X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-081-20223"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-081-20223
 
| Well ID: 37-081-20223
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.249803, -76.500594 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.249803, -76.500594 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: DETTERICK 8510H
 
| Farm/Lease Name: DETTERICK 8510H
 
|-
 
|-
| License Status: Active
+
| License Status:  
 
|-
 
|-
| Spud Date: 2010-03-19
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2009-12-18
 
| Permit Date: 2009-12-18
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: Y
 
| Unconventional Well: Y
 
|-
 
|-
 
| Configuration: Horizontal Well
 
| Configuration: Horizontal Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.249803
 
| Latitude: 41.249803
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2009-12-18
 +
| New Permit Application
 +
|-
 +
| 2010-03-19
 +
| Performed Spud Operation
 +
|-
 +
| 2010-04-26
 +
| Drilling Completion
 +
|-
 +
| 2010-06-08
 +
| Perforation
 +
|-
 +
| 2012-03-06
 +
| DEVIATED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 101:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 177: Line 218:
 
| 2019
 
| 2019
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| style="text-align: right;" | 27,164.96
+
| style="text-align: right;" | 105,372.59
| style="text-align: right;" | 90
+
| style="text-align: right;" | 364
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
Line 202: Line 243:
 
| 2010
 
| 2010
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Drilling Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
| style="text-align: right;" | 131.00 Bbl
+
| style="text-align: right;" | 262.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| PA0101508
 +
|-
 +
| 2010
 +
| [[XTO ENERGY INC]]
 +
| Fracing Fluid Waste
 +
| style="text-align: right;" | 1,157.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
Line 209: Line 257:
 
| 2010
 
| 2010
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 5,500.00 Bbl
 
| style="text-align: right;" | 5,500.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 216: Line 264:
 
| 2010
 
| 2010
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Drilling Fluid Waste
| style="text-align: right;" | 1,157.00 Bbl
+
| style="text-align: right;" | 131.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0095273
 
| PA0095273
|-
 
| 2010
 
| [[XTO ENERGY INC]]
 
| Fracing Fluid Waste (in Barrels)
 
| style="text-align: right;" | 262.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| PA0101508
 
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Fracing Fluid Waste (in Barrels)
+
| Fracing Fluid Waste
 
| style="text-align: right;" | 130.00 Bbl
 
| style="text-align: right;" | 130.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 237: Line 278:
 
| 2011
 
| 2011
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 1,667.00 Bbl
+
| style="text-align: right;" | 259.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
| WMGR123NC001
+
| WMGR123
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 426.00 Bbl
 
| style="text-align: right;" | 426.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 251: Line 292:
 
| 2011
 
| 2011
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 +
| style="text-align: right;" | 1,667.00 Bbl
 +
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 +
| WMGR123NC001
 +
|-
 +
| 2011
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 
| style="text-align: right;" | 101.00 Bbl
 
| style="text-align: right;" | 101.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 258: Line 306:
 
| 2011
 
| 2011
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 310.00 Bbl
 
| style="text-align: right;" | 310.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
 
| 34-133-21076
 
| 34-133-21076
 
|-
 
|-
| 2011
+
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 259.00 Bbl
+
| style="text-align: right;" | 101.00 Bbl
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
+
| INJECTION DISPOSAL WELL
| WMGR123
+
| 34-133-24189
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 1,503.00 Bbl
 
| style="text-align: right;" | 1,503.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 279: Line 327:
 
| 2012
 
| 2012
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 101.00 Bbl
 
| INJECTION DISPOSAL WELL
 
|  34-133-24189
 
|-
 
| 2012
 
| [[XTO ENERGY INC]]
 
| Produced Fluid (in Barrels)
 
 
| style="text-align: right;" | 101.00 Bbl
 
| style="text-align: right;" | 101.00 Bbl
 
| INJECTION DISPOSAL WELL
 
| INJECTION DISPOSAL WELL
Line 293: Line 334:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 103.00 Bbl
 
| style="text-align: right;" | 103.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 300: Line 341:
 
| 2013
 
| 2013
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 94.00 Bbl
 
| style="text-align: right;" | 94.00 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 307: Line 348:
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 88.50 Bbl
+
| style="text-align: right;" | 218.00 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR123
+
| WMGR119
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
| style="text-align: right;" | 218.00 Bbl
+
| style="text-align: right;" | 88.50 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
| WMGR119
+
| WMGR123
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 87.76 Bbl
 
