X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0144192315002"

m
m
 
Line 276: Line 276:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 00:55, 19 January 2021

Well Details

Well ID: 0144192315002
Loading map...
Location: 00/15-23-014-19W4/2
Location Alias: 00/15-23-14-19 W4M
Location Alias 2: 00/15-23-014-19 W4/02
Country: Canada
Province: Alberta
Township: 014
Meridian: 4
Range: 19
Section: 23
County/Municipality: Municipal District of Taber
Well Name: ZARGON RETLAW 15-23-14-19
Operator Name: Zargon Oil & Gas Ltd.
License Number: 0175519
License Date: 1995-01-30
License Status: Issued
Spud Date: 1995-02-05
Final Drill Date: 1995-02-09
Well Total Depth: 1181.00 m
Surface Hole Latitude: 50.193095
Surface Hole Longitude: -112.490165

For data sources see[1][2]

Well History

Date Event
1995-01-30 Obtained License
1995-02-06 Surface Casing Operation Performed
1995-02-09 Finished Drilling
1995-02-09 Production Casing Operation Performed
1995-02-09 Well Log Performed
1995-02-09 Well Mode changed to Drilled and Cased
1995-02-10 Rig Released
1995-02-13 Well Log Performed
1995-02-16 Perforation Treatment Performed - Jet Perforation
1995-02-16 Well Log Performed
2010-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-02 Perforation Treatment Performed - Jet Perforation
2010-03-02 Plug Back Performed
2010-03-02 Well Log Performed
2010-06-10 Perforation Treatment Performed - Fractured
2017-12-19 Well Began Production
2017-12-19 Well Fluid changed to Gas
2017-12-19 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-02-16 Perforation 1130.00 1133.00 18
2010-03-02 Packing Device Capped w/Cement 1117.00 1125.00 0
2010-03-02 Perforation 1089.00 1094.00 17
2010-03-02 Packing Device Capped w/Cement 1122.00 1125.00 0
2010-03-02 Perforation 1089.00 1094.00 17
2010-06-10 Fracture 1089.00 1094.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 212 0.0 0.0 0.0
2018 8102 0.0 0.0 0.0
2019 8026 0.0 0.0 0.0
2020 1440 0.0 0.0 0.0

For data sources see[5]

References