X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-019-22216"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-019-22216
 
| Well ID: 37-019-22216
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.768822, -79.852908 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.768822, -79.852908 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: VADNAL B UNIT 7H
 
| Farm/Lease Name: VADNAL B UNIT 7H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2014-04-16
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2014-02-24
 
| Permit Date: 2014-02-24
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.768822
 
| Latitude: 40.768822
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2014-02-24
 +
| New Permit Application
 +
|-
 +
| 2014-04-16
 +
| Performed Spud Operation
 +
|-
 +
| 2014-08-01
 +
| Drilling Completion
 +
|-
 +
| 2015-04-02
 +
| Perforation
 +
|-
 +
| 2015-07-14
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
== Fracking Activities ==
 
== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 62: Line 92:
 
| 2015-04-01
 
| 2015-04-01
 
| 2015-04-30
 
| 2015-04-30
| style="text-align: right;" | 6202
+
| style="text-align: right;" | 6,202
| style="text-align: right;" | 10,504,300.0
+
| style="text-align: right;" | 10,504,300
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 252: Line 282:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-06-19 }}</ref>
 
  | accessdate = 2019-06-19 }}</ref>
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 +
|-
 +
|}-->
 +
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 310: Line 351:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 144,980.63
+
| style="text-align: right;" | 528,000.52
| style="text-align: right;" | 90
+
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 335: Line 376:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drill Cuttings (in Tons)
+
| Drill Cuttings
 
| style="text-align: right;" | 1,207.25 Tons
 
| style="text-align: right;" | 1,207.25 Tons
 
| LANDFILL
 
| LANDFILL
Line 342: Line 383:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 200.00 Bbl
+
| style="text-align: right;" | 825.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
Line 349: Line 390:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 23,162.15 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
|-
 
| 2015
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 4,651.20 Bbl
 
| style="text-align: right;" | 4,651.20 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 363: Line 397:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 825.00 Bbl
+
| style="text-align: right;" | 200.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123SW005
 
| WMGR123SW005
Line 370: Line 404:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 23,162.15 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 +
| WMGR123NW009
 +
|-
 +
| 2015
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 1,366.00 Bbl
 
| style="text-align: right;" | 1,366.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 377: Line 418:
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 275.00 Bbl
 
| style="text-align: right;" | 275.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 384: Line 425:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,083.50 Bbl
 
| style="text-align: right;" | 1,083.50 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 391: Line 432:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,348.00 Bbl
+
| style="text-align: right;" | 330.00 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
 +
| 34-133-21076
 +
|-
 +
| 2016
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5,010.00 Bbl
 +
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 330.00 Bbl
+
| style="text-align: right;" | 1,348.00 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-21076
+
| WMGR123NW009
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 270.00 Bbl
 
| style="text-align: right;" | 270.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|  34-133-24189
 
|-
 
|-
| 2016
+
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 5,010.00 Bbl
+
| style="text-align: right;" | 850.22 Bbl
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
+
| INJECTION DISPOSAL WELL
| WMGR123NW009
+
| 34-133-21076
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 217.00 Bbl
 
| style="text-align: right;" | 217.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 426: Line 474:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 1,105.81 Bbl
 
| style="text-align: right;" | 1,105.81 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 433: Line 481:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 2,575.00 Bbl
 
| style="text-align: right;" | 2,575.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 440: Line 488:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 6,313.96 Bbl
 
| style="text-align: right;" | 6,313.96 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW009
 
| WMGR123NW009
 
|-
 
|-
| 2017
+
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 850.22 Bbl
+
| style="text-align: right;" | 226.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-21076
+
| 34-133-24096
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 5,016.05 Bbl
 
| style="text-align: right;" | 5,016.05 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
Line 461: Line 509:
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 226.10 Bbl
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
|-
 
