X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "37-053-27506"

m
m
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 37-053-27506
 
| Well ID: 37-053-27506
| style="height=100%; align=center" rowspan="15" | {{#display_map: 41.614979, -79.123760 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 41.614979, -79.123760 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 19: Line 19:
 
| Farm/Lease Name: COLLINS 12
 
| Farm/Lease Name: COLLINS 12
 
|-
 
|-
| License Status: Active
+
| License Status: ACTIVE
 
|-
 
|-
| Spud Date: 2003-07-11
+
| Spud Date:  
 
|-
 
|-
 
| Permit Date: 2003-02-20
 
| Permit Date: 2003-02-20
 +
|-
 +
| Well Type: GAS
 
|-
 
|-
 
| Unconventional Well: N
 
| Unconventional Well: N
 
|-
 
|-
 
| Configuration: Vertical Well
 
| Configuration: Vertical Well
 +
|-
 +
| Conservation: No
 
|-
 
|-
 
| Latitude: 41.614979
 
| Latitude: 41.614979
Line 49: Line 53:
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 
  | accessdate = 2019-05-21 }}</ref>
 
  | accessdate = 2019-05-21 }}</ref>
 +
== Well History ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Date
 +
!scope="col" | Event
 +
|-
 +
| 2003-02-20
 +
| New Permit Application
 +
|-
 +
| 2003-07-11
 +
| Performed Spud Operation
 +
|-
 +
| 2003-07-19
 +
| Drilling Completion
 +
|-
 +
| 2003-11-21
 +
| NEWLY DRILLED
 +
|-
 +
|}
 +
For data sources see<ref>{{cite web
 +
| title = Compiled from multiple data sources - see Pennsylvania Oil and Gas Data Sources
 +
| date = 2020-02-27
 +
| url = http://wellwiki.org/wiki/Pennsylvania_Oil_and_Gas_Data_Sources
 +
| accessdate = 2020-02-27 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 71: Line 98:
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Job Percentage by Mass
 
!scope="col" | Mass Used (lb)
 
!scope="col" | Mass Used (lb)
 +
|-
 +
|}-->
 +
 +
<!--== Stimulation Data ==
 +
{| class="wikitable sortable" width="95%"
 +
!scope="col" | Stimulation Date
 +
!scope="col" | Phase Number
 +
!scope="col" | Chemical Agent
 +
!scope="col" | Volume (gal)
 +
!scope="col" | Treating Pressure (psi)
 +
!scope="col" | Breakdown Pressure (psi)
 
|-
 
|-
 
|}-->
 
|}-->
Line 132: Line 170:
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| style="text-align: right;" | 179.50
+
| style="text-align: right;" | 179.5
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 0.00
Line 154: Line 192:
 
| style="text-align: right;" | 9.07
 
| style="text-align: right;" | 9.07
 
| style="text-align: right;" | 120
 
| style="text-align: right;" | 120
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 120
 
|-
 
|-
 
| 2015
 
| 2015
Line 172: Line 210:
 
| style="text-align: right;" | 22.28
 
| style="text-align: right;" | 22.28
 
| style="text-align: right;" | 108
 
| style="text-align: right;" | 108
| style="text-align: right;" | 0.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 +
| style="text-align: right;" | 108
 
|-
 
|-
 
| 2017
 
| 2017
Line 211: Line 249:
 
| 2010
 
| 2010
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 65.29 Bbl
 
| style="text-align: right;" | 65.29 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 218: Line 256:
 
| 2011
 
| 2011
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 11.71 Bbl
 
| style="text-align: right;" | 11.71 Bbl
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
 
| CENTRALIZED TREATMENT PLANT FOR RECYCLE
Line 225: Line 263:
 
| 2014
 
| 2014
 
| [[CATALYST ENERGY INC]]
 
| [[CATALYST ENERGY INC]]
| Produced Fluid (in Barrels)
+
| Produced Fluid
 
| style="text-align: right;" | 13.21 Bbl
 
| style="text-align: right;" | 13.21 Bbl
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 
| CENT WASTE TRT FAC NPDES DISCHARGE
 +
| PA0102784
 +
|-
 +
| 2014
 +
| [[CATALYST ENERGY INC]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 13.21 Bbl
 +
| CENT WASTE TRT FAC NPDES
 
| PA0102784
 
| PA0102784
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 8.93 Bbl
 
| style="text-align: right;" | 8.93 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
Line 239: Line 284:
 
| 2017
 
| 2017
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 25.00 Bbl
+
| style="text-align: right;" | 15.38 Bbl
| REUSE OTHER THAN ROAD SPREADING
+
| ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
| style="text-align: right;" | 15.38 Bbl
+
| style="text-align: right;" | 25.00 Bbl
| ROAD SPREADING
+
| REUSE OTHER THAN ROAD SPREADING
 
|  
 
|  
 
|-
 
|-
 
| 2018
 
| 2018
 
| [[CAMERON ENERGY CO]]
 
