X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0484012904000"

m
m
 
Line 280: Line 280:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 16:48, 18 January 2021

Well Details

Well ID: 0484012904000
Loading map...
Location: 00/04-29-048-01W4/0
Location Alias: 00/04-29-48-01 W4M
Location Alias 2: 00/04-29-048-01 W4/00
Country: Canada
Province: Alberta
Township: 048
Meridian: 4
Range: 01
Section: 29
County/Municipality: County of Vermilion River
Well Name: CREW HZ 100 LLOYD 4-29-48-1
Operator Name: Crew Energy Inc.
License Number: 0367105
License Date: 2006-11-29
License Status: Suspension
Spud Date: 2007-01-28
Final Drill Date: 2007-02-02
Well Total Depth: 957.00 m
Surface Hole Latitude: 53.163383
Surface Hole Longitude: -110.128662

For data sources see[1][2]

Well History

Date Event
2006-11-29 Obtained License
2007-01-29 Surface Casing Operation Performed
2007-01-30 Direction Drilling Operation Performed - Deviate
2007-02-01 Intermediate Casing Operation Performed
2007-02-02 Direction Drilling Operation Performed - Horizontal
2007-02-02 Finished Drilling
2007-02-02 Liner Casing Operation Performed
2007-02-02 Perforation Treatment Performed - Slotted Liner or Casing
2007-02-02 Well Mode changed to Drilled and Cased
2007-02-03 Rig Released
2007-02-03 Well Log Performed
2007-03-16 Well Began Production
2007-03-16 Well Fluid changed to Crude Oil
2007-03-16 Well Mode changed to Pumping
2008-06-08 Perforation Treatment Performed - Chemical Squeeze
2014-06-01 Well Fluid changed to Crude Oil
2014-06-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-01-30 355.00 Deviate (5 - 79 degrees)
2007-02-02 734.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-02-02 Slotted Liner 722.70 957.00 0
2008-06-08 Chemical Squeeze 734.00 957.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 6727 0.0 0.0 0.0
2008 5978 0.0 0.0 0.0
2009 3929 0.0 0.0 0.0
2010 3674 0.0 0.0 0.0
2011 3014 0.0 0.0 0.0
2012 6595 0.0 0.0 0.0
2013 5749 0.0 0.0 0.0

For data sources see[6]

References