X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "34-167-28295"

m
m
 
Line 3: Line 3:
 
{| class="wikitable welldetails" width="95%"
 
{| class="wikitable welldetails" width="95%"
 
| Well ID: 34-167-28295
 
| Well ID: 34-167-28295
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.603502572, -81.46011446 | width=100% | height=100% }}
+
| style="height=100%; align=center" rowspan="17" | {{#display_map: 39.6, -81.46 | width=100% | height=100% }}
 
|-
 
|-
 
| Country: United States
 
| Country: United States
Line 29: Line 29:
 
| Final Drill Date: 1986-10-20
 
| Final Drill Date: 1986-10-20
 
|-
 
|-
| Well Total Depth: 2325 ft
+
| Well Total Depth: 2325.00 ft
 
|-
 
|-
 
| Configuration: Vertical
 
| Configuration: Vertical
 
|-
 
|-
| Latitude: 39.603502572
+
| Latitude: 39.600000
 
|-
 
|-
| Longitude: -81.46011446
+
| Longitude: -81.460000
 
|}
 
|}
 
For data sources see<ref>{{cite web
 
For data sources see<ref>{{cite web
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Well History ==
 
== Well History ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 101: Line 101:
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  | title = Risk Based Data Management System - Well and WellHistry Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Perforation Treatments ==
 
== Perforation Treatments ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 120: Line 120:
 
| style="text-align: right;" | 2244
 
| style="text-align: right;" | 2244
 
| style="text-align: right;" | 21
 
| style="text-align: right;" | 21
 +
|-
 +
|
 +
| style="text-align: right;" | 1874
 +
| style="text-align: right;" | 1879
 +
| style="text-align: right;" | 11
 +
|-
 +
|
 +
| style="text-align: right;" | 1874
 +
| style="text-align: right;" | 1879
 +
| style="text-align: right;" | 11
 
|-
 
|-
 
| 2006-09-11
 
| 2006-09-11
Line 130: Line 140:
 
  | title = Risk Based Data Management System - Perfs Table
 
  | title = Risk Based Data Management System - Perfs Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<!--== Fracking Activities ==
 
<!--== Fracking Activities ==
 
==== Fracking Jobs ====
 
==== Fracking Jobs ====
Line 179: Line 189:
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  | title = Risk Based Data Management System - tblStimulation Table
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Production Data ==
 
== Production Data ==
 
{| class="wikitable sortable" width="95%"
 
{| class="wikitable sortable" width="95%"
Line 192: Line 202:
 
| 1987
 
| 1987
 
| [[SPECTRUM OIL CORPORATION]]
 
| [[SPECTRUM OIL CORPORATION]]
| style="text-align: right;" | 4504
+
| style="text-align: right;" | 4504.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1988
 
| 1988
 
| [[SPECTRUM OIL CORPORATION]]
 
| [[SPECTRUM OIL CORPORATION]]
| style="text-align: right;" | 5974
+
| style="text-align: right;" | 5974.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1990
 
| 1990
 
| [[ZINK PETROLEUM CORP]]
 
| [[ZINK PETROLEUM CORP]]
| style="text-align: right;" | 2944
+
| style="text-align: right;" | 2944.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1991
 
| 1991
 
| [[SPENCER RESOURCES INC]]
 
| [[SPENCER RESOURCES INC]]
| style="text-align: right;" | 2468
+
| style="text-align: right;" | 2468.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1992
 
| 1992
 
| [[SPECTRUM OIL CORPORATION]]
 
| [[SPECTRUM OIL CORPORATION]]
| style="text-align: right;" | 1428
+
| style="text-align: right;" | 1428.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 273
 
| style="text-align: right;" | 273
 
|-
 
|-
 
| 1993
 
| 1993
 
| [[SPENCER RESOURCES INC]]
 
| [[SPENCER RESOURCES INC]]
| style="text-align: right;" | 804
+
| style="text-align: right;" | 804.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 243
 
| style="text-align: right;" | 243
 
|-
 
|-
 
| 1996
 
| 1996
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 1609
+
| style="text-align: right;" | 1609.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1997
 
| 1997
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 764
+
| style="text-align: right;" | 764.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 1998
 
| 1998
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 312
+
| style="text-align: right;" | 312.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2000
 
| 2000
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 339
+
| style="text-align: right;" | 339.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2001
 
| 2001
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 295
+
| style="text-align: right;" | 295.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2002
 
| 2002
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 23
+
| style="text-align: right;" | 23.00
| style="text-align: right;" | 7
+
| style="text-align: right;" | 7.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2003
 
| 2003
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 152
+
| style="text-align: right;" | 152.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2004
 
| 2004
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 353
+
| style="text-align: right;" | 353.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2005
 
| 2005
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 172
+
| style="text-align: right;" | 172.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2006
 
| 2006
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 150
+
| style="text-align: right;" | 150.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2007
 
| 2007
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 142
+
| style="text-align: right;" | 142.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2008
 