| [[CAMERON ENERGY CO]]
| Produced Fluid (in Barrels) RWC 802
+
| Produced Fluid
 
| style="text-align: right;" | 25.00 Bbl
 
| style="text-align: right;" | 25.00 Bbl
 
| REUSE OTHER THAN ROAD SPREADING
 
| REUSE OTHER THAN ROAD SPREADING
 +
|
 +
|-
 +
| 2019
 +
| [[CAMERON ENERGY CO]]
 +
| Produced Fluid
 +
| style="text-align: right;" | 5.23 Bbl
 +
| REUSE AT A CONVENTIONAL WELL SITE IN PA
 
|  
 
|  
 
|-
 
|-
Line 413: Line 465:
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $3,000.00
 
| style="text-align: right;" | $17,000.00
 
| style="text-align: right;" | $17,000.00
 +
|-
 +
| 353077
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="text-align: right;" |
 +
| style="text-align: right;" |
 
|-
 
|-
 
| 369406
 
| 369406

Revision as of 03:22, 17 May 2020

Well Details

Well ID: 37-053-27506
Loading map...
Country: United States
State: Pennsylvania
County: Forest
Municipality: Howe Township
Operator Name: CAMERON ENERGY CO
Well Pad ID:
Farm/Lease Name: COLLINS 12
License Status: ACTIVE
Spud Date:
Permit Date: 2003-02-20
Well Type: GAS
Unconventional Well: N
Configuration: Vertical Well
Conservation: No
Latitude: 41.614979
Longitude: -79.123760

For data sources see[1][2][3]

Well History

Date Event
2003-02-20 New Permit Application
2003-07-11 Performed Spud Operation
2003-07-19 Drilling Completion
2003-11-21 NEWLY DRILLED

For data sources see[4]


Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2006 SYND ENTERPRISES INC 405.79 365 120.50 365 0.00 0
2007 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2008 CATALYST ENERGY INC 249.07 365 53.57 365 0.00 0
2009 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2010 CATALYST ENERGY INC 657.00 365 43.43 365 0.00 0
2011 CATALYST ENERGY INC 179.5 365 0.00 0 0.00 0
2012 CATALYST ENERGY INC 396.43 366 21.64 366 21.07 366
2014 CATALYST ENERGY INC 16.93 120 9.07 120 0 120
2015 CATALYST ENERGY INC 0.00 0 0.00 0 0.00 0
2016 CAMERON ENERGY CO 90.43 108 22.28 108 0 108
2017 CAMERON ENERGY CO 311.04 270 105.59 270 0.00 0
2018 CAMERON ENERGY CO 384.96 270 105.99 270 0.00 0

For data sources see[5]

Waste Data

Period Operator Waste Type Quantity Disposal Method Waste Facility ID
2010 CATALYST ENERGY INC Produced Fluid 65.29 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2011 CATALYST ENERGY INC Produced Fluid 11.71 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 13.21 Bbl CENT WASTE TRT FAC NPDES DISCHARGE PA0102784
2014 CATALYST ENERGY INC Produced Fluid 13.21 Bbl CENT WASTE TRT FAC NPDES PA0102784
2016 CAMERON ENERGY CO Produced Fluid 8.93 Bbl REUSE OTHER THAN ROAD SPREADING
2017 CAMERON ENERGY CO Produced Fluid 15.38 Bbl ROAD SPREADING
2017 CAMERON ENERGY CO Produced Fluid 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2018 CAMERON ENERGY CO Produced Fluid 25.00 Bbl REUSE OTHER THAN ROAD SPREADING
2019 CAMERON ENERGY CO Produced Fluid 5.23 Bbl REUSE AT A CONVENTIONAL WELL SITE IN PA

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1222345 Primary Facility 2003-03-25 Routine/Complete Inspection Violation(s) Noted
1230603 Primary Facility 2003-04-23 Follow-up Inspection Violation(s) Noted
1230747 Primary Facility 2003-04-25 Compliance Evaluation No Violations Noted
1237629 Primary Facility 2003-05-15 Compliance Evaluation Violation(s) Noted
1242002 Primary Facility 2003-06-05 Compliance Evaluation Violation(s) Noted
1255196 Primary Facility 2003-07-22 Drilling/Alteration No Violations Noted
1280287 Primary Facility 2003-10-21 Routine/Complete Inspection Violation(s) Noted

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
1222345 344497 03/25/2003 2003-03-25 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety BMPs not installed
1230603 348343 04/23/2003 2003-04-23 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety Inspected to check on condition of road.
1237629 351299 05/15/2003 2003-05-15 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety work suspended because of rain
1242002 353077 06/05/2003 2003-06-05 102.4 - Failure to minimize accelerated erosion, implement E&S plan, maintain E&S controls. Failure to stabilize site until total site restoration under OGA Sec 206(c)(d) Environmental Health & Safety plan not implemented
1280287 369406 10/21/2003 2003-10-21 91.34A - Failure to take all necessary measures to prevent spill. Inadequate diking, potential pollution Environmental Health & Safety brine tank not diked

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
344497 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
348343 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
351299 120576 CACP - Consent Assessment of Civil Penalty Comply/Closed 2004-05-03 2004-05-03 $3,000.00 $17,000.00
353077
369406 128857 NOV - Notice of Violation Comply/Closed 2003-11-05

For data sources see[7]

References