X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

Difference between revisions of "0214092614000"

m
m
 
Line 156: Line 156:
 
| style="text-align: right;" | 468.00
 
| style="text-align: right;" | 468.00
 
| style="text-align: right;" | 7
 
| style="text-align: right;" | 7
 +
|-
 +
| 1984-06-01
 +
| Perforation
 +
| style="text-align: right;" | 398.50
 +
| style="text-align: right;" | 400.50
 +
| style="text-align: right;" | 7
 +
|-
 +
| 1984-06-01
 +
| Selective Jet Perforations
 +
| style="text-align: right;" | 406.50
 +
| style="text-align: right;" | 406.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 1984-06-03
 +
| Fracture
 +
| style="text-align: right;" | 362.40
 +
| style="text-align: right;" | 406.50
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-10-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 451.00
 +
| style="text-align: right;" | 459.00
 +
| style="text-align: right;" | 0
 +
|-
 +
| 2013-10-04
 +
| Packing Device Capped w/Cement
 +
| style="text-align: right;" | 347.00
 +
| style="text-align: right;" | 355.00
 +
| style="text-align: right;" | 0
 
|-
 
|-
 
| 1984-05-27
 
| 1984-05-27
Line 203: Line 233:
 
| style="text-align: right;" | 390.30
 
| style="text-align: right;" | 390.30
 
| style="text-align: right;" | 390.30
 
| style="text-align: right;" | 390.30
| style="text-align: right;" | 0
 
|-
 
| 1984-06-01
 
| Perforation
 
| style="text-align: right;" | 398.50
 
| style="text-align: right;" | 400.50
 
| style="text-align: right;" | 7
 
|-
 
| 1984-06-01
 
| Selective Jet Perforations
 
| style="text-align: right;" | 406.50
 
| style="text-align: right;" | 406.50
 
| style="text-align: right;" | 0
 
|-
 
| 1984-06-03
 
| Fracture
 
| style="text-align: right;" | 362.40
 
| style="text-align: right;" | 406.50
 
| style="text-align: right;" | 0
 
|-
 
| 2013-10-04
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 451.00
 
| style="text-align: right;" | 459.00
 
| style="text-align: right;" | 0
 
|-
 
| 2013-10-04
 
| Packing Device Capped w/Cement
 
| style="text-align: right;" | 347.00
 
| style="text-align: right;" | 355.00
 
 
| style="text-align: right;" | 0
 
| style="text-align: right;" | 0
 
|-
 
|-
Line 451: Line 451:
 
<references/>
 
<references/>
 
__NOEDITSECTION__
 
__NOEDITSECTION__
[[Category:Alberta]][[Category:Wells]]
+
[[Category:Alberta Wells]]

Latest revision as of 01:51, 19 January 2021

Well Details

Well ID: 0214092614000
Loading map...
Location: 00/14-26-021-09W4/0
Location Alias: 00/14-26-21-09 W4M
Location Alias 2: 00/14-26-021-09 W4/00
Country: Canada
Province: Alberta
Township: 021
Meridian: 4
Range: 09
Section: 26
County/Municipality: Special Areas No. 2
Well Name: MAGNUMENERGY JENNER 14-26-21-9
Operator Name: Aeraden Energy Corp.
License Number: 0106842
License Date: 1984-04-25
License Status: Abandoned
Spud Date: 1984-05-15
Final Drill Date: 1984-05-16
Well Total Depth: 515.00 m
Surface Hole Latitude: 50.819063
Surface Hole Longitude: -111.148711

For data sources see[1][2]

Well History

Date Event
1984-04-25 Obtained License
1984-05-16 Finished Drilling
1984-05-16 Production Casing Operation Performed
1984-05-16 Well Mode changed to Drilled and Cased
1984-05-19 Well Log Performed
1984-05-27 Perforation Treatment Performed - Jet Perforation
1984-05-27 Perforation Treatment Performed - Selective Jet Perforations
1984-05-28 Perforation Treatment Performed - Fractured
1984-06-01 Perforation Treatment Performed - Jet Perforation
1984-06-01 Perforation Treatment Performed - Selective Jet Perforations
1984-06-03 Perforation Treatment Performed - Fractured
1984-06-26 Well Began Production
1984-06-26 Well Fluid changed to Gas
1984-06-26 Well Mode changed to Flowing
2013-10-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-04 Plug Back Performed
2013-10-04 Well Abandoned
2013-10-04 Well Fluid changed to Gas
2013-10-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-05-27 Perforation 466.50 468.00 7
1984-06-01 Perforation 398.50 400.50 7
1984-06-01 Selective Jet Perforations 406.50 406.50 0
1984-06-03 Fracture 362.40 406.50 0
2013-10-04 Packing Device Capped w/Cement 451.00 459.00 0
2013-10-04 Packing Device Capped w/Cement 347.00 355.00 0
1984-05-27 Selective Jet Perforations 469.80 469.80 0
1984-05-27 Perforation 472.50 474.00 7
1984-05-27 Selective Jet Perforations 477.50 477.50 0
1984-05-28 Fracture 466.50 477.50 0
1984-06-01 Selective Jet Perforations 362.40 362.40 0
1984-06-01 Selective Jet Perforations 380.50 380.50 0
1984-06-01 Selective Jet Perforations 385.00 385.00 0
1984-06-01 Selective Jet Perforations 390.30 390.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 4473 0.0 0.0 0.0
1985 8603 0.0 0.0 0.0
1986 8706 0.0 0.0 0.0
1987 8752 0.0 0.0 0.0
1988 8759 0.0 0.0 0.0
1989 8004 0.0 0.0 0.0
1990 8607 0.0 0.0 0.0
1991 8757 0.0 0.0 0.0
1992 8783 0.0 0.0 0.0
1993 8139 0.0 0.0 0.0
1994 7901 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 8754 0.0 0.0 0.0
1997 5831 0.0 0.0 0.0
2001 5304 0.0 0.0 0.0
2004 3287 0.0 0.0 0.0
2005 6599 0.0 0.0 0.0
2006 8751 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8764 0.0 0.0 0.0
2009 8512 0.0 0.0 0.0
2010 8711 0.0 0.0 0.0
2011 6551 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References