| 2008
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 170
+
| style="text-align: right;" | 170.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2009
 
| 2009
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 780
+
| style="text-align: right;" | 780.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2010
 
| 2010
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 114
+
| style="text-align: right;" | 114.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2011
 
| 2011
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 356
+
| style="text-align: right;" | 356.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2012
 
| 2012
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 81
+
| style="text-align: right;" | 81.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 366
 
| style="text-align: right;" | 366
 
|-
 
|-
 
| 2013
 
| 2013
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 64
+
| style="text-align: right;" | 64.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2014
 
| 2014
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 107
+
| style="text-align: right;" | 107.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2015
 
| 2015
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 46
+
| style="text-align: right;" | 46.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2016
 
| 2016
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
 
| 2017
 
| 2017
 
| [[G-R CONTRACTING INC]]
 
| [[G-R CONTRACTING INC]]
| style="text-align: right;" | 40
+
| style="text-align: right;" | 40.00
| style="text-align: right;" | 0
+
| style="text-align: right;" | 0.00
 
| style="text-align: right;" | 365
 
| style="text-align: right;" | 365
 
|-
 
|-
Line 356: Line 366:
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  | title = Risk Based Data Management System - Production Table - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Oil and Gas Data
 
  | title = Combined Production - Oil and Gas Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Waste Data ==
 
== Waste Data ==
 
{| class="wikitable sortable"
 
{| class="wikitable sortable"
Line 539: Line 549:
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  | title = Risk Based Data Management System - Production Table - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
<ref>{{cite web
 
<ref>{{cite web
 
  | title = Combined Production - Brine Data
 
  | title = Combined Production - Brine Data
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date = 2019-05-07
+
  | date = 2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
== Inspection Data ==
 
== Inspection Data ==
 
==== Inspections Performed ====
 
==== Inspections Performed ====
Line 556: Line 566:
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Result
 
!scope="col" style="text-align: center"| Inspection Comments
 
!scope="col" style="text-align: center"| Inspection Comments
 +
|-
 +
| -1028753633
 +
| 2011-1-12 0:00:
 +
| AD
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -162481930
 +
| 2016-9-27 0:00:
 +
| TD
 +
| No Violations
 +
| 0.50
 +
|-
 +
| -1706042227
 +
| 2004-12-13 0:00
 +
| PW
 +
| No Violations
 +
|
 +
|-
 +
| -2046002553
 +
| 2004-12-13 0:00
 +
| PW
 +
| No Violations
 +
|
 
|-
 
|-
 
| 0000PL1458
 
| 0000PL1458
Line 592: Line 626:
 
| No Violations
 
| No Violations
 
| Inspection this day found no violations, well producing according to chart, tank has good IDs, poor dike
 
| Inspection this day found no violations, well producing according to chart, tank has good IDs, poor dike
 +
|-
 +
| PL1458
 +
|
 +
| PL
 +
| No Violations
 +
|
 
|-
 
|-
 
|}
 
|}
Line 606: Line 646:
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables
 
  |publisher = [[Ohio Department of Natural Resources]]
 
  |publisher = [[Ohio Department of Natural Resources]]
  | date =  2019-05-07
+
  | date =  2020-11-16
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
 
  | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources
  | accessdate = 2019-05-21 }}</ref>
+
  | accessdate = 2020-11-16 }}</ref>
 
==References==
 
==References==
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
 
[[Category:Ohio Wells]]
 
[[Category:Ohio Wells]]

Latest revision as of 16:04, 11 January 2021

Well Details

Well ID: 34-167-28295
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Aurelius Township
Operator Name: GENESIS RESOURCES LLC
Well Pad ID:
Farm/Lease Name: GEORGIANA OIL CO
License Status: Producing
License Date: 1985-12-10
Spud Date: 1986-10-17
Spud Drilling Contractor:
Final Drill Date: 1986-10-20
Well Total Depth: 2325.00 ft
Configuration: Vertical
Latitude: 39.600000
Longitude: -81.460000

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1985-12-10 Issued Date 12/10/85 Expired Date 12/10/86 Acres 0020000 Tool Type RTA Proposed Formation BEREA/GORDON Proposed Depth 02325 Proposed Drill Depth 02325
Original Spud 1986-10-17
Completed 1986-10-20
Reached Total Depth 1986-10-20
Construction Permit Expires 1986-12-10
CO 1987-01-15 1438 SPECTRUM OIL CORPORATION GeoDate 12/10/85
Completion Report Received 1987-04-06
CO 1992-11-02 2348 TRIAD RESOURCES INC GeoDate 12/10/85
CO 1995-04-21 952 G-R CONTRACTING INC GeoDate 12/10/85
Last Compliance Report 2016-11-17
Change of Owner 2019-01-22 Operator changed from 952, G-R CONTRACTING INC to 9086, GENESIS RESOURCES LLC
Record Last Modified 2019-01-22

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 1874 1879 11
2006-09-11 2234 2244 21
1874 1879 11
1874 1879 11
2006-09-11 2251 2254 7

