If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
m |
m |
||
Line 294: | Line 294: | ||
<references/> | <references/> | ||
__NOEDITSECTION__ | __NOEDITSECTION__ | ||
− | [[Category:Alberta | + | [[Category:Alberta Wells]] |
Well ID: 0494020206020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.1951,"lon":-110.189862,"icon":""}]} |
Location: 02/06-02-049-02W4/0 | |
Location Alias: 02/06-02-49-02 W4M | |
Location Alias 2: 02/06-02-049-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 02 | |
Section: 02 | |
County/Municipality: County of Vermilion River | |
Well Name: CREW LLOYD 6-2-49-2 | |
Operator Name: Crew Energy Inc. | |
License Number: 0208229 | |
License Date: 1997-11-10 | |
License Status: Suspension | |
Spud Date: 1997-12-02 | |
Final Drill Date: 1997-12-05 | |
Well Total Depth: 691.00 m | |
Surface Hole Latitude: 53.195100 | |
Surface Hole Longitude: -110.189862 |
Date | Event |
---|---|
1997-11-10 | Obtained License |
1997-12-03 | Surface Casing Operation Performed |
1997-12-05 | Finished Drilling |
1997-12-05 | Well Log Performed |
1997-12-05 | Well Mode changed to Drilled and Cased |
1997-12-06 | Production Casing Operation Performed |
1997-12-06 | Rig Released |
1997-12-20 | Well Began Production |
1997-12-20 | Well Fluid changed to Crude Oil |
1997-12-20 | Well Log Performed |
1997-12-20 | Well Mode changed to Pumping |
1997-12-21 | Perforation Treatment Performed - Jet Perforation |
1998-11-01 | Well Fluid changed to Crude Oil |
1998-11-01 | Well Mode changed to Suspended |
2006-03-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-03-01 | Perforation Treatment Performed - Jet Perforation |
2007-02-05 | Well Fluid changed to Gas |
2007-02-05 | Well Mode changed to Flowing |
2007-12-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2007-12-04 | Plug Back Performed |
2008-06-22 | Perforation Treatment Performed - Jet Perforation |
2008-06-22 | Well Log Performed |
2012-11-30 | Well Fluid changed to Gas |
2012-11-30 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-12-21 | Perforation | 638.50 | 640.00 | 26 |
1997-12-21 | Perforation | 641.50 | 642.50 | 26 |
2006-03-01 | Packing Device Capped w/Cement | 622.00 | 630.00 | 0 |
2006-03-01 | Perforation | 595.50 | 597.00 | 39 |
2007-12-04 | Packing Device Capped w/Cement | 621.00 | 629.00 | 0 |
2008-06-22 | Perforation | 595.50 | 598.50 | 26 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1998 | 72 | 0.0 | 0.0 | 0.0 |
2007 | 6995 | 0.0 | 0.0 | 0.0 |
2008 | 4723 | 0.0 | 0.0 | 0.0 |
2011 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[5]