| style="text-align: right;" | 87.76 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 328: Line 369:
 
| 2016
 
| 2016
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 112.10 Bbl
 
| style="text-align: right;" | 112.10 Bbl
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
 
| RESIDUAL WASTE PROC FAC (GENERAL PERMIT)
Line 335: Line 376:
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 141.93 Bbl
+
| style="text-align: right;" | 100.48 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123
+
| WMGR123NC010
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 100.48 Bbl
+
| style="text-align: right;" | 141.93 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
| WMGR123NC010
+
| WMGR123
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[XTO ENERGY INC]]
 
| [[XTO ENERGY INC]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 130.00 Bbl
 
| style="text-align: right;" | 130.00 Bbl
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| RESIDUAL WASTE PROCESSING FACILITY
 
| WMGR123NW011
 
| WMGR123NW011
 +
|-
 +
| 2019
 +
| [[XTO ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 101.00 Bbl
 +
| REUSE (AT WELL PAD)
 +
|
 
|-
 
|-
 
|}
 
|}
Line 518: Line 566:
 
|-
 
|-
 
|}
 
|}
<!--==== Penalties Applied ====
+
==== Penalties Applied ====
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
 
!scope="col" | Violation ID
 
!scope="col" | Violation ID
Line 529: Line 577:
 
!scope="col" | Amount Collected
 
!scope="col" | Amount Collected
 
|-
 
|-
|}-->
+
| 598626
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 598627
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 598628
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 599918
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
| 599919
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 +
|-
 +
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title =Oil and Gas Compliance Report
 
  | title =Oil and Gas Compliance Report

Revision as of 23:32, 16 May 2020

Well Details

Well ID: 37-081-20223
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Jordan Township
Operator Name: XTO ENERGY INC
Well Pad ID: 146682
Farm/Lease Name: DETTERICK 8510H
License Status:
Spud Date:
Permit Date: 2009-12-18
Well Type: GAS
Unconventional Well: Y
Configuration: Horizontal Well
Conservation: No
Latitude: 41.249803
Longitude: -76.500594

For data sources see[1][2][3]

Well History

Date Event
2009-12-18 New Permit Application
2010-03-19 Performed Spud Operation
2010-04-26 Drilling Completion
2010-06-08 Perforation
2012-03-06 DEVIATED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2009 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2010 XTO ENERGY INC 0.00 0 0.00 0 0.00 0
2011 XTO ENERGY INC 145,224.00 216 0.00 0 0.00 0
2012 XTO ENERGY INC 197,784.00 366 0.00 0 0.00 0
2013 XTO ENERGY INC 159,271.00 365 0.00 0 0.00 0
2014 XTO ENERGY INC 142,274.00 349 0.00 0 0.00 0
2015 XTO ENERGY INC 121,296.00 324 0.00 0 0.00 0
2016 XTO ENERGY INC 119,300.00 350 0.00 0 0.00 0
2017 XTO ENERGY INC 109,060.00 310 0.00 0 0.00 0
2018 XTO ENERGY INC 117,694.96 365 0.00 0 0.00 0
2019 XTO ENERGY INC 105,372.59 364 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 XTO ENERGY INC Fracing Fluid Waste 262.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0101508
2010 XTO ENERGY INC Fracing Fluid Waste 1,157.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2010 XTO ENERGY INC Fracing Fluid Waste 5,500.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2010 XTO ENERGY INC Drilling Fluid Waste 131.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0095273
2011 XTO ENERGY INC Fracing Fluid Waste 130.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR119
2011 XTO ENERGY INC Produced Fluid 259.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2011 XTO ENERGY INC Produced Fluid 426.00 Bbl INJECTION DISPOSAL WELL 34-133-24096
2011 XTO ENERGY INC Produced Fluid 1,667.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC001
2011 XTO ENERGY INC Produced Fluid 101.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE 34-133-24189
2011 XTO ENERGY INC Produced Fluid 310.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2012 XTO ENERGY INC Produced Fluid 101.00 Bbl INJECTION DISPOSAL WELL 34-133-24189
2012 XTO ENERGY INC Produced Fluid 1,503.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012 XTO ENERGY INC Produced Fluid 101.00 Bbl INJECTION DISPOSAL WELL 34-133-21076
2013 XTO ENERGY INC Produced Fluid 103.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013 XTO ENERGY INC Produced Fluid 94.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2014 XTO ENERGY INC Produced Fluid 218.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014 XTO ENERGY INC Produced Fluid 88.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015 XTO ENERGY INC Produced Fluid 87.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2016 XTO ENERGY INC Produced Fluid 112.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2017 XTO ENERGY INC Produced Fluid 100.48 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017 XTO ENERGY INC Produced Fluid 141.93 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018 XTO ENERGY INC Produced Fluid 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2019 XTO ENERGY INC Produced Fluid 101.00 Bbl REUSE (AT WELL PAD)

