X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-129-27630"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-129-27630
 
| Well ID: 37-129-27630
| style="height=100%; align=center" rowspan="15" | {{#display_map: 40.172689, -79.530723 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 40.172689, -79.530723 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: H HARTGE 001
 
| Farm/Lease Name: H HARTGE 001
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2009-01-27
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2008-09-12
 
| Permit Date: 2008-09-12
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 40.172689
 
| Latitude: 40.172689
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2008-09-12
 +
| New Permit Application
 +
|-
 +
| 2009-01-27
 +
| Performed Spud Operation
 +
|-
 +
| 2009-02-03
 +
| Drilling Completion
 +
|-
 +
| 2009-02-11
 +
| Perforation
 +
|-
 +
| 2011-05-24
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 169: Line 210:
 
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 
| style="text-align: right;" | 4,797.00
 
| style="text-align: right;" | 4,797.00
 +
| style="text-align: right;" | 334
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 0.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2019
 +
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 +
| style="text-align: right;" | 4,359.00
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 334
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 207: Line 257:
 
| 2018
 
| 2018
 
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
 
| [[KRIEBEL WELLS DISSOLUTION CO LLC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 40.00 Bbl
 
| style="text-align: right;" | 40.00 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE

Latest revision as of 10:53, 16 May 2020

Well Details

Well ID: 37-129-27630
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Mount Pleasant Township
Operator Name: KRIEBEL WELLS DISSOLUTION CO LLC
Well Pad ID:
Farm/Lease Name: H HARTGE 001
License Status:
Spud Date:
Permit Date: 2008-09-12
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 40.172689
Longitude: -79.530723

For data sources see[1][2][3]

Well History

Date Event
2008-09-12 New Permit Application
2009-01-27 Performed Spud Operation
2009-02-03 Drilling Completion
2009-02-11 Perforation
2011-05-24 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 KRIEBEL MINERALS INC 13,044.00 365 0.00 0 0.00 0
2010 KRIEBEL MINERALS INC 23,490.00 365 0.00 0 0.00 0
2011 KRIEBEL MINERALS INC 18,338.00 334 0.00 0 0.00 0
2012 KRIEBEL MINERALS INC 16,439.00 335 0.00 0 0.00 0
2013 KRIEBEL MINERALS INC 12,186.00 334 0.00 0 0.00 0
2014 KRIEBEL MINERALS INC 10,620.00 334 0.00 0 0.00 0
2015 KRIEBEL MINERALS INC 8,649.00 334 0.00 0 0.00 0
2016 KRIEBEL MINERALS INC 8,459.00 335 0.00 0 0.00 0
2017 KRIEBEL WELLS DISSOLUTION CO LLC 6,460.00 334 0.00 0 0.00 0
2018 KRIEBEL WELLS DISSOLUTION CO LLC 4,797.00 334 0.00 0 0.00 0
2019 KRIEBEL WELLS DISSOLUTION CO LLC 4,359.00 334 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2009 KRIEBEL MINERALS INC Drilling 620.00 Bbl Other PA0091472
2009 KRIEBEL MINERALS INC Fracking Fluid 840.00 Bbl Other PA0091472
2018 KRIEBEL WELLS DISSOLUTION CO LLC Produced Fluid 40.00 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0095273

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2524774 Primary Facility 2016-10-03 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tank appeared to be in sound condition. No observation of accelerated erosion or sedimentation in relation the well site or access road.

For data sources see[7]

References