X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0395051615000"

m
m
 
Line 181: Line 181:
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-04-09
+
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3837.10
+
| style="text-align: right;" | 3077.00
| style="text-align: right;" | 3837.20
+
| style="text-align: right;" | 3077.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3776.60
+
| style="text-align: right;" | 2976.50
| style="text-align: right;" | 3776.70
+
| style="text-align: right;" | 2976.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3676.50
+
| style="text-align: right;" | 2875.80
| style="text-align: right;" | 3676.60
+
| style="text-align: right;" | 2875.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3576.10
+
| style="text-align: right;" | 2775.50
| style="text-align: right;" | 3576.20
+
| style="text-align: right;" | 2775.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3476.00
+
| style="text-align: right;" | 2675.10
| style="text-align: right;" | 3476.10
+
| style="text-align: right;" | 2675.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3375.80
+
| style="text-align: right;" | 2601.10
| style="text-align: right;" | 3375.90
+
| style="text-align: right;" | 2601.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
| 2013-04-11
+
| 2013-04-09
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3275.90
+
| style="text-align: right;" | 3837.10
| style="text-align: right;" | 3276.00
+
| style="text-align: right;" | 3837.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3175.80
+
| style="text-align: right;" | 3776.60
| style="text-align: right;" | 3175.90
+
| style="text-align: right;" | 3776.70
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 3077.00
+
| style="text-align: right;" | 3676.50
| style="text-align: right;" | 3077.10
+
| style="text-align: right;" | 3676.60
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2976.50
+
| style="text-align: right;" | 3576.10
| style="text-align: right;" | 2976.60
+
| style="text-align: right;" | 3576.20
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2875.80
+
| style="text-align: right;" | 3476.00
| style="text-align: right;" | 2875.90
+
| style="text-align: right;" | 3476.10
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2775.50
+
| style="text-align: right;" | 3375.80
| style="text-align: right;" | 2775.60
+
| style="text-align: right;" | 3375.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2675.10
+
| style="text-align: right;" | 3275.90
| style="text-align: right;" | 2675.20
+
| style="text-align: right;" | 3276.00
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
 
| 2013-04-11
 
| 2013-04-11
 
| Multi-Stage Fracture
 
| Multi-Stage Fracture
| style="text-align: right;" | 2601.10
+
| style="text-align: right;" | 3175.80
| style="text-align: right;" | 2601.20
+
| style="text-align: right;" | 3175.90
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 497: Line 497:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]
 
[[Category:FracFocus]]
 
[[Category:FracFocus]]

Latest revision as of 19:10, 18 January 2021

Well Details

Well ID: 0395051615000
Loading map...
Location: 00/15-16-039-05W5/0
Location Alias: 00/15-16-39-05 W5M
Location Alias 2: 00/15-16-039-05 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 05
Section: 16
County/Municipality: Clearwater County
Well Name: PSEC WILLGR 15-16-39-5
Operator Name: Prairie Storm Energy Corp.
License Number: 0451687
License Date: 2012-12-10
License Status: Issued
Spud Date: 2013-03-10
Final Drill Date: 2013-03-27
Well Total Depth: 3860.00 m
Surface Hole Latitude: 52.347862
Surface Hole Longitude: -114.651068

For data sources see[1][2]

Well History

Date Event
2012-12-10 Obtained License
2013-03-12 Surface Casing Operation Performed
2013-03-15 Direction Drilling Operation Performed - Deviate
2013-03-18 Direction Drilling Operation Performed - Horizontal
2013-03-20 Intermediate Casing Operation Performed
2013-03-27 Finished Drilling
2013-03-27 Well Log Performed
2013-03-27 Well Mode changed to Drilled and Cased
2013-03-28 Liner Casing Operation Performed
2013-03-29 Rig Released
2013-04-09 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-09 Perforation Treatment Performed - Open-Hole Completion
2013-04-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-21 Well Log Performed
2013-05-11 Well Began Production
2013-05-11 Well Fluid changed to Crude Oil
2013-05-11 Well Mode changed to Flowing
2017-05-01 Well Fluid changed to Crude Oil
2017-05-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-10 Bonanza Drilling Inc. 6 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-15 2050.00 Deviate (5 - 79 degrees)
2013-03-18 2464.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-04-09 Open Hole/Barefoot Completion 3855.00 3860.00 0
2013-04-11 Multi-Stage Fracture 3077.00 3077.10 0
2013-04-11 Multi-Stage Fracture 2976.50 2976.60 0
2013-04-11 Multi-Stage Fracture 2875.80 2875.90 0
2013-04-11 Multi-Stage Fracture 2775.50 2775.60 0
2013-04-11 Multi-Stage Fracture 2675.10 2675.20 0
2013-04-11 Multi-Stage Fracture 2601.10 2601.20 0
2013-04-09 Multi-Stage Fracture 3837.10 3837.20 0
2013-04-11 Multi-Stage Fracture 3776.60 3776.70 0
2013-04-11 Multi-Stage Fracture 3676.50 3676.60 0
2013-04-11 Multi-Stage Fracture 3576.10 3576.20 0
2013-04-11 Multi-Stage Fracture 3476.00 3476.10 0
2013-04-11 Multi-Stage Fracture 3375.80 3375.90 0
2013-04-11 Multi-Stage Fracture 3275.90 3276.00 0
2013-04-11 Multi-Stage Fracture 3175.80 3175.90 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-04-09 2013-04-11 2,334 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 frac oil Not Available 100 75.2256 N/A
PR-6000 (20/40) bulk Trican silica crystalline 14808-60-7 100 22.7736 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.5045 N/A
HB-4 Trican Breaker distillates (petroleum). straight-run middle 64741-44-2 100 0.18 N/A
magnesium oxide 1309-48-4 100 0.18 N/A
HX-4 Trican Crosslinker 2-dibutylaminoethanol 102-81-8 100 0.5656 N/A
ferric sulfate 10028-22-5 100 0.5656 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.1009 N/A
propylene glycol 57-55-6 100 0.1009 N/A
HG-5 Trican Gelling Agent phosphoric acid C8-16 alkylester 115120-49-5 100 0.6494 N/A

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5087 0.0 0.0 0.0
2014 8077 0.0 0.0 0.0
2015 7794 0.0 0.0 0.0
2016 8617 0.0 0.0 0.0
2017 8621 0.0 0.0 0.0
2018 8735 0.0 0.0 0.0
2019 8367 0.0 0.0 0.0
2020 2159 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-03-29 No Incident Encountered 0.00 0.00
2013-04-26 No Incident Encountered 0.00 0.00

For data sources see[9]

References