If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 223: | Line 223: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0484051612022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.149775,"lon":-110.678621,"icon":""}]} |
Location: 02/12-16-048-05W4/2 | |
Location Alias: 02/12-16-48-05 W4M | |
Location Alias 2: 02/12-16-048-05 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 048 | |
Meridian: 4 | |
Range: 05 | |
Section: 16 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW 102 HZ WILDMERE 12-16-48-5 | |
Operator Name: Crew Energy Inc. | |
License Number: 0490268 | |
License Date: 2018-08-02 | |
License Status: Issued | |
Spud Date: 2018-09-26 | |
Final Drill Date: 2018-10-02 | |
Well Total Depth: 1739.00 m | |
Surface Hole Latitude: 53.149775 | |
Surface Hole Longitude: -110.678621 |
Date | Event |
---|---|
2018-08-02 | Obtained License |
2018-09-27 | Surface Casing Operation Performed |
2018-09-28 | Direction Drilling Operation Performed - Deviate |
2018-09-28 | Direction Drilling Operation Performed - Horizontal |
2018-09-30 | Production Casing Operation Performed |
2018-10-01 | Direction Drilling Operation Performed - Horizontal |
2018-10-02 | Finished Drilling |
2018-10-02 | Perforation Treatment Performed - Open-Hole Completion |
2018-10-02 | Well Log Performed |
2018-10-02 | Well Structure changed to Drain |
2018-10-06 | Rig Released |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2018-09-28 | 253.00 | Deviate (5 - 79 degrees) |
2018-09-28 | 870.00 | Horizontal |
2018-10-01 | 1101.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2018-10-02 | Open Hole/Barefoot Completion | 1041.00 | 1739.00 | 0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2018-10-02 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]