Inspection No Violations Noted Prod string installed and cemented
2144830 Primary Facility 2013-03-04 Routine/Complete Inspection No Violations Noted Drilling appeared to have been completed. Secondary containment was implemented around the well head and under the 18 tanks located onsite to handle flowback. All site and access road erosion controls had been properly maintained and there was no observed accelerated erosion or sedimentation in relation to the site or access road.
2166171 Primary Facility 2013-05-14 Routine/Complete Inspection No Violations Noted Drilling was not ongoing at the time of the inspection. Wells were in the process of being equipped for production. Brine tanks located onsite and they appeared to be in sound condition. Covered roll-off boxes onsite within secondary containment. 16 Frac tanks located onsite also on secondary containment. All frac tanks appeared to be in sound condition. Operator was in the process of having the tanks cleaned and broken down for removal from the site. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2196999 Primary Facility 2013-08-15 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2230478 Primary Facility 2013-12-09 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been properly implemented and maintained. Site had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. Impoundment located onsite. Impoundment contained fluids and had more than two feet of lined freeboard.
2287252 Primary Facility 2014-07-14 Complaint Inspection No Violations Noted 4 wells on pad. Producing gas. Tag, tanks, e&s ok.
2293423 Primary Facility 2014-08-05 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been properly implemented and maintained. Site had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. Impoundment located onsite. Impoundment contained fluids and had more than two feet of lined freeboard.
2333353 Primary Facility 2015-01-05 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite and it appeared to be in sound condition. Erosion controls had been properly implemented and maintained. Site had been temporarily stabilized. There was no observed accelerated erosion or sedimentation in relation to the access road or well-site. Impoundment located onsite. Impoundment contained fluids and had more than two feet of lined freeboard.
2377647 Primary Facility 2015-06-09 Complaint Inspection No Violations Noted 4 wells equipped for production. Id sign and e&s ok. 2 tanks onsite.
2540139 Primary Facility 2016-11-30 Routine/Complete Inspection No Violations Noted Wells were appropriately labeled and brine tanks located onsite. Brine tanks appeared to be in sound condition. There was no observed accelerated erosion & sedimentation in relation to the site or access road.
2556554 Primary Facility 2017-01-30 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2621955 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well appeared to be equipped for production. Brine tank located onsite within containment. Both the tank and containment appeared to be in sound condition. There was no observed accelerated erosion or sedimentation in relation to the site or access road.
2673038 Primary Facility 2017-12-20 Routine/Complete Inspection No Violations Noted At time of inspection, well 3H drilled and appears equipped for production. Wells 1H, 2H, 4H also drilled and appear equipped for production.
2722654 Primary Facility 2018-04-25 Routine/Complete Inspection No Violations Noted Multi-well pad. At time of inspection, well 3H drilled and appears equipped for production. Wells 1H, 2H, and 4H also drilled and appear equipped for production.
2743024 Primary Facility 2018-06-19 Routine/Complete Inspection No Violations Noted This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok.
2799037 Primary Facility 2018-11-05 Routine/Complete Inspection No Violations Noted Well appears equipped for production. Well head surrounded by cement barriers. Two brine tanks on site.
2831980 Primary Facility 2019-01-23 Routine/Partial Inspection No Violations Noted At the time of inspection, well was equipped for production. The well integrity appeared to be in good condition, with no signs of any leaks. There was only some minor rust observed. The well was being injected with a foamer combo. The gauges on the well were reading 291 psi on the tubing and 396 psi on the production casing. There were 2 tanks within a lined, steel dike. There were also 2 dual line heaters being used. The well was properly labeled and the Emergency Response sign was posted at the site access entrance.
2837787 Primary Facility 2019-02-08 Routine/Complete Inspection No Violations Noted On 2/8/19 at 1203 hrs., I conducted a routine inspection of Exco Resources PA, LLC's Tickle Farm Pad 3H well (API 005-30898) in Rayburn Twp., Armstrong Co. It is one of four permitted wells that are drilled and equipped for production. A well tag is affixed to the well head. The permit number is posted at the entrance to the pad. There are no violations noted for this inspection.

For data sources see[8]

References