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
0 0 30000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1987 SPECTRUM OIL CORPORATION 4504.00 0.00 365
1988 SPECTRUM OIL CORPORATION 5974.00 0.00 365
1990 ZINK PETROLEUM CORP 2944.00 0.00 365
1991 SPENCER RESOURCES INC 2468.00 0.00 365
1992 SPECTRUM OIL CORPORATION 1428.00 0.00 273
1993 SPENCER RESOURCES INC 804.00 0.00 243
1996 G-R CONTRACTING INC 1609.00 0.00 365
1997 G-R CONTRACTING INC 764.00 0.00 365
1998 G-R CONTRACTING INC 312.00 0.00 365
2000 G-R CONTRACTING INC 339.00 0.00 365
2001 G-R CONTRACTING INC 295.00 0.00 365
2002 G-R CONTRACTING INC 23.00 7.00 365
2003 G-R CONTRACTING INC 152.00 0.00 365
2004 G-R CONTRACTING INC 353.00 0.00 365
2005 G-R CONTRACTING INC 172.00 0.00 365
2006 G-R CONTRACTING INC 150.00 0.00 365
2007 G-R CONTRACTING INC 142.00 0.00 365
2008 G-R CONTRACTING INC 170.00 0.00 365
2009 G-R CONTRACTING INC 780.00 0.00 365
2010 G-R CONTRACTING INC 114.00 0.00 365
2011 G-R CONTRACTING INC 356.00 0.00 365
2012 G-R CONTRACTING INC 81.00 0.00 366
2013 G-R CONTRACTING INC 64.00 0.00 365
2014 G-R CONTRACTING INC 107.00 0.00 365
2015 G-R CONTRACTING INC 46.00 0.00 365
2016 G-R CONTRACTING INC 0.00 0.00 365
2017 G-R CONTRACTING INC 40.00 0.00 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1987 SPECTRUM OIL CORPORATION Brine 0 365
1988 SPECTRUM OIL CORPORATION Brine 0 365
1990 ZINK PETROLEUM CORP Brine 0 365
1991 SPENCER RESOURCES INC Brine 0 365
1992 SPECTRUM OIL CORPORATION Brine 0 273
1993 SPENCER RESOURCES INC Brine 0 243
1996 G-R CONTRACTING INC Brine 0 365
1997 G-R CONTRACTING INC Brine 0 365
1998 G-R CONTRACTING INC Brine 0 365
2000 G-R CONTRACTING INC Brine 0 365
2001 G-R CONTRACTING INC Brine 0 365
2002 G-R CONTRACTING INC Brine 0 365
2003 G-R CONTRACTING INC Brine 0 365
2004 G-R CONTRACTING INC Brine 0 365
2005 G-R CONTRACTING INC Brine 0 365
2006 G-R CONTRACTING INC Brine 0 365
2007 G-R CONTRACTING INC Brine 0 365
2008 G-R CONTRACTING INC Brine 0 365
2009 G-R CONTRACTING INC Brine 0 365
2010 G-R CONTRACTING INC Brine 0 365
2011 G-R CONTRACTING INC Brine 0 365
2012 G-R CONTRACTING INC Brine 0 366
2013 G-R CONTRACTING INC Brine 0 365
2014 G-R CONTRACTING INC Brine 0 365
2015 G-R CONTRACTING INC Brine 0 365
2016 G-R CONTRACTING INC Brine 0 365
2017 G-R CONTRACTING INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
-1028753633 2011-1-12 0:00: AD No Violations 0.50
-162481930 2016-9-27 0:00: TD No Violations 0.50
-1706042227 2004-12-13 0:00 PW No Violations
-2046002553 2004-12-13 0:00 PW No Violations
0000PL1458 Preliminary Restoration No Violations Preliminary Restoration done information from Data Point
0162481930 2016-09-27 Temporary Abandoned Annular Disposal No Violations The purpose of my inspection today is a status check on a temporarily abandoned annular disposal well. During my inspection the well was equipped with 8.625 inch diameter surface casing, 4.5 inch diameter production casing, 4.5 inch diameter by 2.375 inch diameter swage nipple, and 2.375 inch diameter steel line attached. The well is capable of production. This well is not disposing brine through the annular disposal method. There is not an annular disposal connection plumbed up to the annulus.
1028753633 2011-01-12 Annular Disposal No Violations NO ANNULAR DISPOSAL. Well producing thru casing, valves open, good IDs, small tank, current chart in meter.
1141141649 2006-02-28 Annular Disposal No Violations Re-inspect this day - current chart in meter. Good IDs at small tank, good dike. NO ANNULAR DISPOSAL.
1706042227 2004-12-13 Production Wells No Violations Inspection this day found well producing, current chart in meter, valves open, separator but no tank, good IDs
2046002553 2004-12-13 Production Wells No Violations Inspection this day found no violations, well producing according to chart, tank has good IDs, poor dike
PL1458 PL No Violations

For data sources see[9]

References