| 2018
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels) RWC 802
 
 
| style="text-align: right;" | 120.00 Bbl
 
| style="text-align: right;" | 120.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 475: Line 516:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 342.00 Bbl
+
| style="text-align: right;" | 4,498.93 Bbl
| INJECTION DISPOSAL WELL
+
| RESIDUAL WASTE PROCESSING FACILITY
| 34-133-21076
+
| WMGR123NW009
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,598.00 Bbl
+
| style="text-align: right;" | 1,395.68 Bbl
| RESIDUAL WASTE PROCESSING FACILITY
+
| INJECTION DISPOSAL WELL
| WMGR123NW009
+
| 34-133-24189
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 489.37 Bbl
+
| style="text-align: right;" | 89.69 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-24189
+
| 34-133-20114
 
|-
 
|-
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 1,328.00 Bbl
+
| style="text-align: right;" | 2,936.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-24096
 
| 34-133-24096
Line 503: Line 544:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 89.69 Bbl
+
| style="text-align: right;" | 1,206.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
| 34-133-20114
+
| 34-133-21076
 
|-
 
|-
 
|}
 
|}

Latest revision as of 21:39, 21 May 2020

Well Details

Well ID: 37-019-22216
Loading map...
Country: United States
State: Pennsylvania
County: Butler
Municipality: Jefferson Township
Operator Name: XTO ENERGY INC
Well Pad ID: 150936
Farm/Lease Name: VADNAL B UNIT 7H
License Status:
Spud Date:
Permit Date: 2014-02-24
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 40.768822
Longitude: -79.852908

For data sources see[1][2][3]

Well History

Date Event
2014-02-24 New Permit Application
2014-04-16 Performed Spud Operation
2014-08-01 Drilling Completion
2015-04-02 Perforation
2015-07-14 DEVIATED

For data sources see[4]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-04-01 2015-04-30 6,202 10,504,300 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid (7.5%) Axiall Acidizing Hydrochloric Acid 7647-01-0 7.5 0.0396072 38586.3
Hydrochloric Acid 7647-01-0 7.5 0.0164407 16017
Other - (non-hazardous) NA 92.5 0.921676 897920
Hydrochloric Acid 7647-01-0 7.5 0.0186826 18201.1
Water XTO Carrier/Base Fluid Water 7732-18-5 100 89.9773 87,658,100.0
Hydrochloric Acid (15%) Axiall Acidizing Hydrochloric Acid 7647-01-0 15 0.0025936 2526.75
Hydrochloric Acid 7647-01-0 15 0.00624822 6087.18
Hydrochloric Acid 7647-01-0 15 0.00294728 2871.31
Other - (non-hazardous) NA 85 0.0668049 65083
Friction Reducer, Unislick ST-50 CESI Chemical Friction Reducer Petroleum distillates, hydrotreated light 64742-47-8 30 0.0173529 16905.6
Other - (non-hazardous) NA 70 0.04049 39446.4
Scale Inhibitor, ScaleHib A Nalco Scale Inhibitor Other - (non-hazardous) NA 70 0.00738502 7194.68
Ethylene Glycol 107-21-1 30 0.00316501 3083.43
Sand (Proppant) Universal Proppant Silica Substrate NA 100 8.86848 8,639,900.0
Acid Inhibitor, Unihib G GeoSafe Acid Inhibitor Polyethylene Glycol 25322-68-3 50 0.0051823 5048.73
Methanol 67-56-1 5 0.00002542 24.768
Short chained glycol ether 112-34-5 60 0.000305079 297.216
Acetophenone 98-86-2 1 0.00000508 4.954
Other - (non-hazardous) NA 30 0.00310938 3029.24
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 20 0.00207292 2019.49
Ethoxylated alcohol 68002-97-1 35 0.000177963 173.376
Formaldehyde 50-00-0 1 0.00000508 4.954
Thiourea 62-56-6 1 0.00000508 4.954

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2014 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2015 XTO ENERGY INC 556,097.00 189 0.00 0 0.00 0
2016 XTO ENERGY INC 621,810.00 340 0.00 0 0.00 0
2017 XTO ENERGY INC 771,357.00 365 0.00 0 0.00 0
2018 XTO ENERGY INC 522,550.58 294 0.00 0 0.00 0
2019 XTO ENERGY INC 528,000.52 364 0.00 0 0.00 0