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1865537 Primary Facility 2010-02-24 Routine/Complete Inspection No Violations Noted
1872817 Primary Facility 2010-03-26 Routine/Complete Inspection No Violations Noted
1925195 Primary Facility 2010-11-01 Routine/Partial Inspection Violation(s) Noted
1929164 Primary Facility 2010-11-16 Follow-up Inspection Outstanding Violations - Viols Req'd
1981584 Primary Facility 2011-06-15 Follow-up Inspection No Violations Noted
2054829 Primary Facility 2012-03-29 Routine/Complete Inspection No Violations Noted
2075038 Primary Facility 2012-06-11 Routine/Complete Inspection No Violations Noted
2094765 Primary Facility 2012-08-15 Routine/Complete Inspection No Violations Noted
2161164 Primary Facility 2013-04-25 Routine/Complete Inspection No Violations Noted
2514925 Primary Facility 2016-08-24 Site Restoration No Violations Noted Notice of Termination/Well Site Restoration Report Inspection; 8/24/2016.

I entered the site at 13:30 to find one well in production. The FWI (Fresh Water Impoundment) and access road have been removed and reclaimed and that area has been returned to agricultural production. The stormwater BMP’s identified in the PCSM (Post Construction Stormwater Management) plan have been implemented and the well site is permanently stabilized. The well site has not been re-graded and restored as the restoration plan indicates. This concept is further reiterated by your submission of the 2-year extension request (approved on 3/23/2016) which provides additional time to restore the site if stormwater is handled for the entire remaining site. I recommend approving the Notice of Termination at this time and denying the Well Site Restoration Report. I encourage you to submit the Well Site Restoration Report when the well site is restored so that permanent stabilization is established by the end of the extension period.

2528548 Primary Facility 2016-10-13 Site Restoration No Violations Noted Well Site Restoration Report Inspection; 10/13/2016.

I entered the site at 12:35 to find one well (081-20223) in production. The FWI (Fresh Water Impoundment) and access road have been removed and reclaimed and that area has been returned to agricultural production. The stormwater BMP’s identified in the PCSM (Post Construction Stormwater Management) plan have been implemented and the well site is permanently stabilized. A 2-year restoration extension was issued on 3/23/2016.

In the last inspection on 8/24/2016, the ESCGP was terminated. Since the last inspection, the ESCGP was modified so that the entire well pad surface can be retained while the well is in production. The operator provided justification that the pad surface is required to accommodate the production/maintenance of the wells and for work-over rig access. I recommend the Well Site Restoration Report be approved. No Violations Noted.

2543865 Primary Facility 2016-12-07 Routine/Complete Inspection No Violations Noted Arrived at 13:40. Weather: sunny. One well in production. Tubin pressure: 410 psi. Two open annuli, no gas detected. Left location @ 14:00.
2801352 Primary Facility 2018-11-09 Routine/Complete Inspection No Violations Noted One well staged for production phase. One each sand and water separator within containment. No leaks detected from production equipment. No violations noted.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1925195 598626 11/01/2010 2010-11-01 402POTNLPOLL - There is a potential for polluting substance(s) reaching Waters of the Commonwealth and may require a permit. Environmental Health & Safety
1925195 598627 11/01/2010 2010-11-01 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1925195 598628 11/01/2010 2010-11-01 301UNPMTIW - Industrial waste was discharged without permit. Environmental Health & Safety
1929164 599918 11/16/2010 2010-11-16 201TAG - Failure to install, in a permanent manner, the permit number on a completed well Administrative
1929164 599919 11/16/2010 2010-11-16 301UNPMTIW - Industrial waste was discharged without permit. Environmental Health & Safety

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
598626
598627
598628
599918
599919

For data sources see[7]

References