X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0464052816000"

m
m
 
Line 204: Line 204:
 
| style="text-align: right;" | 630.90
 
| style="text-align: right;" | 630.90
 
| style="text-align: right;" | 13
 
| style="text-align: right;" | 13
 +
|-
 +
| 2000-05-15
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 394.00
 +
| style="text-align: right;" | 395.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-05-15
 +
| Cement Plug
 +
| style="text-align: right;" | 305.00
 +
| style="text-align: right;" | 412.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-07-14
 +
| Perforation
 +
| style="text-align: right;" | 214.00
 +
| style="text-align: right;" | 215.00
 +
| style="text-align: right;" | 14
 +
|-
 +
| 2000-07-15
 +
| Remedial Casing Cementing
 +
| style="text-align: right;" | 214.00
 +
| style="text-align: right;" | 215.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2000-07-15
 +
| Cement Plug
 +
| style="text-align: right;" | 190.00
 +
| style="text-align: right;" | 230.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1950-10-11
 
| 1950-10-11
Line 252: Line 282:
 
| style="text-align: right;" | 395.00
 
| style="text-align: right;" | 395.00
 
| style="text-align: right;" | 14
 
| style="text-align: right;" | 14
|-
 
| 2000-05-15
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 394.00
 
| style="text-align: right;" | 395.00
 
| style="text-align: right;" | 0
 
|-
 
| 2000-05-15
 
| Cement Plug
 
| style="text-align: right;" | 305.00
 
| style="text-align: right;" | 412.00
 
| style="text-align: right;" | 0
 
|-
 
| 2000-07-14
 
| Perforation
 
| style="text-align: right;" | 214.00
 
| style="text-align: right;" | 215.00
 
| style="text-align: right;" | 14
 
|-
 
| 2000-07-15
 
| Remedial Casing Cementing
 
| style="text-align: right;" | 214.00
 
| style="text-align: right;" | 215.00
 
| style="text-align: right;" | 0
 
|-
 
| 2000-07-15
 
| Cement Plug
 
| style="text-align: right;" | 190.00
 
| style="text-align: right;" | 230.00
 
| style="text-align: right;" | 0
 
 
|-
 
|-
 
|}
 
|}
Line 411: Line 411:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 04:54, 18 January 2021

Well Details

Well ID: 0464052816000
Loading map...
Location: 00/16-28-046-05W4/0
Location Alias: 00/16-28-46-05 W4M
Location Alias 2: 00/16-28-046-05 W4/00
Country: Canada
Province: Alberta
Township: 046
Meridian: 4
Range: 05
Section: 28
County/Municipality: Municipal District of Wainwright No. 61
Well Name: VANRENA BAXT 16-28-46-5
Operator Name: Topanga Resources Ltd.
License Number: 0001886
License Date: 1950-08-12
License Status: Amended
Spud Date: 1950-09-04
Final Drill Date: 1950-09-29
Well Total Depth: 979.90 m
Surface Hole Latitude: 53.001633
Surface Hole Longitude: -110.660023

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-08-12 Obtained License
1950-09-11 Drill Stem Test Performed
1950-09-14 Drill Stem Test Performed
1950-09-15 Drill Stem Test Performed
1950-09-18 Drill Stem Test Performed
1950-09-27 Drill Stem Test Performed
1950-09-29 Drill Stem Test Performed
1950-09-29 Finished Drilling
1950-10-02 Production Casing Operation Performed
1950-10-11 Perforation Treatment Performed - Bullet Perforation
1971-08-01 Perforation Treatment Performed - Jet Perforation
1971-10-01 Well Mode changed to Drilled and Cased
1975-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1975-03-22 Well Began Production
1975-03-22 Well Fluid changed to Gas
1975-03-22 Well Mode changed to Flowing
1983-12-01 Well Fluid changed to Gas
1983-12-01 Well Mode changed to Suspended
1987-11-29 Perforation Treatment Performed - Cement Squeeze
1987-11-29 Plug Back Performed
1987-11-29 Well Fluid changed to Gas
1987-11-29 Well Mode changed to Abandoned Zone
1987-12-02 Perforation Treatment Performed - Jet Perforation
1987-12-05 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-03-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-03-14 Plug Back Performed
2000-03-17 Well Log Performed
2000-03-27 Perforation Treatment Performed - Jet Perforation
2000-05-15 Perforation Treatment Performed - Cement Plug
2000-05-15 Perforation Treatment Performed - Remedial Casing
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-15 Perforation Treatment Performed - Cement Plug
2000-07-15 Perforation Treatment Performed - Remedial Casing
2000-07-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-10-11 Bullet Perforation 629.70 630.90 13
2000-05-15 Remedial Casing Cementing 394.00 395.00 0
2000-05-15 Cement Plug 305.00 412.00 0
2000-07-14 Perforation 214.00 215.00 14
2000-07-15 Remedial Casing Cementing 214.00 215.00 0
2000-07-15 Cement Plug 190.00 230.00 0
1950-10-11 Bullet Perforation 632.20 633.40 13
1971-08-01 Perforation 708.40 709.60 7
1975-03-19 Packing Device Capped w/Cement 697.10 697.10 0
1987-11-29 Cement Squeeze 629.70 633.40 0
1987-12-02 Perforation 674.50 676.00 10
1987-12-05 Acid Treatment 674.50 676.00 0
2000-03-14 Packing Device Capped w/Cement 520.70 665.40 0
2000-03-27 Perforation 394.00 395.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1975 5824 0.0 0.0 0.0
1976 7336 0.0 0.0 0.0
1977 6576 0.0 0.0 0.0
1978 7206 0.0 0.0 0.0
1979 7819 0.0 0.0 0.0
1980 8402 0.0 0.0 0.0
1981 8202 0.0 0.0 0.0
1982 8606 0.0 0.0 0.0
1983 7563 0.0 0.0 0.0

For data sources see[5]

References