For data sources see[6]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2014 XTO ENERGY INC Drill Cuttings 1,207.25 Tons LANDFILL 100403
2015 XTO ENERGY INC Fracing Fluid Waste 825.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 4,651.20 Bbl INJECTION DISPOSAL WELL 34-133-24096
2015 XTO ENERGY INC Produced Fluid 200.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015 XTO ENERGY INC Produced Fluid 23,162.15 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2015 XTO ENERGY INC Produced Fluid 1,366.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2015 XTO ENERGY INC Fracing Fluid Waste 275.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,083.50 Bbl INJECTION DISPOSAL WELL 34-133-24096
2016 XTO ENERGY INC Produced Fluid 330.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2016 XTO ENERGY INC Produced Fluid 5,010.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 1,348.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2016 XTO ENERGY INC Produced Fluid 270.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 850.22 Bbl INJECTION DISPOSAL WELL 34-133-21076
2017 XTO ENERGY INC Produced Fluid 217.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017 XTO ENERGY INC Produced Fluid 1,105.81 Bbl INJECTION DISPOSAL WELL 34-133-24189
2017 XTO ENERGY INC Produced Fluid 2,575.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2017 XTO ENERGY INC Produced Fluid 6,313.96 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 226.10 Bbl INJECTION DISPOSAL WELL 34-133-24096
2018 XTO ENERGY INC Produced Fluid 5,016.05 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018 XTO ENERGY INC Produced Fluid 120.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2019 XTO ENERGY INC Produced Fluid 4,498.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2019 XTO ENERGY INC Produced Fluid 1,395.68 Bbl INJECTION DISPOSAL WELL 34-133-24189
2019 XTO ENERGY INC Produced Fluid 89.69 Bbl INJECTION DISPOSAL WELL 34-133-20114
2019 XTO ENERGY INC Produced Fluid 2,936.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2019 XTO ENERGY INC Produced Fluid 1,206.00 Bbl INJECTION DISPOSAL WELL 34-133-21076

For data sources see[7]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2269358 Primary Facility 2014-05-07 Drilling/Alteration No Violations Noted
2291755 Primary Facility 2014-07-31 Drilling/Alteration No Violations Noted
2295815 Primary Facility 2014-08-06 Routine/Partial Inspection No Violations Noted
2338784 Primary Facility 2015-01-16 Routine/Partial Inspection No Violations Noted
2345014 Primary Facility 2015-02-13 Routine/Partial Inspection No Violations Noted
2523297 Primary Facility 2016-09-27 Routine/Partial Inspection No Violations Noted
2551266 Primary Facility 2017-01-06 Routine/Partial Inspection No Violations Noted
2687354 Primary Facility 2018-01-18 Routine/Partial Inspection No Violations Noted At the time of inspection, well was producing. Well integrity appeared to be in good condition, with no signs of any leaks or spills. Corrosion was only superficial. The well was properly labeled and ER sign remains posted. There were 5 tanks and 4 line heaters within a lined, steel dike. A gas buster was also on site.

A homeowner in the area recently called in. I did not detect any gas during my inspection.

2693271 Primary Facility 2018-02-12 Routine/Partial Inspection No Violations Noted On 2/12/2018, WQS Brian MacQuarrie onsite. Site sign maintained at entrance. Access road maintained. Two post construction infiltration basins maintained. Four wells drilled ( two in production). Five 400 bbl tanks installed within secondary stainless steel containment structure. No apparent issues.
2809343 Primary Facility 2018-11-30 Routine/Partial Inspection No Violations Noted On 11/30/2018, WQS Brian MacQuarrie onsite. Well stimulation activities completed at wells A3H (37-019-22213) and B5H (37-019-22215). Wells 10HB (37-019-22214) and 7H (37-019-22216) shut in. No activity onsite today. Waiting on coil tubing. Twenty-two frac tanks staged onsite. Tank battery consists of five 400bbl tanks in containment. Infiltration basin maintained. Snow on ground during inspection.

For data sources see[8]

References