If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 3: | Line 3: | ||
{| class="wikitable welldetails" width="95%" | {| class="wikitable welldetails" width="95%" | ||
| Well ID: 34-005-24204 | | Well ID: 34-005-24204 | ||
− | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40. | + | | style="height=100%; align=center" rowspan="17" | {{#display_map: 40.8, -82.34 | width=100% | height=100% }} |
|- | |- | ||
| Country: United States | | Country: United States | ||
Line 29: | Line 29: | ||
| Final Drill Date: 2018-08-25 | | Final Drill Date: 2018-08-25 | ||
|- | |- | ||
− | | Well Total Depth: 4864 ft | + | | Well Total Depth: 4864.00 ft |
|- | |- | ||
| Configuration: Horizontal | | Configuration: Horizontal | ||
|- | |- | ||
− | | Latitude: 40. | + | | Latitude: 40.800000 |
|- | |- | ||
− | | Longitude: -82. | + | | Longitude: -82.340000 |
|} | |} | ||
For data sources see<ref>{{cite web | For data sources see<ref>{{cite web | ||
| title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | | title = Risk Based Data Management System - Well, tblLocational, tblPlugWell, tblInspection, tblCivilTownships and tblPad Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
== Well History == | == Well History == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 77: | Line 77: | ||
| title = Risk Based Data Management System - Well and WellHistry Tables | | title = Risk Based Data Management System - Well and WellHistry Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Perforation Treatments == | <!--== Perforation Treatments == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 135: | Line 135: | ||
| title = Risk Based Data Management System - tblStimulation Table | | title = Risk Based Data Management System - tblStimulation Table | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
<!--== Production Data == | <!--== Production Data == | ||
{| class="wikitable sortable" width="95%" | {| class="wikitable sortable" width="95%" | ||
Line 164: | Line 164: | ||
!scope="col" style="text-align: center"| Inspection Result | !scope="col" style="text-align: center"| Inspection Result | ||
!scope="col" style="text-align: center"| Inspection Comments | !scope="col" style="text-align: center"| Inspection Comments | ||
+ | |- | ||
+ | | -1145991156 | ||
+ | | 2018-7-11 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -115051641 | ||
+ | | 2018-8-22 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -14035933 | ||
+ | | 2018-8-10 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | -433591031 | ||
+ | | 2020-4-13 0:00: | ||
+ | | SO | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| 0014035933 | | 0014035933 | ||
Line 212: | Line 236: | ||
| No Violations | | No Violations | ||
| HAD Drilling moved the concentric drill rig in to set 20 inch conductor casing. Drilling has started. | | HAD Drilling moved the concentric drill rig in to set 20 inch conductor casing. Drilling has started. | ||
+ | |- | ||
+ | | 102461120 | ||
+ | | 2019-3-7 0:00:0 | ||
+ | | SO | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
| 1145991156 | | 1145991156 | ||
Line 248: | Line 278: | ||
| No Violations | | No Violations | ||
| Rick Conley of Columbia Gas stated they would be cementing intermediate casing at 2 PM today. The rig just started running casing in the well. The job is being delayed until the rig gets the casing landed. At that time they will circulate 2 hours to condition the wellbore prior to cementing. | | Rick Conley of Columbia Gas stated they would be cementing intermediate casing at 2 PM today. The rig just started running casing in the well. The job is being delayed until the rig gets the casing landed. At that time they will circulate 2 hours to condition the wellbore prior to cementing. | ||
+ | |- | ||
+ | | 428996199 | ||
+ | | 2018-7-23 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 504021261 | ||
+ | | 2018-8-23 0:00: | ||
+ | | CS | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 627804744 | ||
+ | | 2018-7-24 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 700545296 | ||
+ | | 2018-7-19 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
+ | |- | ||
+ | | 799887734 | ||
+ | | 2018-7-12 0:00: | ||
+ | | DD | ||
+ | | No Violations | ||
+ | | | ||
|- | |- | ||
|} | |} | ||
Line 262: | Line 322: | ||
| title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | | title = Risk Based Data Management System - tblInspection, tblInspFail and tblinspFlDesc Tables | ||
|publisher = [[Ohio Department of Natural Resources]] | |publisher = [[Ohio Department of Natural Resources]] | ||
− | | date = | + | | date = 2020-11-16 |
| url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | | url = http://wellwiki.org/wiki/Ohio_Oil_and_Gas_Data_Sources | ||
− | | accessdate = | + | | accessdate = 2020-11-16 }}</ref> |
==References== | ==References== | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
[[Category:Ohio Wells]] | [[Category:Ohio Wells]] |
