X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-049-25386"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-049-25386
 
| Well ID: 37-049-25386
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.886611, -80.290194 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.886611, -80.290194 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: PAROBEK 1
 
| Farm/Lease Name: PAROBEK 1
 
|-
 
|-
| License Status: Plugged OG Well
+
| License Status: PLUGGED & ABANDONED
 
|-
 
|-
| Spud Date: 2011-11-17
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2011-07-28
 
| Permit Date: 2011-07-28
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: Yes
 
|-
 
|-
 
| Latitude: 41.886611
 
| Latitude: 41.886611
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2011-07-28
 +
| New Permit Application
 +
|-
 +
| 2011-11-17
 +
| Performed Spud Operation
 +
|-
 +
| 2011-12-02
 +
| Drilling Completion
 +
|-
 +
| 2011-12-20
 +
| Drilling Completion
 +
|-
 +
| 2012-03-08
 +
| FULLY PLUGGED
 +
|-
 +
| 2012-06-13
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 104:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->

Latest revision as of 03:11, 16 May 2020

Well Details

Well ID: 37-049-25386
Loading map...
Country: United States
State: Pennsylvania
County: Erie
Municipality: Elk Creek Township
Operator Name: ENERVEST OPR LLC
Well Pad ID:
Farm/Lease Name: PAROBEK 1
License Status: PLUGGED & ABANDONED
Spud Date:
Permit Date: 2011-07-28
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: Yes
Latitude: 41.886611
Longitude: -80.290194

For data sources see[1][2][3]

Well History

Date Event
2011-07-28 New Permit Application
2011-11-17 Performed Spud Operation
2011-12-02 Drilling Completion
2011-12-20 Drilling Completion
2012-03-08 FULLY PLUGGED
2012-06-13 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 ENERVEST OPR LLC 0.00 0 0.00 0 0.00 0
2012 ENERVEST OPR LLC 0.00 0 0.00 0 0.00 0
2013 ENERVEST OPR LLC 0.00 0 0.00 0 0.00 0
2014 ENERVEST OPR LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2020534 Primary Facility 2011-11-17 Routine/Complete Inspection No Violations Noted New well pad with rig -currently being setup on site. Permit is posted-E&S Plan is posted and implemented-pits dug and lined BMPs in place- no violations.
2021851 Primary Facility 2011-11-18 Drilling/Alteration No Violations Noted
2022148 Primary Facility 2011-11-21 Drilling/Alteration No Violations Noted
2023203 Primary Facility 2011-11-30 Drilling/Alteration No Violations Noted
2091144 Primary Facility 2012-08-02 Site Restoration No Violations Noted

For data sources see[6]

References