Well ID: 34-005-24204 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.8,"lon":-82.34,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Ashland | |
Municipality: Mifflin Township | |
Operator Name: COLUMBIA GAS TRANSMISSION LLC | |
Well Pad ID: | |
Farm/Lease Name: HAROLD EMMONS #1 | |
License Status: Storage Well | |
License Date: 2018-07-11 | |
Spud Date: 2018-07-12 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2018-08-25 | |
Well Total Depth: 4864.00 ft | |
Configuration: Horizontal | |
Latitude: 40.800000 | |
Longitude: -82.340000 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Correction to Well | 2018-02-08 | UPDATE TARGET/TAKE PER AS-DRILLED PLAT |
APP | 2018-07-11 | Proposed Formations:CLINTON SANDSTONE, Issued Date:7/11/2018, Expired Date:7/10/2020 12:00:00 PM, Drilling unit acres:86, Proposed Well Type:GS, Proposed Well Class:POOL |
Reached Total Depth | 2018-08-25 | |
Completion Report Received | 2019-01-22 | |
Record Last Modified | 2019-06-05 | |
Construction Permit Expires | 2020-07-10 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Other Treatment Type | 0 | 0 | 0 | COIL TUBING/ACIDIZING
SEE IMAGES |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
-1145991156 | 2018-7-11 0:00: | DD | No Violations | |
-115051641 | 2018-8-22 0:00: | DD | No Violations | |
-14035933 | 2018-8-10 0:00: | DD | No Violations | |
-433591031 | 2020-4-13 0:00: | SO | No Violations | |
0014035933 | 2018-08-10 | Drill / Deepen / Reopen | No Violations | HAD rig 249 is rigged up on the well and is preparing to resume drilling. |
0102461120 | 2019-03-07 | Storage Well | No Violations | Performed annual inspection for Columbia Gas Storage Well #12606 on 03/07/2019. The well is equipped with a flanged wellhead with 1-master valve and 1-wing valve, and a drip. Well identification is clearly displayed. No problems were noted at the time of the inspection. |
0115051641 | 2018-08-22 | Drill / Deepen / Reopen | No Violations | HAD Drilling reached total depth. The rig is pulling the drill string from the well and preparing to run 7 inch production casing. The cement job is planned for 10 PM. |
0428996199 | 2018-07-23 | Drill / Deepen / Reopen | No Violations | HAD is drilling surface hole at 340 feet on fresh water. |
0504021261 | 2018-08-23 | Casing String Witnessed | No Violations | Halliburton is on location cementing 7 inch production casing in the well. The casing is set on an inflatable packer at 3082 feet. The well circulated during the cement job and no problems were observed. |
0627804744 | 2018-07-24 | Drill / Deepen / Reopen | No Violations | The operator requested inspection to witness surface casing cement. HAD Drilling installed 13.375 inch casing in the well and the casing was cemented by Petroset. The well circulated and cement returned to surface. |
0700545296 | 2018-07-19 | Drill / Deepen / Reopen | No Violations | HAD is on location working on rigging up. They plan to start drilling Monday, 7/23/18. |
0799887734 | 2018-07-12 | Drill / Deepen / Reopen | No Violations | HAD Drilling moved the concentric drill rig in to set 20 inch conductor casing. Drilling has started. |
102461120 | 2019-3-7 0:00:0 | SO | No Violations | |
1145991156 | 2018-07-11 | Drill / Deepen / Reopen | No Violations | HAD Drilling has moved 20 inch casing to the location. The air compressor for the concentric drill rig is on location and a dog house is on location. The permit was issued today. |
1264437714 | 2018-07-17 | Drill / Deepen / Reopen | No Violations | Conductor casing was installed in the well by concentric drilling. The conductor rig is off location. Liner and rig mats are being installed in preparation for the downhole rig. |
1534346944 | 2018-08-15 | Casing String Witnessed | No Violations | The operator requested inspection to witness intermediate casing cement. Petroset Cementing Service cemented the casing in the well. No problems observed. |
1535725791 | 2018-08-29 | Drill / Deepen / Reopen | No Violations | The drilling rig has moved out. Rick Conley of Columbia gas is on location. HAD is moving out support equipment for the rig. |
1536764060 | 2018-09-12 | Drill / Deepen / Reopen | No Violations | Columbia Gas is conducting flow testing on the well. Gas is being flared off. Fesco Petroleum Engineers and Mac Oil personnel are on location. Flaring will be conducted until 6 pm. |
1716426528 | 2018-08-14 | Drill / Deepen / Reopen | No Violations | Rick Conley of Columbia Gas stated they would be cementing intermediate casing at 2 PM today. The rig just started running casing in the well. The job is being delayed until the rig gets the casing landed. At that time they will circulate 2 hours to condition the wellbore prior to cementing. |
428996199 | 2018-7-23 0:00: | DD | No Violations | |
504021261 | 2018-8-23 0:00: | CS | No Violations | |
627804744 | 2018-7-24 0:00: | DD | No Violations | |
700545296 | 2018-7-19 0:00: | DD | No Violations | |
799887734 | 2018-7-12 0:00: | DD | No Violations |
For data sources see[4]